CEE 4100 Exam 1 Questions and Correct Solutions
- Exam (elaborations) • 9 pages • 2024
-
- $15.49
- + learn more
CEE 4100 Exam 1 Questions and Correct Solutions 
Activity Labor Cost - CORRECT ANSWER-duration x hourly crew labor cost 
Advertisement for construction - CORRECT ANSWER-request for eligibility to bid - right to reject bids 
Architect/Engineer - CORRECT ANSWER-•professional that designs project. Usually direct employee of owner by contract 
Bid Bond - CORRECT ANSWER-Ensures bidder stays with the project 
Bid Solicitation or Advertisement for Bid - CORRECT ANSWER-contains information regarding b...
-
CDT Exam Practice Questions With 100% Correct Answers
- Exam (elaborations) • 21 pages • 2024
- Available in package deal
-
- $13.49
- + learn more
CDT Exam Practice Questions With 100% 
Correct Answers 
What are the four project teams? 
a. Owner, Facilities, Architect, CM/A 
b. Contractor, Supplier, AHJ, A/E 
c. Owner, Design, Contractor, Supplier 
d. A/E, Subs, AHJ, Facilities Manager - answerc. Owner, Design, Contractor, Supplier 
What are the Stages of the Facility Life Cycle? 
a. Project Conception, Design, Procurement, Construction 
b. Project Conception, Design, Construction Documents, Procurement, Construction, Facility 
Management ...
-
Geotechnical Design Exam Review Questions and Answers Graded A+
- Exam (elaborations) • 29 pages • 2024
- Available in package deal
-
- $14.49
- + learn more
Geotechnical Design Exam Review 
Questions and Answers Graded A+ 
What are indicator piles. and how do they benefit the foundation design process? Indicator 
piles are prototype piles that are constructed before the production piles. These prototype piles 
are typically evaluated using pile driving analyzers, load tests, or other means to evaluate their 
load 
capacity. The results of these evaluations are then used to guide the design and construction of 
the 
production piles. In many cases...
-
CDT Exam Practice Questions With 100% Correct Answers
- Exam (elaborations) • 21 pages • 2024
- Available in package deal
-
- $13.49
- + learn more
CDT Exam Practice Questions With 100% 
Correct Answers 
What are the four project teams? 
a. Owner, Facilities, Architect, CM/A 
b. Contractor, Supplier, AHJ, A/E 
c. Owner, Design, Contractor, Supplier 
d. A/E, Subs, AHJ, Facilities Manager - answerc. Owner, Design, Contractor, Supplier 
What are the Stages of the Facility Life Cycle? 
a. Project Conception, Design, Procurement, Construction 
b. Project Conception, Design, Construction Documents, Procurement, Construction, Facility 
Management ...
-
ICC Soils 1 – 130 TEST QUESTIONS LATELY UPDATED
- Exam (elaborations) • 17 pages • 2023
- Available in package deal
-
- $12.99
- + learn more
ICC Soils 1 – 130 TEST 
QUESTIONS LATELY UPDATED 
Who hires the Special inspector? - ANSWER The Owner or 
Registered Design Professional in Responsible Charge acting as 
the owner's agent. 
The Special Inspector is approved by and shall demonstrate 
competence to the _____. - ANSWER Building Offical 
Registered Design Professional in Responsible Charge 
Upon arrival at a jobsite, the Special Inspector shall check in with 
the _____. - ANSWER Contractor 
SIM p.16 
Final report goes to...?...
Get paid weekly? You can!
-
CDT Exam Practice Questions With 100% Correct Answers
- Exam (elaborations) • 21 pages • 2024
- Available in package deal
-
- $13.49
- + learn more
CDT Exam Practice Questions With 100% 
Correct Answers 
What are the four project teams? 
a. Owner, Facilities, Architect, CM/A 
b. Contractor, Supplier, AHJ, A/E 
c. Owner, Design, Contractor, Supplier 
d. A/E, Subs, AHJ, Facilities Manager - answerc. Owner, Design, Contractor, Supplier 
What are the Stages of the Facility Life Cycle? 
a. Project Conception, Design, Procurement, Construction 
b. Project Conception, Design, Construction Documents, Procurement, Construction, Facility 
Management ...
-
Geotechnical Engineering || A+ Graded Already.
- Exam (elaborations) • 8 pages • 2024
- Available in package deal
-
- $10.49
- + learn more
Soil correct answers defined as the uncemented aggregate of mineral grains and decayed organic matter (solid particles) with liquid and gas in the empty spaces 
between the solid particles. 
 
Soil correct answers used as a construction material in various civil engineering projects, and it supports structural foundations. 
 
Soil Mechanics correct answers branch of science that deals with the study of the physical properties of soil and the behavior of soil masses subjected to various types of ...
-
ICC Soils 1 – 130 TEST QUESTIONS LATELY UPDATED
- Exam (elaborations) • 17 pages • 2023
-
- $12.99
- + learn more
ICC Soils 1 – 130 TEST 
QUESTIONS LATELY UPDATED 
Who hires the Special inspector? - ANSWER The Owner or 
Registered Design Professional in Responsible Charge acting as 
the owner's agent. 
The Special Inspector is approved by and shall demonstrate 
competence to the _____. - ANSWER Building Offical 
Registered Design Professional in Responsible Charge 
Upon arrival at a jobsite, the Special Inspector shall check in with 
the _____. - ANSWER Contractor 
SIM p.16 
Final report goes to...?...
-
AHIT Test Questions and Answers 100%Verified Grade A 2024
- Exam (elaborations) • 20 pages • 2024
-
- $11.99
- + learn more
In an older home, a forced hot air furnace is replaced by a heat pump. The heat coming out of the register is: 
a. Hotter 
b. Cooler 
c. Same 
d. Depends on the air duct layout - b. Cooler 
 
What is the most serious safety hazard with an exterior door? 
a. Door knob set at 3' 6" 
b. A foot quick release, security bracket 
c. Double cylinder dead bolt (keyed inside and outside) - c. Double cylinder dead bolt (keyed inside and outside) 
 
When inspecting kitchen cabinets: 
a. Observe that the...
-
ICC Soils 1 – 130 TEST QUESTIONS LATELY UPDATED
- Exam (elaborations) • 17 pages • 2023
- Available in package deal
-
- $10.19
- + learn more
ICC Soils 1 – 130 TEST 
QUESTIONS LATELY UPDATED 
Who hires the Special inspector? - ANSWER The Owner or 
Registered Design Professional in Responsible Charge acting as 
the owner's agent. 
The Special Inspector is approved by and shall demonstrate 
competence to the _____. - ANSWER Building Offical 
Registered Design Professional in Responsible Charge 
Upon arrival at a jobsite, the Special Inspector shall check in with 
the _____. - ANSWER Contractor 
SIM p.16 
Final report goes to...?...