Drainage basin - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Drainage basin? On this page you'll find 1046 study documents about Drainage basin.

Page 3 out of 1.046 results

Sort by

Practice Questions for NCLEX-PN (Delmar's Practice Questions for Nclex-Pn
  • Practice Questions for NCLEX-PN (Delmar's Practice Questions for Nclex-Pn

  • Exam (elaborations) • 403 pages • 2023
  • Available in package deal
  • Questions You Might Have About the Examination The practice of nursing is regulated by the states to assure the public that only those nurses who have the necessary knowledge and skills are licensed to practice. One requirement for becoming a licensed practical/vocational nurse (LPN/LVN) is graduation from an approved school of practical/vocational nursing. Another requirement is passing an examination. All of the states have agreed to use the same ®® examination, NCLEX-PN . The NCLEX-PN is...
    (1)
  • $31.88
  • 1x sold
  • + learn more
The Water Cycle And Water Insecurity Exam Style Questions And Answers
  • The Water Cycle And Water Insecurity Exam Style Questions And Answers

  • Exam (elaborations) • 12 pages • 2024
  • Available in package deal
  • The Water Cycle And Water Insecurity Exam Style Questions And Answers Describe how deforestation is affecting the Amazon basin - The amount of water  returning to the atmosphere by evapotranspiration is greatly reduced — from  75% to 25% of intercepted water. More precipitation enters the river by runoff.  Overland flow increases the amount of soil erosion. Huge quantities of soil are  entering the rivers and causing extensive silting. Mudslides are increasing in  frequency and sc...
    (1)
  • $21.89
  • + learn more
The Water cycle exam questions
  • The Water cycle exam questions

  • Exam (elaborations) • 8 pages • 2024
  • Explain why water budgets vary between different Drainage basins (6) - Answer--water budgets describe the amount of water within a drainage basin when taking into account that added by precipitation and that lost through evapotranspiration, as well as of run off and changes in storage. One of the reasons this can vary between drainage basins is the physical factors that may effect the basin. For example areas that have high levels of vegetation cover will have high levels of interception and eva...
    (0)
  • $12.49
  • + learn more
The water cycle and water insecurity revision notes for  A Level Edexcel Geography
  • The water cycle and water insecurity revision notes for A Level Edexcel Geography

  • Exam (elaborations) • 27 pages • 2024
  • The water cycle and water insecurity revision notes for A Level Edexcel Geography what is a drainage basin - -a river's drainage basin is the area surrounding it where the rain falling on land flows into that river (river's catchment) -the boundary of the drainage basin is called the watershed -open (with inputs and outputs), the total amount of water changes over time -local hydrological systems what is a large drainage basin - -steep sides (ability to move precipitation into the ...
    (0)
  • $21.39
  • + learn more
PPD Exam Questions & Answers 2024/2025
  • PPD Exam Questions & Answers 2024/2025

  • Exam (elaborations) • 9 pages • 2024
  • Available in package deal
  • PPD Exam Questions & Answers 2024/2025 SITE DESIGN: BLDG LOCATION/IMPROVEMENTS - ANSWERSALL BLDGS DISRUPT DRAINAGE. ACCOMMADATE INCREASED RUNOFF. POSITIVE DRAINAGE AWAY FROM BLDGS. SITE DESIGN: DRAINAGE TYPES - ANSWERSABOVE GROUND OR BELOW GROUND. ABOVE: PERVIOUS PAVING, SHEET FLOW, GUTTERS, SWALES, CHANNELS, AND RUNOFFS. BELOW: PERFORATED DRAINS, ENCLOSED STORM SEWERS TO CITY LINES OR TO NATURAL FEATURE SITE DESIGN: PAVING - ANSWERSMINIMUM SITE PAVING TO BE 1.5% ABOVE GROUND. BELOW G...
    (0)
  • $8.49
  • + learn more
ARE 5.0 - PPD EXAM 2024/2025 WITH 100% CORRECT ANSWERS
  • ARE 5.0 - PPD EXAM 2024/2025 WITH 100% CORRECT ANSWERS

  • Exam (elaborations) • 9 pages • 2024
  • SITE DESIGN: BLDG LOCATION/IMPROVEMENTS correct answersALL BLDGS DISRUPT DRAINAGE. ACCOMMADATE INCREASED RUNOFF. POSITIVE DRAINAGE AWAY FROM BLDGS. SITE DESIGN: DRAINAGE TYPES correct answersABOVE GROUND OR BELOW GROUND. ABOVE: PERVIOUS PAVING, SHEET FLOW, GUTTERS, SWALES, CHANNELS, AND RUNOFFS. BELOW: PERFORATED DRAINS, ENCLOSED STORM SEWERS TO CITY LINES OR TO NATURAL FEATURE SITE DESIGN: PAVING correct answersMINIMUM SITE PAVING TO BE 1.5% ABOVE GROUND. BELOW GROUND 0.3% SITE DESIGN:...
    (0)
  • $16.49
  • + learn more
NAU GLG 112 FINAL EXAM  Questions and Answers(A+ Solution guide)
  • NAU GLG 112 FINAL EXAM Questions and Answers(A+ Solution guide)

  • Exam (elaborations) • 8 pages • 2024
  • Available in package deal
  • The type of magma associated with oceanic hot spots - mafic Decompression melting in this setting forms a long, submarine ridge - divergent boundary When mafic magma rising from the mantel rises through this type of crust, it will form int-felsic magma - Continental crust Shield volcanoes may form here, when magma upwells from the asthenosphere - hot spot The type of magma that most commonly forms at subduction zones - int-felsic magma This tectonic setting can form an explosive caldera - ...
    (0)
  • $7.99
  • + learn more
CNA FINAL EXAM/ GRADED A answered questions for CNA exam 2023/Certified Nursing Assistant / (CNA) Exam
  • CNA FINAL EXAM/ GRADED A answered questions for CNA exam 2023/Certified Nursing Assistant / (CNA) Exam

  • Exam (elaborations) • 8 pages • 2023
  • Available in package deal
  • CNA FINAL EXAM/ GRADED A answered questions for CNA exam 2023 CNA Prometric Test 2 1. A nurse aide enters a room just as a resident’s wife slaps the resident. The resident does not seem up set or hurt. What should the nurse aide do? A. Leave the room and close the door to allow privacy. B. Consider if this is normal behavior for this couple. C. Report the observation to the charge nurse immediately D. Tell the wife that she must leave the facility for the day. 2. Which of the following is an e...
    (1)
  • $11.49
  • 4x sold
  • + learn more
ARE 5.0 – PPD exam with 100% Correct | Latest Updated Graded A+
  • ARE 5.0 – PPD exam with 100% Correct | Latest Updated Graded A+

  • Exam (elaborations) • 13 pages • 2024
  • SITE DESIGN: BLDG LOCATION/IMPROVEMENTS - ALL BLDGS DISRUPT DRAINAGE. ACCOMMADATE INCREASED RUNOFF. POSITIVE DRAINAGE AWAY FROM BLDGS. SITE DESIGN: DRAINAGE TYPES - ABOVE GROUND OR BELOW GROUND. ABOVE: PERVIOUS PAVING, SHEET FLOW, GUTTERS, SWALES, CHANNELS, AND RUNOFFS. BELOW: PERFORATED DRAINS, ENCLOSED STORM SEWERS TO CITY LINES OR TO NATURAL FEATURE SITE DESIGN: PAVING - MINIMUM SITE PAVING TO BE 1.5% ABOVE GROUND. BELOW GROUND 0.3% SITE DESIGN: UNDERGROUND ITEMS - STORM DRAINS COLLE...
    (0)
  • $9.49
  • + learn more
Erosion and Sediment Control Correct Questions and Answers!
  • Erosion and Sediment Control Correct Questions and Answers!

  • Exam (elaborations) • 16 pages • 2024
  • Erosion and Sediment Control Correct Questions and Answers! Minimum Standard 1 - ANSWER Stabilization permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site; temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade but will remain dormant for longer than 14 days; permanent stabilization shall be applied to areas that are to be left dormant fo...
    (0)
  • $11.99
  • + learn more