NERC Test 1 Questions with 100% Correct Solutions| Rated A+
- Exam (elaborations) • 19 pages • 2023
- Available in package deal
-
- $11.99
- + learn more
A misoperation occurred when an overhead ground wire on a 230KV transmission line between two substations broke and fell across A phase of the line. One of the line circuit breakers failed to open causing the breaker failure relay to pick up and as a result tripped the entire substation bus off line that the failed circuit breaker was feeding off of. Who is charged with the responsibility to develop procedures to ensure misoperations are reviewed and analyzed to determine proper mitigation plans...
-
My NERC exam questions and verified correct answers 2023
- Exam (elaborations) • 16 pages • 2023
-
- $14.49
- + learn more
A misoperation occurred when an overhead ground wire on a 230KV transmission line between two substations broke and fell across A phase of the line. One of the line circuit breakers failed to open causing the breaker failure relay to pick up and as a result tripped the entire substation bus off line that the failed circuit breaker was feeding off of. Who is charged with the responsibility to develop procedures to ensure misoperations are reviewed and analyzed to determine proper mitigation plans...
-
5/1 NFPA70E Final: NFPA 70E - ELECTRICAL SAFETY TRAINING Exam_2023.
- Exam (elaborations) • 19 pages • 2023
-
- $12.49
- + learn more
5/1 NFPA70E Final: NFPA 70E - ELECTRICAL SAFETY TRAINING Exam_2023. 
 
NFPA 70E, Standard for Electrical Safety in the Workplace, consists of ? chapters; 17 informative annexes; the Foreword to NFPA 70E; and Article 90, Introduction. Chapter 1 is divided into ? articles. 
 
The appointment of the NFPA 70E Committee was announced on January 7, ? , and was formed to assist ? in preparing electrical safety standards that would serve its requirements. 
 
The 1995 edition of NFPA 70E included the con...
-
CSX RCO Study Guide Actual Questions And Answers.
- Exam (elaborations) • 9 pages • 2024
- Available in package deal
-
- $13.09
- + learn more
locomotive, 1000, 6000 - correct answer The _______ is a diesel electric power unit that can produce between _______ and _______ horsepower. 
 
diesel engine, voltage - correct answer A ______ ______ is used to provide power to a generator (alternator) to produce high ______ electrical energy necessary to power the traction motors. 
 
traction motors - correct answer ...
-
Oil burner's test questions 1-200 with correct answers
- Exam (elaborations) • 18 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
Oil burner's test questions 1-200 with correct answers 
In an electric circuit for the wattage to remain the same if the voltage drops, the amperage must - 
Answer ️️ -Increase 
Atomizing type burners were designed to burn which type of fuel - Answer ️️ -Type 2 fuel oil 
Pour point problems with outside above ground fuel tanks can be partially relieved by - Answer ️️ 
-Reducing the pour point of No. 2 fuel oil by blending it with No. 1 fuel oil. 
A fuel oil storage tank cannot be in...
And that's how you make extra money
-
MSSC Maintenance awareness practice test (2022/2023) Rated A+
- Exam (elaborations) • 15 pages • 2023
- Available in package deal
-
- $9.99
- + learn more
MSSC Maintenance awareness practice test (2022/2023) Rated A+ A burn or pungent odor of oil indicates excessive temperature 
A Chain should be replaced when its length becomes ______longer than the original length. 3 percent 
A common sign of a misaligned coupling is _____________. excessive vibration 
A multimeter is a multipurpose devise that can measure voltage, current, and resistance 
A power diagram is used in addition to a ladder diagram to determine_________. All of these (How the input ...
-
Motor controls final exam questions with correct answers
- Exam (elaborations) • 4 pages • 2023
-
- $9.99
- + learn more
T or F. when a machine is installed, the motor, machine, and controls are all interrelated and must be considered and must be considered as a unit - Answer- true 
 
T or F. the most complicated method of starting a motor is across-the-line starting - Answer- false 
 
T or F. push buttons are always shown as normally opens - Answer- false 
 
T or F. limit switches are drawn by adding a wedge to one of the four basic switches - Answer- true 
 
T or F. manual starters are characterized by the fact ...
-
Oil Burner's Test Questions 1-200 (Answered) Correctly To Score A+
- Exam (elaborations) • 12 pages • 2024
-
- $14.99
- + learn more
Oil Burner's Test Questions 1-200 (Answered) Correctly To Score A+ 
 
In an electric circuit for the wattage to remain the same if the voltage drops, the amperage must 
Increase 
Atomizing type burners were designed to burn which type of fuel 
Type 2 fuel oil 
Pour point problems with outside above ground fuel tanks can be partially relieved by 
Reducing the pour point of No. 2 fuel oil by blending it with No. 1 fuel oil. 
A fuel oil storage tank cannot be installed 
In the furnace room with 5...
-
FAL TFM12 BFAT0 QUESTIONS WITH SOLUTIONS 2023
- Exam (elaborations) • 6 pages • 2023
- Available in package deal
-
- $18.49
- + learn more
FAL TFM12 BFAT0 QUESTIONS WITH SOLUTIONS 2023 
If exit doors are unlocked by the fire alarm system, the unlocking function shall occur 
before activation of the public notification appliances in the area 
 
at the same time as the activation of the public notification appliances in that area 
 
 
 
Fire Alarm system wiring, equipment and circuits controlled and powered by the fire alarm system shall be installed in accordance with the requirements of 
NFPA 70 National Electrical Code Article 760...
-
NERC| 125 Questions with 100% Correct Answers | Updated | Guaranteed A+
- Exam (elaborations) • 18 pages • 2023
- Available in package deal
-
- $8.49
- + learn more
A misoperation occurred when an overhead ground wire on a 230KV transmission line between two substations broke and fell across A phase of the line. One of the line circuit breakers failed to open causing the breaker failure relay to pick up and as a result tripped the entire substation bus off line that the failed circuit breaker was feeding off of. Who is charged with the responsibility to develop procedures to ensure misoperations are reviewed and analyzed to determine proper mitigation plans...