Nerc test 1 - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Nerc test 1? On this page you'll find 120 study documents about Nerc test 1.

Page 2 out of 120 results

Sort by

NERC Test Questions & Answers Correct 100%
  • NERC Test Questions & Answers Correct 100%

  • Exam (elaborations) • 2 pages • 2024
  • Available in package deal
  • What is the calculation used for determining inadvertent interchange? - Answer Net actual interchange minus net scheduled interchange Which of the following would be a suitable use for a pseudo-tie? - Answer Accounting for jointly owned generators Which of the following entities may a Balancing Area provide interchange transaction information to? - Answer PSEs involved in the transaction Which of the following elements are NOT contained in the interchange transaction TAG? - Answer Cost ...
    (0)
  • $8.49
  • + learn more
NERC Prep - Bal, Int, & Trans Test Questions & Answers
  • NERC Prep - Bal, Int, & Trans Test Questions & Answers

  • Exam (elaborations) • 21 pages • 2024
  • Available in package deal
  • NERC Prep - Bal, Int, & Trans Test Questions & Answers 1 / 21 1. What group can approve a change in the Disturbance Recovery Period for an Inter￾connection? a. NERC Interconnection Working Group b. NERC Operating Committee c. NERC Regional Council d. NERC Disturbance Analysis Working Group 2. What is the first thing an operator should do after a relay operation? a. Check power system stabilizers b. Notify adjacent Transmission and Bal￾ancing areas c. Check targets and equipment ...
    (0)
  • $13.29
  • + learn more
NERC TEST 200 Exam Questions and Answers Latest 2024/2025 (100% Verified)
  • NERC TEST 200 Exam Questions and Answers Latest 2024/2025 (100% Verified)

  • Exam (elaborations) • 54 pages • 2024
  • NERC TEST 200 Exam Questions and Answers Latest 2024/2025 (100% Verified) When system conditions are such that emergency procedures are expected to be implemented, which of the following actions should be considered first? a. Shed firm load b. Implement Active Load Management c. Return outaged equipment to service d. Request a voltage reduction - c. Return outaged equipment to service 3. If your transmission path is rated for 1200 MW and 1000 MW are scheduled on it, but due to parallel fl...
    (0)
  • $17.99
  • + learn more
NERC Test Questions & Answers(Latest Update 2024)
  • NERC Test Questions & Answers(Latest Update 2024)

  • Exam (elaborations) • 17 pages • 2024
  • Available in package deal
  • What percentage of load gives a 1 Hz change in an island condition? - ANSWER 6-10% (Think 6-10 day island vacation) If ACE is Zero but system Hz is off, what should a system operator do? - ANSWER Nothing! ACE bias and interchange schedule will improve frequency If ACE is Zero, why not adjust generation to help frequency? - ANSWER Could overload equipment, this is a NERC violation When restoring from blackout condition, what should be done with load? - ANSWER All load breakers should be ...
    (0)
  • $12.99
  • + learn more
NERC Prep - Bal, Int, & Trans Test Questions & Answers
  • NERC Prep - Bal, Int, & Trans Test Questions & Answers

  • Exam (elaborations) • 21 pages • 2024
  • Available in package deal
  • NERC Prep - Bal, Int, & Trans Test Questions & Answers 1 / 21 1. What group can approve a change in the Disturbance Recovery Period for an Interconnection? a. NERC Interconnection Working Group b. NERC Operating Committee c. NERC Regional Council d. NERC Disturbance Analysis Working Group 2. What is the first thing an operator should do after a relay operation? a. Check power system stabilizers b. Notify adjacent Transmission and Balancing areas c. Check targets and equipment d. ...
    (0)
  • $13.49
  • + learn more
NERC Test Questions With 100% Accurate Answers Review Soln
  • NERC Test Questions With 100% Accurate Answers Review Soln

  • Exam (elaborations) • 24 pages • 2024
  • Available in package deal
  • NERC Test Questions With 100% Accurate Answers Review Soln 1. What percentage of load gives a 1 Hz change in an island condition? - ANS-6-10% (Think 6-10 day island vacation) 2. If ACE is Zero but system Hz is off, what should a system operator do? - ANS-Nothing! ACE bias and interchange schedule will improve frequency 3. If ACE is Zero, why not adjust generation to help frequency? - ANS-Could overload equipment, this is a NERC violation 4. When restoring from blackout condition, what ...
    (0)
  • $13.49
  • + learn more
NERC Test Questions and Answers(Latest Update 2024)
  • NERC Test Questions and Answers(Latest Update 2024)

  • Exam (elaborations) • 17 pages • 2024
  • NERC Test Questions and Answers(Latest Update 2024) What percentage of load gives a 1 Hz change in an island condition? - ANSWER 6-10% (Think 6-10 day island vacation) If ACE is Zero but system Hz is off, what should a system operator do? - ANSWER Nothing! ACE bias and interchange schedule will improve frequency If ACE is Zero, why not adjust generation to help frequency? - ANSWER Could overload equipment, this is a NERC violation When restoring from blackout condition, what should b...
    (0)
  • $11.99
  • + learn more
NERC Test Questions with Correct Answers Graded A+
  • NERC Test Questions with Correct Answers Graded A+

  • Exam (elaborations) • 22 pages • 2023
  • Available in package deal
  • What percentage of load gives a 1 Hz change in an island condition? -Answer 6-10% (Think 6- 10 day island vacation) If ACE is Zero but system Hz is off, what should a system operator do? -Answer Nothing! ACE bias and interchange schedule will improve frequency If ACE is Zero, why not adjust generation to help frequency? -Answer Could overload equipment, this is a NERC violation When restoring from blackout condition, what should be done with load? -Answer All load breakers should be opene...
    (0)
  • $12.49
  • + learn more
NERC Test Questions with correct answers
  • NERC Test Questions with correct answers

  • Exam (elaborations) • 28 pages • 2023
  • Available in package deal
  • What percentage of load gives a 1 Hz change in an island condition? CORRECT ANSWER 6-10% (Think 6-10 day island vacation) If ACE is Zero but system Hz is off, what should a system operator do? CORRECT ANSWER Nothing! ACE bias and interchange schedule will improve frequency If ACE is Zero, why not adjust generation to help frequency? CORRECT ANSWER Could overload equipment, this is a NERC violation When restoring from blackout condition, what should be done with load? CORRECT ANSWER All ...
    (0)
  • $15.99
  • + learn more