General contractor - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about General contractor? On this page you'll find 5781 study documents about General contractor.
Page 2 out of 5.781 results
Sort by
-
CDT Exam Questions With Correct Answers 100% Solved
- Exam (elaborations) • 42 pages • 2024
-
- $14.49
- 2x sold
- + learn more
CDT Exam Questions With Correct Answers 
100% Solved 
Which of these documents, might we find in the 
Project Manual but they are not contract documents? 
(A) The Agreement 
(B) Procurement Documents 
(C) Addendum 
(D) Supplemental Conditions - answerAnswer: B 
Reference: PDPG 11.1.6 
Explanation: Procurement requirements are 
addressed to prospective bidders or proposers 
interested in the project. Although not necessarily 
part of a contract, the procurement requirements are 
usually bound wit...
-
CSLB CONTRACTOR'S EXAM PRACTICE QUESTIONS AND ANSWERS LATEST UPDATE 2023-2024
- Exam (elaborations) • 24 pages • 2023
- Available in package deal
-
- $14.49
- 3x sold
- + learn more
CSLB CONTRACTOR'S EXAM PRACTICE QUESTIONS AND ANSWERS LATEST UPDATE 2023-2024. Which act establishes the rights of workers to organize into unions and negotiate 
contracts? - Answer National Labor Relations Act of 1935 
A contractor has had a problem with employees stealing tools and equipment from 
job sites. When conducting job interviews, may the contractor ask prospective 
employees about their arrest records? 
 
A. It is legal to ask prospective employees about arrests not leading to convi...
-
CSLB B LICENSE GENERAL CONTRACTOR EXAM
- Exam (elaborations) • 30 pages • 2024
-
- $13.49
- + learn more
If unused mortar stiffens due to hydration of cement, what must you do? - Answer-Discard the mortar 
 
What minimum time must you wait before caulking or grouting new tiles? - Answer-24-48 Hours 
 
How long should you wait before installing tile on a shower pan? - Answer-24 Hours 
 
Unstable dry rock, angular gravel, sandy loam, and cohesive soils having compressive strengths greater than 0.5 and less than 1.5 tons/sq ft (tsf), are typical examples of: - Answer-Type-B Soils 
 
If 65 street light...
-
CSLB B LICENSE GENERAL CONTRACTOR EXAM
- Exam (elaborations) • 53 pages • 2024
-
- $17.99
- + learn more
CSLB B LICENSE GENERAL CONTRACTOR EXAM
-
VA Contractor General Questions Verified answers latest update
- Exam (elaborations) • 7 pages • 2024
- Available in package deal
-
- $13.99
- 1x sold
- + learn more
VA Contractor General Questions Verified answers latest update
Make study stress less painful
-
CSLB B LICENSE GENERAL CONTRACTOR EXAM LATEST 2024/2025 QUESTIONS AND CORRECT ANSWERS(100% CORRECT VERIFIED ANSWERS)ALREADY GRADED A+
- Exam (elaborations) • 52 pages • 2024
- Available in package deal
-
- $20.99
- + learn more
CSLB B LICENSE GENERAL CONTRACTOR EXAM LATEST 2024/2025 QUESTIONS AND CORRECT ANSWERS(100% CORRECT VERIFIED ANSWERS)ALREADY GRADED A+
-
Fdny p-99 c of f Exam 2024 Questions & Answers (RATED A+)
- Exam (elaborations) • 6 pages • 2024
-
- $10.49
- 4x sold
- + learn more
What is a general requirement of the location of the installation of a boiler? - ANSWERSAdequate clearance from combustile construction 
 
What temperature must the materials remain under during combustion? - ANSWERS170 degrees 
 
What is a requirement for the access of the boiler? - ANSWERSAccess for operation and maintenance must not be hazardous 
 
What is required upon installation to operate a boiler? - ANSWERSInspection and test resulting in equipment use permit from commissioner 
 
How of...
-
CSLB B LICENSE GENERAL CONTRACTOR EXAM 2024/2025
- Exam (elaborations) • 62 pages • 2024
-
- $16.49
- + learn more
CSLB B LICENSE GENERAL CONTRACTOR EXAM 2024/2025
-
CSLB B LICENSE GENERAL CONTRACTOR EXAM QUESTIONS & ANSWERS 2024 ( A+ GRADED 100% VERIFIED)
- Exam (elaborations) • 62 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
CSLB B LICENSE GENERAL CONTRACTOR EXAM QUESTIONS & ANSWERS 2024 ( A+ GRADED 100% VERIFIED)
-
CDT Exam Questions & Answers | 100% Correct Answers | Verified | Latest 2024 Version
- Exam (elaborations) • 23 pages • 2024
- Available in package deal
-
- $12.49
- 1x sold
- + learn more
1. The method of computation of Contractor's overhead and profits for Change Order prices, where both 
additions and deletions are involved, is found in the: 
a) Agreement. 
b) Conditions of the Contract. 
c) Division 01. 
d) Instructions to Bidders. - b) Conditions of the Contract. 
2. General Requirements are part of: 
a) Supplementary Conditions. 
b) Bidding Requirements. 
c) Specifications. 
d) Summary of Work. - c) Specifications. 
3. The three essential considerations in the evaluation of...
Study stress? For sellers on Stuvia, these are actually golden times. KA-CHING! Earn from your study resources too and start uploading now. Discover all about earning on Stuvia