CMGT 410 Midterm #2 Questions & Answers 100% Correct!
  • CMGT 410 Midterm #2 Questions & Answers 100% Correct!

  • Exam (elaborations) • 2 pages • 2024
  • Available in package deal
  • Three Safety Considerations when working with cofferdams. - ANSWER1. People working inside the cofferdam 2. Areas surrounding jobsite that would be affected by spillage 3. Falls into the cofferdam Scour - ANSWERErosion of banks and earth surrounding a cofferdam from excess flows and differing water conditions due to the cofferdam being built. Steel Sheet Piling - ANSWER Soldier Pile and Lagging - ANSWER Soil Nails - ANSWER Secant Pile - ANSWER T or F: Soldier Pile Walls are v...
    (0)
  • $14.99
  • + learn more
CMGT 410 Exams Questions & Answers 100% Correct!
  • CMGT 410 Exams Questions & Answers 100% Correct!

  • Exam (elaborations) • 2 pages • 2024
  • Available in package deal
  • Scrum - ANSWERA framework within which people can address complex adaptive problems, while productively and creatively delivering products of the highest possible value. Agile - ANSWERThe ability to adapt and change directions as needed. Self-organization model - ANSWERA model that optimizes the flexibility of decision making and the courage to be creative Product Owner - ANSWERA Scrum team member whose main job is to maximize the value of the product and the value of the work of the de...
    (0)
  • $14.99
  • + learn more
CMGT 410 Exams Questions & Answers 100% Correct!
  • CMGT 410 Exams Questions & Answers 100% Correct!

  • Exam (elaborations) • 2 pages • 2024
  • Available in package deal
  • Scrum - ANSWERA framework within which people can address complex adaptive problems, while productively and creatively delivering products of the highest possible value. Agile - ANSWERThe ability to adapt and change directions as needed. Self-organization model - ANSWERA model that optimizes the flexibility of decision making and the courage to be creative Product Owner - ANSWERA Scrum team member whose main job is to maximize the value of the product and the value of the work of the de...
    (0)
  • $14.49
  • + learn more
CMGT 410 - WEEK 5 - Apply: Post-Test EXAM
  • CMGT 410 - WEEK 5 - Apply: Post-Test EXAM

  • Exam (elaborations) • 38 pages • 2024
  • . All of the following are included in an Agile project charter, except for which one? a) Detailed project scope b) Expected ROI c) Signature and date d) Project goals and objectives: a) Detailed project scope 2. Agile team members have identified a risk in a project and are not able to resolve it due to lack of expertise. You, as a Agile project manager, decided to contract with a third party for resolving the risk. Which of the following risk response strategies have you applied? a) Accept b) ...
    (0)
  • $12.00
  • + learn more
CMGT 410 Midterm #2 Questions & Answers 100% Correct!
  • CMGT 410 Midterm #2 Questions & Answers 100% Correct!

  • Exam (elaborations) • 2 pages • 2024
  • Available in package deal
  • Three Safety Considerations when working with cofferdams. - ANSWER1. People working inside the cofferdam 2. Areas surrounding jobsite that would be affected by spillage 3. Falls into the cofferdam Scour - ANSWERErosion of banks and earth surrounding a cofferdam from excess flows and differing water conditions due to the cofferdam being built. Steel Sheet Piling - ANSWER Soldier Pile and Lagging - ANSWER Soil Nails - ANSWER Secant Pile - ANSWER T or F: Soldier Pile Walls are v...
    (0)
  • $14.99
  • + learn more
CMGT 4100 Test 1 Questions & Answers(RATED A)
  • CMGT 4100 Test 1 Questions & Answers(RATED A)

  • Exam (elaborations) • 4 pages • 2024
  • Available in package deal
  • What info is addressed in the planning and scheduling process? - ANSWER-Planning- "what" is going to be done, "how", "where", and by "whom" -Scheduling- determining time needed to complete a project Who developed the bar chart - ANSWERHenry Gantt Is A-O-A (or ADM) a version of CPM scheduling? - ANSWERYes What is the difference in determinist and probabilistic durations? Which does A-O-A use? Which does PERT use? - ANSWER-Deterministic schedules - specific durations dates, and t...
    (0)
  • $14.49
  • + learn more
CMGT 410 - Week 5 - Apply: Post-Test Spring 2022
  • CMGT 410 - Week 5 - Apply: Post-Test Spring 2022

  • Exam (elaborations) • 40 pages • 2023
  • CMGT 410 - Week 5 - Apply: Post-Test Spring 2022
    (0)
  • $8.99
  • + learn more
CMGT 410 - Week 5 - Apply: Post-Test Spring 2022
  • CMGT 410 - Week 5 - Apply: Post-Test Spring 2022

  • Exam (elaborations) • 40 pages • 2023
  • CMGT 410 - Week 5 - Apply: Post-Test Spring 2022
    (0)
  • $7.99
  • + learn more
CMGT 410: Temp Structures Mid Term Questions & Answers 100% Correct!
  • CMGT 410: Temp Structures Mid Term Questions & Answers 100% Correct!

  • Exam (elaborations) • 3 pages • 2024
  • Available in package deal
  • True - ANSWERTemporary structures are generally considered means and methods and so the engineer of record is almost always responsible for the design of the temporary structure. True - ANSWERIf Federal OSHA regulations and State OSHA regulations are inconsistent with each other, you can choose to follow whichever one is most convenient for your project. False - ANSWERAll parts of a temporary structure must be removed at the end of a project. True - ANSWERWhen it comes to installing tem...
    (0)
  • $14.99
  • + learn more
CMGT 410: Temp Structures Mid Term Questions & Answers 100% Correct!
  • CMGT 410: Temp Structures Mid Term Questions & Answers 100% Correct!

  • Exam (elaborations) • 3 pages • 2024
  • Available in package deal
  • True - ANSWERTemporary structures are generally considered means and methods and so the engineer of record is almost always responsible for the design of the temporary structure. True - ANSWERIf Federal OSHA regulations and State OSHA regulations are inconsistent with each other, you can choose to follow whichever one is most convenient for your project. False - ANSWERAll parts of a temporary structure must be removed at the end of a project. True - ANSWERWhen it comes to installing tem...
    (0)
  • $15.49
  • + learn more