C172 sample test - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about C172 sample test? On this page you'll find 225 study documents about C172 sample test.

Page 2 out of 225 results

Sort by

ACI Concrete Field Testing Technician - Grade 1 (18) Exam Questions and Answers 2024 Correctly done
  • ACI Concrete Field Testing Technician - Grade 1 (18) Exam Questions and Answers 2024 Correctly done

  • Exam (elaborations) • 29 pages • 2024
  • Available in package deal
  • ASTM C1064 - Answer-Standard Test Method For Temperature of Freshly Mixed Hydraulic-Cement Concrete The end of the temperature sensing portion of the temperature measuring device shall be submerged a minimum of ____ into the freshly mixed concrete. - Answer-3 inches [75 mm] C1064, Sec. 8.1 The temperature measuring device shall have a capacity of measuring the temperature of freshly mixed concrete to ± ____ °F (± ____ °C) throughout a range of ____ °F ( ____ °C). - Answer-±1 °F (±...
    (0)
  • $8.39
  • + learn more
ACI- Concrete Field-Testing Technician - Grade 1 Exam Q’s & A’s 2024
  • ACI- Concrete Field-Testing Technician - Grade 1 Exam Q’s & A’s 2024

  • Exam (elaborations) • 52 pages • 2024
  • Available in package deal
  • ACI- Concrete Field-Testing Technician - Grade 1 Exam Q’s & A’s 2024 Q1. Start molding specimens for strength tests within 30 minutes after fabricating the composite sample. A. True B. False -Answer-B. False ASTM C172 -Para (4.1.2) - Start molding. specimens for strength tests within 15 min after fabricating the composite sample. Q2. The maximum allowable time between obtaining the first and last portions of the composite sample may not exceed 5 minutes. A. True B. False -Answer-...
    (0)
  • $13.49
  • + learn more
ACI- Concrete Field-Testing Technician - Grade 1 Questions and Answers 100% Solved correctly
  • ACI- Concrete Field-Testing Technician - Grade 1 Questions and Answers 100% Solved correctly

  • Exam (elaborations) • 43 pages • 2024
  • Available in package deal
  • Q1. Start molding specimens for strength tests within 30 minutes after fabricating the composite sample. A. True B. False - B. False ASTM C172 -Para (4.1.2) - Start molding. specimens for strength tests within 15 min after fabricating the composite sample. Q2. The maximum allowable time between obtaining the first and last portions of the composite sample may not exceed 5 minutes. A. True B. False - B. False ASTM C172 - Para (4.1)- The elapsed time shall not exceed 15 min. between obta...
    (0)
  • $7.19
  • + learn more
ACI- Concrete Field-Testing Technician - Grade 1 Questions and Answers Guaranteed A+
  • ACI- Concrete Field-Testing Technician - Grade 1 Questions and Answers Guaranteed A+

  • Exam (elaborations) • 29 pages • 2024
  • Available in package deal
  • ACI- Concrete Field-Testing Technician - Grade 1 Questions and Answers Guaranteed A+ Q1. Start molding specimens for strength tests within 30 minutes after fabricating the composite sample. A. True B. False B. False ASTM C172 -Para (4.1.2) - Start molding. specimens for strength tests within 15 min after fabricating the composite sample. Q2. The maximum allowable time between obtaining the first and last portions of the composite sample may not exceed 5 minutes. A. True B. ...
    (0)
  • $18.49
  • + learn more
ACI Grade 1 - Written Test Questions & 100%  Verified Answers | Latest Update | Already  Graded A+
  • ACI Grade 1 - Written Test Questions & 100% Verified Answers | Latest Update | Already Graded A+

  • Exam (elaborations) • 46 pages • 2024
  • Available in package deal
  • Sampling by this practice covers procedures for obtaining representative samples, on which tests are to be performed to determine ___ with quality requirements of the specifications listed under which the concrete is furnished (C172/C172M-17 = Sampling Freshly Mixed Concrete) : Compliance This practice covers sampling from five types of equipment which are... (C172/C172M17 = Sampling Freshly Mixed Concrete) : Stationary, paving, revolving drum, continous, and open top mixers The elaps...
    (0)
  • $12.49
  • + learn more
ACI- Concrete Field-Testing Technician - Grade  1 Correctly Answered Questions| UpToDate |  Already Graded A+
  • ACI- Concrete Field-Testing Technician - Grade 1 Correctly Answered Questions| UpToDate | Already Graded A+

  • Exam (elaborations) • 63 pages • 2024
  • Available in package deal
  • Q1. Start molding specimens for strength tests within 30 minutes after fabricating the composite sample. A. True B. False ☑: B. False ASTM C172 -Para (4.1.2) - Start molding. specimens for strength tests within 15 min after fabricating the composite sample. Q2. The maximum allowable time between obtaining the first and last portions of the composite sample may not exceed 5 minutes. A. True B. False ☑: B. False EXCELLENCE 2 ASTM C172 - Para (4.1)- The elapsed time shall not e...
    (0)
  • $13.89
  • + learn more
ACI Grade 1 - Written Test 2024 with Complete Solutions
  • ACI Grade 1 - Written Test 2024 with Complete Solutions

  • Exam (elaborations) • 31 pages • 2024
  • Available in package deal
  • ACI Grade 1 - Written Test 2024 with Complete Solutions Sampling by this practice covers procedures for obtaining representative samples, on which tests are to be performed to determine ___ with quality requirements of the specifications listed under which the concrete is furnished (C172/C172M-17 = Sampling Freshly Mixed Concrete) -Answer-Compliance This practice covers sampling from five types of equipment which are... (C172/C172M- 17 = Sampling Freshly Mixed Concrete) -Answer-Stationary...
    (0)
  • $13.49
  • + learn more
ACI- Concrete Field-Testing Technician - Grade  1 Questions & 100% Verified Answers | Latest  Update | Already Graded A+
  • ACI- Concrete Field-Testing Technician - Grade 1 Questions & 100% Verified Answers | Latest Update | Already Graded A+

  • Exam (elaborations) • 63 pages • 2024
  • Available in package deal
  • Q1. Start molding specimens for strength tests within 30 minutes after fabricating the composite sample. A. True B. False : B. False ASTM C172 -Para (4.1.2) - Start molding. specimens for strength tests within 15 min after fabricating the composite sample. Q2. The maximum allowable time between obtaining the first and last portions of the composite sample may not exceed 5 minutes. A. True B. False : B. False 2 | P a g e ASTM C172 - Para (4.1)- The elapsed time shall not exceed ...
    (0)
  • $13.49
  • + learn more
ACI- Concrete Field-Testing Technician - Grade 1 Complete Questions & Answers 100% Verified.
  • ACI- Concrete Field-Testing Technician - Grade 1 Complete Questions & Answers 100% Verified.

  • Exam (elaborations) • 29 pages • 2024
  • Available in package deal
  • Q1. Start molding specimens for strength tests within 30 minutes after fabricating the composite sample. A. True B. False - ANSWER B. False ASTM C172 -Para (4.1.2) - Start molding. specimens for strength tests within 15 min after fabricating the composite sample. Q2. The maximum allowable time between obtaining the first and last portions of the composite sample may not exceed 5 minutes. A. True B. False - ANSWER B. False ASTM C172 - Para (4.1)- The elapsed time shall not e...
    (0)
  • $15.99
  • + learn more
ACI- Concrete Field-Testing Technician - Grade 1 Exam Questions and Answers 100% Pass
  • ACI- Concrete Field-Testing Technician - Grade 1 Exam Questions and Answers 100% Pass

  • Exam (elaborations) • 52 pages • 2024
  • Available in package deal
  • ACI- Concrete Field-Testing Technician - Grade 1 Exam Questions and Answers 100% Pass Q1. Start molding specimens for strength tests within 30 minutes after fabricating the composite sample. A. True B. False - Answer- B. False ASTM C172 -Para (4.1.2) - Start molding. specimens for strength tests within 15 min after fabricating the composite sample. Q2. The maximum allowable time between obtaining the first and last portions of the composite sample may not exceed 5 minutes. A. True B...
    (0)
  • $14.49
  • + learn more