NERC QUESTION SOS WITH 100% CORRECT ANSWERS 2023.
  • NERC QUESTION SOS WITH 100% CORRECT ANSWERS 2023.

  • Exam (elaborations) • 12 pages • 2023
  • Available in package deal
  • Accelerating Power In a GENERATOR, the difference between the MECHANICAL INPUT POWER and the electrical output POWER (assuming no LOSSES). For a GENERATOR's TORQUE ANGLE to change, the GENERATOR must have accelerating POWER. Accumulated Inadvertent The accumulation over time of INADVERTENT ENERGY. The accumulated inadvertent account of a BALANCING AUTHORITY represents the amount of excess ENERGY a BALANCING AUTHORITY has either supplied to the INTERCONNECTION or absorbed from the INTER...
    (0)
  • $13.99
  • + learn more
NERC book quiz| 157 questions| WITH COMPLE SOLUTIONS
  • NERC book quiz| 157 questions| WITH COMPLE SOLUTIONS

  • Exam (elaborations) • 17 pages • 2024
  • Available in package deal
  • NERC book quiz| 157 questions| WITH COMPLE SOLUTIONS You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? Answer--4MW Net actual interchange minus Net scheduled interchange is what? Answer-Inadvertent interchange Suppose your interconnection operators a...
    (0)
  • $10.99
  • + learn more
NERC book quiz| 157 questions| WITH COMPLETE SOLUTIONS
  • NERC book quiz| 157 questions| WITH COMPLETE SOLUTIONS

  • Exam (elaborations) • 12 pages • 2024
  • Available in package deal
  • NERC book quiz| 157 questions| WITH COMPLETE SOLUTIONS You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? - Answer --4MW Net actual interchange minus Net scheduled interchange is what? - Answer -Inadvertent interchange Suppose your interconnection oper...
    (0)
  • $8.99
  • + learn more
NERC book quiz questions (with accurate answers)
  • NERC book quiz questions (with accurate answers)

  • Exam (elaborations) • 18 pages • 2023
  • Available in package deal
  • You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? correct answers -4MW Net actual interchange minus Net scheduled interchange is what? correct answers Inadvertent interchange Suppose your interconnection operators at 59.97 Hz from one minute after midn...
    (0)
  • $12.99
  • + learn more
NERC book quiz with correct answers graded A+
  • NERC book quiz with correct answers graded A+

  • Exam (elaborations) • 18 pages • 2023
  • Available in package deal
  • NERC book quiz with correct answers graded A+ You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? - Answer -4MW Net actual interchange minus Net scheduled interchange is what? - Answer Inadvertent interchange Suppose your interconnection operators at ...
    (0)
  • $9.99
  • + learn more
NERC Certification Practice Questions With Complete Solutions
  • NERC Certification Practice Questions With Complete Solutions

  • Exam (elaborations) • 7 pages • 2023
  • Available in package deal
  • NERC Certification Practice Questions with Complete Solutions A Balancing Authority notices that Operating Reserve has steadily declined throughout the hour. What is the most likely cause? a) Loss of a large generator in the area b) An inaccurate load forecast c) Loss of a major transmission line d) A malfunction of EMS -Answer b) An inaccurate load forecast Balancing Area A notices that the Interconnection frequency is 59.94 Hz and their ACE is 0. Which of the following could be th...
    (0)
  • $9.49
  • + learn more
NERC Certification Practice Questions and Answers (Already GRADED A)
  • NERC Certification Practice Questions and Answers (Already GRADED A)

  • Exam (elaborations) • 13 pages • 2023
  • Available in package deal
  • A Balancing Authority notices that Operating Reserve has steadily declined throughout the hour. What is the most likely cause? a) Loss of a large generator in the area b) An inaccurate load forecast c) Loss of a major transmission line d) A malfunction of EMS b) An inaccurate load forecast Balancing Area A notices that the Interconnection frequency is 59.94 Hz and their ACE is 0. Which of the following could be the cause of this reading? a) A net under-generation in Balancing Area...
    (0)
  • $9.99
  • + learn more
KNOWN NERC EXAM QUESTIONS WITH CORRECT SOLUTIONS( GRADED A+)
  • KNOWN NERC EXAM QUESTIONS WITH CORRECT SOLUTIONS( GRADED A+)

  • Exam (elaborations) • 9 pages • 2023
  • Available in package deal
  • A Balancing Authority notices that Operating Reserve has steadily declined throughout the hour. What is the most likely cause? a) Loss of a large generator in the area b) An inaccurate load forecast c) Loss of a major transmission line d) A malfunction of EMS - b) An inaccurate load forecast Balancing Area A notices that the Interconnection frequency is 59.94 Hz and their ACE is 0. Which of the following could be the cause of this reading? a) A net under-generation in Balancing Ar...
    (0)
  • $10.99
  • + learn more
NERC Reliability Coordinator Exam Vocabulary 2022
  • NERC Reliability Coordinator Exam Vocabulary 2022

  • Exam (elaborations) • 66 pages • 2023
  • Available in package deal
  • Accelerating Power - ANSWER-In a GENERATOR, the difference between the MECHANICAL INPUT POWER and the electrical output POWER (assuming no LOSSES). For a GENERATOR's TORQUE ANGLE to change, the GENERATOR must have accelerating POWER. Accumulated Inadvertent - ANSWER-The accumulation over time of INADVERTENT ENERGY. The accumulated inadvertent account of a BALANCING AUTHORITY represents the amount of excess ENERGY a BALANCING AUTHORITY has either supplied to the INTERCONNECTION or absorbed fr...
    (0)
  • $18.49
  • + learn more
NERC Reliability Coordinator Exam Vocabulary 2023 Questions And Answers
  • NERC Reliability Coordinator Exam Vocabulary 2023 Questions And Answers

  • Exam (elaborations) • 67 pages • 2023
  • Available in package deal
  • NERC Reliability Coordinator Exam Vocabulary 2023 Questions And Answers
    (0)
  • $21.99
  • + learn more