12 strand rope - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about 12 strand rope? On this page you'll find 98 study documents about 12 strand rope.
Page 2 out of 98 results
Sort by
-
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST 2024/2025 (100% CORRECT)
- Exam (elaborations) • 12 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST 2024/2025 (100% CORRECT) What action does a signal person intend the operator to perform if he extends his arm at 
shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom correct answers c. 
2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in 
order for the gross ratings in the load chart to remain valid? 
a. 1% 
b. 2% 
c. 5% 
d. 8%...
-
NEIEP 200 Final Exam (courses 205- 250): Questions & Answers
- Exam (elaborations) • 13 pages • 2024
-
- $17.99
- + learn more
NEIEP 200 Final Exam (courses 205- 250): Questions & Answers 
NEIEP 200 Final Exam (courses 205- 
250): Questions & Answers 
you are about to loosen a fishplate bolt. which wrench would be least likely 
to slip? 
(Ansa. 6 point box end wrench 
b. 12 point box end wrench 
c. open end wrench 
you are using a plumb line to check a rail for plumb. you find that at the top 
it measures 1" and at the bottom it measures 1 1/4". what does this tell 
you? 
(Ansa. the top of the rail needs to go towards...
-
NCCCO Rigger 1 Study Questions With 100% Correct Answers.
- Exam (elaborations) • 6 pages • 2023
- Available in package deal
-
- $7.99
- + learn more
1. A wire rope that is a 6x19 classification could have how many wires per strand? - 15 through 26 
wires per strand 
2. How often should a synthetic web sling be inspected? - Each day before use 
3. Which considerations should be given to suspend lifting operations with a mobile crane? - 
Winds in excess of 35 mph 
4. What is the term that best describes surface wear on a wire rope sling to rubbing or sliding? - 
Abrasion 
5. Which of the following defects discovered during an inspection would ...
-
NCCCO MOBILE CRANE Questions And Answers Graded A+.
- Exam (elaborations) • 12 pages • 2024
-
- $10.99
- + learn more
NCCCO MOBILE CRANE Questions And Answers Graded A+. 
 
 
 
 
 
 
1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - correct answer. c. 
 
2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? 
a. 1% 
b. 2% 
c. 5% 
d....
-
NCCCO MOBILE CRANE EXAM – 99 QUESTIONS WITH 100% CORRECT ANSWERS
- Exam (elaborations) • 17 pages • 2023
- Available in package deal
-
- $15.99
- + learn more
1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom 
c. 
 
 
 
2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? 
a. 1% 
b. 2% 
c. 5% 
d. 8% 
a. 
 
 
 
3. The load line of the crane you're operating contacts an energized powe...
Fear of missing out? Then don’t!
-
OECP Test Questions with 100%Complete Solutions
- Exam (elaborations) • 32 pages • 2024
-
- $13.49
- + learn more
OECP Test Questions with 100%Complete Solutions 
The offset of the jib has been changed from 25 degree to 15 degree. The capacity of the 
jib will? 
A. Stay the same 
B. Decrease 
C. Offset can't change 
D. Increase - Answer- D. Increase 
When lifting near capacity with a crawler, the lowest ground pressure between center 
pin and the load will be? 
A. Over the front 
B. Over the corner 
C. Over the side 
D. Over the rear - Answer- C. Over the side 
A Truck mounted crane will generally have a h...
-
OECP Test Questions 100% Solutions
- Exam (elaborations) • 19 pages • 2024
-
- $12.99
- + learn more
OECP Test Questions 100% Solutions 
 
The offset of the jib has been changed from 25 degree to 15 degree. The capacity of the jib will? 
 
A. Stay the same 
B. Decrease 
C. Offset can't change 
D. Increase -ANSWER- D. Increase 
 
When lifting near capacity with a crawler, the lowest ground pressure between center pin and the load will be? 
 
A. Over the front 
B. Over the corner 
C. Over the side 
D. Over the rear -ANSWER- C. Over the side 
 
A Truck mounted crane will generally have a highe...
-
TOWER CRANE QUESTIONS AND ANSWERS.
- Exam (elaborations) • 11 pages • 2023
- Available in package deal
-
- $13.49
- + learn more
Which of the following OSHA regulations govern suspended personnel platforms? 
OSHA 1926.1431 
 
 
 
According to ASME B30.3 The prohibited zone for power lines that are 60 kV is 
15 ft 
 
 
 
 
Brainpower 
Read More 
Previous 
Play 
Next 
Rewind 10 seconds 
Move forward 10 seconds 
Unmute 
0:05 
/ 
0:15 
Full screen 
According to ASME B30.3, load hoist rotation resistant wire rope has a design factor of 
5 to 1 
 
 
 
According to ASME B30.3 when Lifting a suspended personnel platform design fa...
-
NCCCO RIGGER 1 STUDY QUESTIONS WITH VERIFIED SOLUTIONS ALREADY GRADED A+.
- Exam (elaborations) • 6 pages • 2023
- Available in package deal
-
- $14.49
- + learn more
1. A wire rope that is a 6x19 classification could have how many wires per strand? 
15 through 26 wires per strand 
 
 
 
2. How often should a synthetic web sling be inspected? 
Each day before use 
 
 
 
3. Which considerations should be given to suspend lifting operations with a mobile crane? 
Winds in excess of 35 mph 
 
 
 
4. What is the term that best describes surface wear on a wire rope sling to rubbing or sliding? 
Abrasion 
 
 
 
5. Which of the following defects discovered during an ...
-
NCCCO tower exam | Questions and answers with 100% correct solutions | A+ Grade
- Exam (elaborations) • 5 pages • 2024
- Available in package deal
-
- $12.48
- + learn more
When tower crane is erected/dismantled, written instructions must be On site 
Tower crane erection/dismantling shall be performed under direct supervision of the Designated 
person 
What is the minimum clearance from obstruction when the tower crane freely rotates 360•? 6 ft 6 
in 
What must the crane operator do when a load is suspended Remain at the controls 
How often should the hoist rope be lubricated? Every 200 hours 
If block is twisted, it may be necessary to fix the ______________ and...
Do you wonder why so many students wear nice clothes, have money to spare and enjoy tons of free time? Well, they sell on Stuvia! Imagine your study notes being downloaded a dozen times for $15 each. Every. Single. Day. Discover all about earning on Stuvia