___________ is a company or person whom a general contractor hires to 
perform a specific task as part of an overall project and normally pays for 
services provided to the project. - Answer️️ -Specialty Contractor 
Which construction phase has more subcontractors involved? - 
Answer️️ -Interiors phase 
Can a Heavy Civil Specialty Contractor be a General Contractor? - 
Answer️️ -True 
The Egyptians used calcined gypsum as ceme...
-
COSC 153 Final TAMU Exam Study Guide with Complete Solutions
- Exam (elaborations) • 23 pages • 2024
-
- $9.99
- + learn more
COSC 153 Final TAMU Exam Study 
Guide with Complete Solutions 
Aggregate - Answer️️ -A mixture of sand and stone and a major 
component of concrete 
Architect - Answer️️ -One who has completed a course of study in 
building and design, and is licensed by the state as an architect. One who 
draws up plans. 
Backing - Answer️️ -Frame lumber installed between the wall studs to 
give additional support for drywall or an interior trim related item, such as 
handrail brackets, cabinets, an...
-
COSC 153 FINAL EXAM STUDY GUIDE WITH COMPLETE SOLUTIONS
- Exam (elaborations) • 48 pages • 2024
-
- $9.99
- + learn more
-
COSC 153 - Chapter 13 RQ & Terms Study Guide with Complete Solutions
- Exam (elaborations) • 4 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
COSC 153 - Chapter 13 RQ & Terms 
Study Guide with Complete Solutions 
What are the three fundamental objectives of a quality management plan? - 
Answer️️ -Do things the right the first time, prevent things from going 
wrong in the first place, continually improve the construction process. 
What is the difference between quality control and quality assurance? - 
Answer️️ -Control addresses quality at the project level and deals with 
conformance to the plans and specs through submittals,...
Make study stress less painful
-
Cooke's Cumulative COSC 153 FINAL Exam Practice Questions and Answers
- Exam (elaborations) • 22 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
Cooke's Cumulative COSC 153 FINAL 
Exam Practice Questions and Answers 
What are the fundamental objectives of a quality management plan? - 
Answer️️ -Do it right the first time, 
Mistake Prevention, and 
Continuous Improvement 
Quality Control is the ____________ that ensures the quality required by 
the plans and specifications. - Answer️️ -PROGRAM 
Quality Assurance is the __________ that achieve the quality required by 
the plans and specifications. - Answer️️ -PROCESS 
Quality ...
-
COSC 153 EXAM 1 PRACTICE QUESTIONS AND ANSWERS
- Exam (elaborations) • 10 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
COSC 153 EXAM 1 PRACTICE 
QUESTIONS AND ANSWERS 
In ancient Egypt, architecture, engineering, and construction were all the 
responsibility of one person, called? - Answer️️ -master builder 
5 sectors of the construction industry? - Answer️️ -residential, 
commercial, heavy civil, industrial, & environmental 
3 primary players in an construction project? - Answer️️ -owner, 
designers, & contractors 
apartments, condos, & townhomes are referred to as? - Answer️️ -multi- 
family dw...