Management Science 395 – Exam 1 Notes 
Primary Functions of a Manager: 
- Plan 
- Organize 
- Staff 
- Lead 
- Control 
What does an Operations Manager do? 
“…The systematic design, direction, and control of processes that transform inputs 
into services and products for internal, as well as external customers.” 
Productivity = the value of outputs (services and products) produced divided by the 
value of inputs (labor, materials, equipment, etc.) 
Example: Three employees process 600 in...
-
MGSC 395 EXAM 2 STUDY GUIDE
- Other • 7 pages • 2024
-
- $8.49
- + learn more
MGSC 395 EXAM 2 STUDY GUIDE 
CHAP 5 
Calculate the capacity for a process 
Capacity 
 Maximum rate of output of a process or system 
Calculate the throughput time for a process route (Page 183) 
Throughput 
 The total elapse time from the start to the finish of the job 
Know and understand the bottleneck 
Bottleneck 
 A capacity constraint resource (CCR) whose available capacity limits the organization’s 
ability to meet the product volume, product mix, or demand fluctuation required ...
-
MGSC 395 EXAM 2 STUDY GUIDE.
- Exam (elaborations) • 7 pages • 2024
-
- $9.49
- + learn more
MGSC 395 EXAM 2 STUDY GUIDECHAP 5Calculate the capacity for a processCapacityMaximumrateof output of a process or systemCalculate the throughput time for a process route (Page 183)ThroughputThe total elapse time from the start to the finish of the jobKnow and understand the bottleneckBottleneckA capacity constraint resource (CCR)whose available capacity limits the organization’sabilityto meet the product volume, pro
-
MGSC 395 Management Science 395 – Exam 1 Notes
- Other • 9 pages • 2024
-
- $9.49
- + learn more
Management Science 395 – Exam 1 Notes 
Primary Functions of a Manager: 
- Plan 
- Organize 
- Staff 
- Lead 
- Control 
What does an Operations Manager do? 
“…The systematic design, direction, and control of processes that transform inputs 
into services and products for internal, as well as external customers.” 
Productivity = the value of outputs (services and products) produced divided by the 
value of inputs (labor, materials, equipment, etc.) 
Example: Three employ
-
MGSC 395 TEST 2 Capacity Planning
- Exam (elaborations) • 9 pages • 2024
-
- $9.49
- + learn more
Capacity Planning 
Capacity – Max rate of output of a process or system 
Long Term Capacity – relates primarily to strategic issues involving the firms major 
production facilities 
Short Term Capacity – concerns issues of scheduling, labor shifts, and balancing 
resource capacities the goal of short-term capacity planning is to handle unexpected shifts 
in demand in an efficient economic manner. 
Utilization – degree to which a resource such as equipment, workspace, or workforce is 
cur...
Want to regain your expenses?
-
Operations and Supply Chain Management 395 TEST 2 Capacity Planning
- Other • 9 pages • 2024
-
- $10.49
- + learn more
Capacity Planning 
Capacity – Max rate of output of a process or system 
Long Term Capacity – relates primarily to strategic issues involving the firms major 
production facilities 
Short Term Capacity – concerns issues of scheduling, labor shifts, and balancing 
resource capacities the goal of short-term capacity planning is to handle unexpected shifts 
in demand in an efficient economic manner. 
Utilization – degree to which a resource such as equipment, workspace, or workforce is 
cur...
-
MGSC 395 Test 1 Management Science 395 – Exam 1 Notes
- Case • 9 pages • 2024
-
- $9.49
- + learn more
Management Science 395 – Exam 1 Notes 
Primary Functions of a Manager: 
- Plan 
- Organize 
- Staff 
- Lead 
- Control 
What does an Operations Manager do? 
“…The systematic design, direction, and control of processes that transform inputs 
into services and products for internal, as well as external customers.” 
Productivity = the value of outputs (services and products) produced divided by the 
value of inputs (labor, materials, equipment, etc.) 
Example: Three employees process 600 in...
-
MGSC 395 EXAM 2 STUDY GUIDE
- Exam (elaborations) • 7 pages • 2024
-
- $9.49
- + learn more
MGSC 395 EXAM 2 STUDY GUIDE 
CHAP 5 
Calculate the capacity for a process 
Capacity 
 Maximum rate of output of a process or system 
Calculate the throughput time for a process route (Page 183) 
Throughput 
 The total elapse time from the start to the finish of the job 
Know and understand the bottleneck 
Bottleneck 
 A capacity constraint resource (CCR) whose available capacity limits the organization’s 
ability to meet the product volume, product mix, or demand fluctuation required ...
-
MGSC 395 Final Exam Study Guide
- Other • 29 pages • 2021
-
- $14.99
- + learn more
ABC Survey, Inc. (ASI) is a marketing research firm that specializes in evaluating consumer reaction to new products, services and advertising campaigns. A client firm has requested assistance from ABC in ascertaining consumer reaction to a recently marketed product for household use. During meetings with the client, it was agreed that door-to-door personal interviews would be used to obtain information from both households with children and households without children. In addition, it was agree...
How much did you already spend on Stuvia? Imagine there are plenty more of you out there paying for study notes, but this time YOU are the seller. Ka-ching! Discover all about earning on Stuvia