A contractor does not have a duty to warn of a situation that could result in a tort? -
✔✔False
A tort is an injury to a person or damage to property? - ✔✔True
The carpenter who stuck his hand through a duct hole was found to be comparatively
negligent? - ✔✔True
A tort liability cannot arise from the breach of an express provision in the contract? -
✔✔False
Statutory liability is created when a contractor follows the statutes affecting the project? -
✔✔False
In the Hertz case, Boh Brothers settled with the driver of the Hertz vehicle? - ✔✔True
Heightened security is needed any time an attractive nuisance is involved? - ✔✔False
A construction site is considered an attractive nuisance? - ✔✔True
In the Hertz case, Boh Brothers was found liable even though it had "under construction" signs
displayed? - ✔✔True
Contract liability does not include a breach of an implied provision? - ✔✔False
,Comparative negligence can totally prevent an injured person from winning a case? -
✔✔False
Liability always falls into just one of the main categories? - ✔✔False
A claimant does not have to offer proof if strict liability applies? - ✔✔True
OSHA has a separate section for just construction? - ✔✔True
Statutory liability is one of the main sources of liability in the construction industry? -
✔✔True
The design-build contract reduces conflicts between the designer and the builder? - ✔✔True
Engineers are usually involved in the design of commercial buildings? - ✔✔True
In a cost-reimbursable contract, the contractor is reimbursed for its costs and also receives a
fee? - ✔✔True
"Fast track" is when the contractor can start building part of the project while other parts are
still being designed? - ✔✔True
In a turnkey contract, the project is turned over to the owner complete so as to allow the
owner to turn the key and start using the facility? - ✔✔True
A cost-plus-a-fixed-fee contract encourages the contractor to finish as early as possible? -
✔✔True
, The owner determines the means, methods, techniques, sequences, and procedures of the
construction (unless the contract provides otherwise)? - ✔✔False
A unit cost contract is a form of a fixed fee contract? - ✔✔True
A design only prime contract would involve the prime contractor? - ✔✔False
A construction manager is never hired by an owner until the design is complete? - ✔✔False
The "E" in A/E stands for an engineer? - ✔✔True
The contractor who contracts directly with the owner is a prime contractor? - ✔✔True
The owner may have a prime contract on a construction project with a bank? - ✔✔True
In a design-bid-build contract, the prime contractor is involved with the design? - ✔✔False
A construction contract may be differentiated by the services provided? - ✔✔True
A cost-plus-a-percentage-fee contract encourages the contractor to hold down on costs? -
✔✔False
Fixed fee contracts are another name for lump sum contracts and are always done for one lump
sum amount.? - ✔✔False
A design-bid-build is the traditional approach of a construction contract? - ✔✔True
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller Examsplug. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $13.24. You're not tied to anything after your purchase.