100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
ABYC Marine Electrical - Set Two Exam Questions and Answers $11.49   Add to cart

Exam (elaborations)

ABYC Marine Electrical - Set Two Exam Questions and Answers

 2 views  0 purchase
  • Course
  • ABYC Marine Electrical -
  • Institution
  • ABYC Marine Electrical -

ABYC Marine Electrical - Set Two Exam Questions and Answers When selecting an inverter, ___ is the primary concern. A. physical size B. output capacity C. connection type D. power-feed type - Answer-B. output capacity /.The efficiency loss through inverters is typically between ___, so a ...

[Show more]

Preview 2 out of 12  pages

  • November 13, 2024
  • 12
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • ABYC Marine Electrical -
  • ABYC Marine Electrical -
avatar-seller
kartelodoc
ABYC Marine Electrical - Set Two Exam Questions and
Answers
When selecting an inverter, ___ is the primary concern.
A. physical size
B. output capacity
C. connection type
D. power-feed type - Answer-B. output capacity

/.The efficiency loss through inverters is typically between ___, so a battery charger
cannot be powered from one and create a perpetual system.
A. 0.5% to 3%
B. 5% to 15%
C. 20% to 25%
D. 35% to 50% - Answer-B. 5% to 15%

/.The ___ defines how much amperage a fuse or breaker can be subjected to without
locking or welding itself into the permanently closed position.
A. maximum working cycle
B. nominal rating
C. maximum allowable charge
D. AIC rating - Answer-D. AIC rating

/.The ABYC requires a(n) ___ in any DC feed from a battery bank with a capacity over
800 CCA.
A. battery switch
B. grounding cable
C. overcurrent protection device
D. inverter - Answer-A. battery switch

/.The main circuit breaker(s) are considered to be the first breaker(s) in a circuit
connected in series with the battery. All subsequent breakers, including sub-main
breakers, connected in series with a main circuit breaker are considered to be "___
circuit breakers."
A. trolling
B. backup
C. branch
D. dedicated - Answer-C. Branch

/.A battery switch shall be installed in the ___ conductor(s) from each battery or battery
bank with a CCA rating greater than 800 amperes or 100 Ah if CCA is unavailable.
A. neutral
B. positive
C. negative
D. grounded

, E. Band - Answer-B. positive

/.___ of the AC output waveform from some inverters may affect the operation of some
GFCI devices.
A. Harmonic distortion
B. Electromagnetic induction
C. Voltage drop
D. Electronic noise - Answer-A. Harmonic distortion

/.Since some inverters do not necessarily output a true sine waveform of AC, a DVOM
that uses a(n) ___ algorithm for interpreting what it "sees" is a must.
A. simple recursive
B. backtracking
C. true root mean square (RMS)
D. approximate - Answer-C. true root mean square (RMS)

/.Gear that functions normally when run from a shore power source but either functions
erratically or not at all when run from an inverter (or generator) is almost always a(n)
___ issue.
A. subsystem
B. wiring
C. overheating
D. waveform - Answer-D. waveform

/.A(n) ___ reads the strength of a magnetic field emission and can be used to establish
a "safe zone of separation" between inverters and magnetically sensitive equipment.
A. gauss meter
B. oscilloscope
C. DVOM multimeter
D. conductance tester - Answer-A. gauss meter

/.When installing an inverter in a split bus application, it is important to provide:
A. An isolated hot bus
B. Large inductive loads
C. An isolated neutral bus
D. Both A and C - Answer-D. Both A and C

/.The best fuse type to use for the DC feed to an inverter is:
A. AGC
B. Class T
C. ANL
D. MDL - Answer-B. Class T

/.On an inverter that does not provide true sine wave output, low-voltage
troubleshooting must be accomplished with a(n) _______- type DVOM.
A. Analog

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller kartelodoc. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $11.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

77254 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$11.49
  • (0)
  Add to cart