1. I do a ____ after replacing a spout to a Healy 900 nozzle - Correct Answer shut off
test
2. In a balance hose the gasoline flows in - Correct Answer Inner hose
3. After the installation of the vapor piping and before back filling, PEI 300 suggests
some methods to document piping layout, except? - Correct Answer Drawing with a
pen, pipe layout on the cover of the tank manual.
4. During VO-1000 you don't - Correct Answer Work without eye protection
5. An Overfill Alarm device needs to be located - Correct Answer Where it can be
heard or seen by the delivery location.
6. When in a GDF you can avoid the installation of UDC? - Correct Answer No
exceptions of any GDF.
7. What is considered an Underground Storage Tank? - Correct Answer Tank and
piping only
8. Gasoline vapors are 3/4 times _____ than air - Correct Answer Heavier
9. Compounds with a high vapor pressure such as gasoline will evaporate readily and
will typically - Correct Answer Have a low Flashpoint.
10. The ____ is the valve that controls pressure and vacuum on the tank. - Correct
Answer P/V Valve
11. The vapor piping must be all, but not - Correct Answer Compatible with
underground environment.
12. The Shear Valve is installed ____ - Correct Answer At the base of the dispenser.
13. What is the max length of a Healy Hose Phase 2? - Correct Answer 20 Feet.
14 A ___ is a component of the hanging hardware that separates when it's applied a
force? - Correct Answer Breakaway.
, 15. UL listed means all except : - Correct Answer Worldwide Approved.
16. After a drive off, a technician should not - Correct Answer Ask attendant to fill out a
drive off accident report.
17. The executive order 201-A says that the reconnection of the breakaway needs to be
- Correct Answer Logged in the maintenance GDF.
18. What is not a secondary containment testing method? - Correct Answer Statistical
Inventory Reconciliation.
19. The air clean separator must be located in the GDF - Correct Answer No more
than 100 ft from the vent riser.
20. The PEI-500 recommends that to avoid being shocked by electricity or soaked with
gasoline that? - Correct Answer You must disconnect power to all electric devices.
21. Which of these refer to a vapor recovery stage 1? - Correct Answer Delivery of
gasoline and UST.
22. Which is not part of the hanging hardware? - Correct Answer Shear Valve
23. What is not a part of a stage 2 vapor recovery? - Correct Answer Monitoring
equipment
24. To install a Healy Z083B Vapor Vac Kit you need the following tools except -
Correct Answer Stretching copper tool
25. After July 1 2004 continuous monitoring on secondary containment is required on? -
Correct Answer Tanks, sumps, UDC where single wall pipe is present.
26. The 1/8 inch of foot slope in vapor piping may not be applied if? - Correct Answer
Should always apply to avoid blocks.
27. What is the minimum nominal internal diameter for a vapor riser stage 2? - Correct
Answer 1"
28. What should you do in case of a large spill and you are waiting for the emergency
response? - Correct Answer Try to clean and contain the spill as much as possible.
29. A secondary containment on vent lines is not required if? - Correct Answer A ball
float will stop delivery at 90% tank capacity.
30. You need to install a secondary containment if
A. You replace underground pipe
B. For new installation after July 2 2004 - Correct Answer Both A and B.
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller Besttutor90. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $22.99. You're not tied to anything after your purchase.