Heat Exchangers 4A Power Engineering - Units 1 – 6 Exam Questions And Answers 100% Pass
3 views 0 purchase
Course
Power Engineering
Institution
Power Engineering
Heat Exchangers 4A Power Engineering -
Units 1 – 6 Exam Questions And Answers
100% Pass
1. Which of the following is not a definition of a power plant?
a) Any one or more boilers in which steam or other vapour is
generated at more than 103 kPa (15 psi).
b) Any one or more boilers containing...
Heat Exchangers 4A Power Engineering -
Units 1 – 6 Exam Questions And Answers
100% Pass
1. Which of the following is not a definition of a power plant?
a) Any one or more boilers in which steam or other vapour is
generated at more than 103 kPa (15 psi).
b) Any one or more boilers containing liquid and having a
working pressure exceeding 1100 kPa (160 psi).
c) Any one or more boilers containing liquid and having a
working temperature exceeding 121 degrees Celsius (250
degrees Fahrenheit).
d) Any one or more boilers in which steam or other vapour
is generated at less than 57 kPa (8 psi).
e) Any engine run from one or more boilers containing liquid
and having a working pressure exceeding 1100 kPa (160 psi). - answer✔D
1. Early government involvement in certification of power
engineers became more important for the following reasons
except:
e) technological advancements - answer✔D
1. Which of the following is not characteristic of increased
automation in power plants?
a) computerized control stations
b) increased mechanization
c) manual flame checking
d) continuous monitoring of processes
e) continuous monitoring of costs - answer✔C
1. "Power plant" means
a) any one or more boilers in which steam or other vapour is
generated at more than 103 kPa (15 psi).
b) any one or more boilers in which steam or other liquid is
generated at more than 103 kPa (15 psi).
c) any one or more boilers containing liquid and having a
working pressure exceeding 1,200 kPa (160 psi), and a
temperature exceeding 121 degrees C (250 degrees F).
d) any one or more boilers containing liquid and having a
working pressure exceeding 1,200 kPa (160 psi), and a
temperature not exceeding 121 degrees C (250 degrees F).
e) any one or more boilers containing liquid and having a
working pressure not exceeding 1,100 kPa (160 psi), and
a temperature exceeding 121 degrees C (250 degrees F). - answer✔A
1. Power engineers are
a) safety code officers in a power plant automatically.
b) qualified to perform any welding jobs in a power plant.
c) skilled workers who operate and maintain the equipment
in a power plant.
d) qualified to perform any electrical jobs in a power
plant.
e) qualified to make design changes in a power plant. - answer✔C
1. In the early days, owners of power plants hired __________
workers, who started out doing manual labour and through
acquired experience they were promoted to jobs with gradually
increasing levels of skill.
a) qualified
b) highly educated
c) trained
d) unskilled
e) college trained - answer✔D
1. In order to produce greater efficiency, higher boiler
pressures were used and this led to __________ due to
employing of unqualified operators in a power plant.
a) economic gains
b) serious accidents
c) higher efficiency
d) safer working conditions
e) less labour disputes - answer✔B
1. Which of the following is not a common work schedule for
power engineers?
a) Year round employment
b) Seasonal lay-offs
c) Eight hour days
d) Twelve hour days
e) Rotating day and night shifts - answer✔B
1. When oil mixes with water in the boiler the resultant effect
is:
a) serious foaming
b) accumulation of very hard scale resulting in tube burnout
c) accumulation of soot
d) decrease in water level
e) shifting and loosening of baffles - answer✔A
The holder of a Certificate of Competency, the
classification of which authorizes him or her to act as a
engineer, may sketch, construct, install, operate, repair,
and give advice on all things pertaining to any __________ in
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller Thebright. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $12.49. You're not tied to anything after your purchase.