100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
CM 1011 Module 1 UPDATED ACTUAL Questions and CORRECT Answers $10.49   Add to cart

Exam (elaborations)

CM 1011 Module 1 UPDATED ACTUAL Questions and CORRECT Answers

 3 views  0 purchase
  • Course
  • CM 1011
  • Institution
  • CM 1011

CM 1011 Module 1 UPDATED ACTUAL Questions and CORRECT Answers what is construction managment? - CORRECT ANSWER- Construction management (CM) entails the planning, scheduling, evaluation, and controlling of construction tasks or activities to accomplish specific objectives by effectively allo...

[Show more]

Preview 2 out of 5  pages

  • October 30, 2024
  • 5
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • CM 1011
  • CM 1011
avatar-seller
MGRADES
CM 1011 Module 1 UPDATED ACTUAL
Questions and CORRECT Answers
what is construction managment? - CORRECT ANSWER✔✔- Construction management
(CM) entails the planning, scheduling, evaluation, and controlling of construction tasks or
activities to accomplish specific objectives by effectively allocating and utilizing appropriate
labor, material, and time resources in a manner that minimizes costs and maximizes
customer/owner satisfaction."


Construction Management - CORRECT ANSWER✔✔- There are six project values to be
controlled, four by the contractor and two by the Owner. The contractor determines methods,
means, techniques, sequences to control cost, time, quality, and safety, and the Owner
determines the scope and function of the project.


construction manager - CORRECT ANSWER✔✔- A construction manager is expected to
deliver a high-quality facility in accordance with the plans and specs, on time, within budget,
and accident free.


cost - CORRECT ANSWER✔✔- Costs are first estimated by the Designer for the Owner to
determine whether to proceed with the project. Then, the contractor estimates the project
costs. If the project is to be competitively bid, the contractor's cost estimate is a major
component in determining the contractor's bid


scope and function - CORRECT ANSWER✔✔- These values are determined by the Owner
and Designer.


owner - CORRECT ANSWER✔✔- Determine the needs of the final user
Determine the scope of work
Determine the budget
Provide payment for costs.


public/private owners - CORRECT ANSWER✔✔- Owners are categorized as either public or
private. The biggest differences between the two are (1) sources of funding, and (2) bidding
procedures.

, architects - CORRECT ANSWER✔✔- Architects who deal with the function, life safety, and
aesthetics of the project as the lead designer on building projects, both residential and
commercial, and


engineers - CORRECT ANSWER✔✔- Engineers who deal with the systems and integrity of
the project as secondary designers on building projects, and as lead designers on heavy civil
and industrial projects


1st level - CORRECT ANSWER✔✔- are entities that directly affect the project under the
prime contractor. Sub-contractors under the prime contractor are secondary players, as are all
sub-sub-contractors and sub-sub-sub-contractors,


2nd level - CORRECT ANSWER✔✔- entities with no actual direct contact with the project,
but necessary for the project to be built, and includes insurance companies, bonding
companies, utility companies, building code officials,


3rd level - CORRECT ANSWER✔✔- These are entities not necessarily needed to build the
project, but who may have influence on a project, and includes local government, bankers,
trade associations, etc.


project delivery - CORRECT ANSWER✔✔- is process by which a building, facility, or
structure is designed and constructed. Different situations warrant different ways to go. These
different ways to do construction are known as delivery methods, and it is the Owner that
selects the method to be used.


design/bid/build - CORRECT ANSWER✔✔- Traditional Method. Design first. Select
contractor by bid or negotiation. Build Project. LINEAR process. Takes time. Separate
contracts for design and construction.


agency cm - CORRECT ANSWER✔✔- Construction Manager is agent of owner. Acts in
owner's best interest at every stage.


at risk cm - CORRECT ANSWER✔✔- CM acts as consultant to owner during design phase,
but does the work of primary contractor during construction phase. Early involvement of
construction entity.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller MGRADES. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $10.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75759 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$10.49
  • (0)
  Add to cart