100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
VA DEQ ESC Inspector Exam Questions And Answers 100% Pass $11.49   Add to cart

Exam (elaborations)

VA DEQ ESC Inspector Exam Questions And Answers 100% Pass

 2 views  0 purchase
  • Course
  • VA DEQ ESC Inspector
  • Institution
  • VA DEQ ESC Inspector

VA DEQ ESC Inspector Exam Questions And Answers 100% Pass VESCP - answerVirginia Erosion and Sediment Control Program - Administered by counties/cities (must), towns (may) - MUST BE APPROVED Minimum Standard 1 - answerStabilization permanent or temporary soil stabilization shall be applied to...

[Show more]

Preview 3 out of 29  pages

  • October 29, 2024
  • 29
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • VA DEQ ESC Inspector
  • VA DEQ ESC Inspector
avatar-seller
Brightstars
©BRIGHTSTARS EXAM SOLUTIONS
10/21/2024 9:24 PM


VA DEQ ESC Inspector Exam Questions
And Answers 100% Pass


VESCP - answer✔Virginia Erosion and Sediment Control Program


- Administered by counties/cities (must), towns (may)
- MUST BE APPROVED

Minimum Standard 1 - answer✔Stabilization


permanent or temporary soil stabilization shall be applied to denuded areas within seven days
after final grade is reached on any portion of the site; temporary soil stabilization shall be applied
within seven days to denuded areas that may not be at final grade but will remain dormant for
longer than 14 days; permanent stabilization shall be applied to areas that are to be left dormant
for more than one year

Site NOT at Final Grade - answer✔- stabilize in 14 days
- temporarily seed
- mulch
- permanently stabilize if dormant > 1 year

Site at Final Grade - answer✔- stabilize in 7 days (recommended immediately)
- permanently or temporarily seed and mulch
- mulch/matting/straw

Minimum Standard 2 - answer✔Stock Piles, Waste and Borrow Areas

, ©BRIGHTSTARS EXAM SOLUTIONS
10/21/2024 9:24 PM

during construction, soil stock piles and borrow areas shall be stabilized or protected with
sediment trapping measures


mulch prevents erosion by protecting the surface from raindrop impact and silt fence intercepts
and detains from disturbed areas

Minimum Standard 3 - answer✔Permanent Vegetation


permanent vegetation cover shall be established on denuded areas not otherwise permanently
stabilized (permanent vegetation shall not be considered established until a ground cover is
achieved that is uniform, mature enough to survive, and will inhibit erosion *there is no %
associated with this*)


reduce erosion and decrease sediment yield from disturbed area


this is the standard used to verify that a site is ready for release of bonds or surety

Minimum Standard 4 - answer✔First-Step Measures


Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to
trap sediment shall be constructed as a first step in any land-disturbing activity and shall be made
functional before upslope land disturbance takes place


a certain amount of initial land disturbance may be required to provide access for equipment to
install the perimeter controls, but site clearing and grading should be kept to a minimum until the
perimeter controls are in place


intercepts and detains small amounts of sediment from disturbed areas during construction
operation to prevent sediment from leaving the site and decrease velocity of sheet flows and low-
to-moderate level channel flow

Perimeter Controls - answer✔assures that sediment does not leave the perimeter of the land-
disturbing area once site clearing, grading, and construction commences

, ©BRIGHTSTARS EXAM SOLUTIONS
10/21/2024 9:24 PM


Examples: silt fences, sediment traps, sediment basins, construction entrance, temporary
diversions, diversions

Minimum Standard 5 - answer✔Earthen Structure Stabilization


stabilization measures shall be applied to earthen structures such as dams, dikes, and diversions
immediately after installation


reduce erosion and sedimentation and reduce damage from sediment and runoff to downstream
or off-site areas

Minimum Standard 6 - answer✔Traps and Basins


sediment traps and basins shall be designed and constructed based upon the total drainage area
(not just disturbed area) to be served by the trap or basin

Sediment Traps - answer✔minimum storage capacity shall be 134 cubic yards per acre of
drainage area and shall only control drainage areas less than 3 acres


*stone outlet = trap*

Sediment Basins - answer✔surface runoff from disturbed areas that is comprised of flow from
drainage areas greater than or equal to 3 acres shall be controlled by a basin; minimum storage
capacity of a sediment basin shall be 134 cubic yards per acre of drainage area; the outfall
system shall, at a minimum, maintain the structural integrity of the basin during a 25-year storm
of 24-hour duration; runoff coefficients used in runoff calculations shall correspond to a bare
earth condition or those conditions expected to exist while the sediment basin is utilized.

Sediment Trapping Devises - answer✔1. place near the lowest drainage points of a project


2. install as a first-step measure [MS-4]


3. stabilize immediately [MS-5]

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Brightstars. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $11.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75323 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$11.49
  • (0)
  Add to cart