100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
STQB Foundation 2024 Đề 2 Questions and Answers $14.49   Add to cart

Exam (elaborations)

STQB Foundation 2024 Đề 2 Questions and Answers

 4 views  0 purchase
  • Course
  • ISTQB
  • Institution
  • ISTQB

STQB Foundation 2024 Đề 2

Preview 2 out of 8  pages

  • October 27, 2024
  • 8
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • ISTQB
  • ISTQB
avatar-seller
julianah420
STQB Foundation 2024 Đề 2

Which statement about testing is true? ...[K1] 124
a) Testing is started after the code is written so that we have a system with which to
work.
b) Testing is started as early as possible in the life cycle.
c) Testing is most economically done at the end of the life cycle.
d) Testing can only be done by an independent test team. - answerb) Testing is started
as early as possible in the life cycle.

The risk of an undetected defect ... [K2]
a) ... does not influence testing in any way.
b) ... has influence on test comprehensiveness and intensity.
c) ... has no influence on the specification of the test cases.
d) ... has no influence on the prioritization of the tests. - answerb) ... has influence on
test comprehensiveness and intensity.

During testing, ... [K2]
a) ... all parts of the system should be tested with the same intensity, because defects
can be everywhere.
b) ... the user interface should primarily be tested, because failures in it are most
annoying for the customer.
c) ... system parts where failures may cause great risks should be tested most
intensively.
d) ... data base access should be tested intensively, in order to prevent wrong data and
inconsistencies an the database - answerc) ... system parts where failures may cause
great risks should be tested most intensively.

Accrording to ISTQB syllabus, A software error can be described as...[K1]
a) A mismatch between the program and its specification
b) A description of the relationship between two or more variables or set members in
which the values of one does not influence the values of others.
c) The process in which developers determinate the root cause of a bug and identify
possible fixes.
d) Any ill-advised, substandard, or temporary fix applied to an urgent problem in the
( often misguided) belief that doing so will keep a project moving forward. - answera) A
mismatch between the program and its specification

Deciding how much testing is enough should take account of followings except?
a) Project constrains
b) Level of Rick
c) Decision Table
d) Safety - answerc) Decision Table

, Which of following is Not "Test Analysis and design" activity in "Fundamental Test
Process"?
a) Identify necessary test data to support the test conditions and test cases
b) Identifying and prioritizing test conditions based on analysis of test items, the
specification, behavior and structure of the software
c) Creating bi-directional traceability between test basic and test case
d) Creating test suites from the test procedures for efficient test execution - answerd)
Creating test suites from the test procedures for efficient test execution

Which is not a goal of writing effective Problem/Bug report?[K2]
a) Explain how to reproduce the problem
b) Analyze the error so you can describe it in a minimum number of steps.
c) Write a report that is complete, easy to understand, and non-antagonistic
d) Illustrate how to fix the problem - answerd) Illustrate how to fix the problem

Which of the following is true of the V-model....
a) ..it only models the test phase
b) ..it specifies the test techniques to be used
c) .it includes the verification of design
d) ..it only states that testing against under requirement - answerc) .it includes the
verification of design

Dynamic and----------approaches, such as exploratory testing were testing is more
reactive to events than pre-planned, and where execution and evaluation are concurrent
tasks..
a) Heuristic
b) Exploratory
c) Regression-averse
d) Analytical - answera) Heuristic

Testing according to the V-model has the following fundamental principles [K2]
a) For every development level, there must be a corresponding test level.
b) For every development level, there must be a corresponding test level. For every test
level, early test design should be implemented.
c) There must a least be the following test levels: Component testing, integration
testing, system testing and acceptance testing.
d) The model is only useful for large critical software projects where there is one
delivery only. - answerb) For every development level, there must be a corresponding
test level. For every test level, early test design should be implemented.

Integration testing has this fundamental purpose: [K2]
a) Testing the new system together with the systems existing before.
b) Testing components together in a hierarchical, incremental way like top-down or
bottom-up.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller julianah420. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $14.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75632 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$14.49
  • (0)
  Add to cart