100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
ISTQB Foundation Difficult Questions and Answers 2024 $13.49   Add to cart

Exam (elaborations)

ISTQB Foundation Difficult Questions and Answers 2024

 4 views  0 purchase
  • Course
  • ISTQB
  • Institution
  • ISTQB

ISTQB Foundation Difficult Questions

Preview 2 out of 11  pages

  • October 27, 2024
  • 11
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • ISTQB
  • ISTQB
avatar-seller
julianah420
ISTQB Foundation Difficult Questions

A. Test case specification. – answer Q. 9: Which of the following defines the expected
results of a test?
A. Test case specification.
B. Test design specification.
C. Test procedure specification.
D. Test results.

C. i, ii and iv. - answerQ2 From a Testing perspective, what are the MAIN purposes of
Configuration
Management?:

i) Identifying the version of software under test.
ii) Controlling the version of test ware items.
iii) Developing new test ware items.
iv) Tracking changes to test ware items.
v) Analyzing the need for new test ware items.

A. ii, iv and v.
B. ii, iii and iv.i,
C. i, ii and iv.
D. i, iii and v.

A. Scheduling test analysis and design tasks. - answerQ3 Which of the following is a
MAJOR task of test planning?

A. Scheduling test analysis and design tasks.
B. Initiating corrective actions.
C. Monitoring progress and test coverage.
D. Measuring and analyzing results.

A. You have discovered every bug in the program. - answerQ 44 Which is the best
definition of complete testing:

A. You have discovered every bug in the program.
B. You have tested every statement, branch, and combination of branches in the
program. C. You have completed every test in the test plan.
D. You have reached the scheduled ship date.

A. Is impractical but possible - answerQ. 123: Exhaustive Testing is

A. Is impractical but possible

, B. Is practically possible
C. Is impractical and impossible
D. Is always possible

A. Requirements Phase. - answerQ. 129: Majority of system errors occur in the phase

A. Requirements Phase.
B. Analysis and Design Phase
C. Development Phase
D. Testing Phase

D. 70% - answerQ. 131: How much percentage of the life cycle costs of a software are
spent on maintenance.
A. 10% B. 30% C. 50% D. 70%

A. Stop when scheduled time for testing expires - answerQ. 134: When to stop Testing?

A. Stop when scheduled time for testing expires
B. Stop if 75% of the pre-defined number of errors is detected.
C. Stop when all the test cases execute with detecting few errors. D. None above

D. Cause as many failures as possible so that faults can be identified and corrected. -
answerWhich of the following statements contains a valuable objective for a test team?
A. Prove that the remaining defects will not cause any additional failures.
B. Run all of the tests that are defined for the test object as quickly as possible.
C. Prove that all faults have been identified through thorough testing.
D. Cause as many failures as possible so that faults can be identified and corrected.

C. User Acceptance Testing - answerQ. 146: During this event the entire system is
tested to verify that all functional information structural and quality requirements have
been met. A predetermined combination of tests is designed that when executed
successfully satisfy management that the system meets specifications

A. Validation Testing
B. Integration Testing
C. User Acceptance Testing
D. System Testing

A. Stop when scheduled time for testing expires - answerQ. 15: When to stop Testing?
A. Stop when scheduled time for testing expires
B. Stop if 75% of the pre-defined number of errors is detected.
C. Stop when all the test cases execute with detecting few errors.
D. None above

A. II, III and IV - answerQ. 160: In any software development life cycle (SDLC) model,
which of the following are characteristics of good testing?

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller julianah420. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $13.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75632 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$13.49
  • (0)
  Add to cart