100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Test One Review : Construction Methods and Materials $9.99   Add to cart

Exam (elaborations)

Test One Review : Construction Methods and Materials

 0 view  0 purchase
  • Course
  • Tst One Re-view : Construction Methods and Materia
  • Institution
  • Tst One Re-view : Construction Methods And Materia

Test One Review : Construction Methods and Materials What are the four main types of construction projects? Explain the main characteristics of each type. 1. Heavy construction and infrastructure: Primarily made up of highways, hemming weighs, dart stations , ect ; essentially transportatio...

[Show more]

Preview 2 out of 11  pages

  • October 26, 2024
  • 11
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Tst One Re-view : Construction Methods and Materia
  • Tst One Re-view : Construction Methods and Materia
avatar-seller
CertifiedGrades
Test One Review : Construction Methods and Materials
What are the four main types of construction projects?

Explain the main characteristics of each type.

1. Heavy construction and infrastructure:

Primarily made up of highways, hemming weighs, dart stations , ect ; essentially transportation
systems

2. Residential:

can include single or multi level family homes; private and low capital

also hotels

3. Commercial:

Public spaces like schools, hospitals, and malls or private company offices/ buildings

4. Industrial:

mostly constructed by high construction firms , may include factories/warehouses and power plants.



What are the main design phases of construction projects?

hint SD-DD-CD

List in order + explain each.

1. Schematic Design Stage ( SD)

- overall design concept

- design documentation primarily for the owner

- emphasis on design

2.Design Development (DD) Stage

- Schematic design developed to bigger detail considering constructability , cost , ect

- Design documentation primarily for design team members

- Emphasis on finalizing design decisions

>> Approval of DD docs by owner to move to CD stage

3. Construction Document (CD) Stage:

- Design finalized to nut and bolt level and construction documents are prepared

- Design documentation primarily for construction team

, - Emphasis on collaboration between design team members

>> approval of CD docs by owner to move to preconstruction phase

Who has the main responsibility for selecting materials and finishes for a project ?

The architect/ designer primarily with input from the owner and contractor.
( The owner will input the appearance and or performance , and the contractor will provide cost,
availability & constructability details )

What are the main constraints under which the designers must choose building systems ?

- Physical Limitations:

include available land , soil bearing capacity, structural span

limitations, building material performance

- Code and legal restrictions

- Budget.

Explain what zoning ordinance is and what subjects they cover, which organization produces it ?

Zoning ordinances control land use , and is imposed by local authorities majorly. It refers to regulations
that pertain mainly to the use of land within the city and includes the zoning text and map of the city


- Subjects covered are:
property use, types of activities, setbacks, land covered, distance to property lines, building height and
size, access & parking, and construction activities.

planning dept

Who does have the primary responsibility for selecting construction means and methods and has
overall responsibility for safety on a construction site?

The Contractor

a. What is the primary purpose of building codes ?

b. what types of subjects are covered by building codes?

a. provides minimal construction standards for the protection of life, health, and welfare of the public

b. subjects include the issues of ..
- fire safety, emergency egress, construction quality, structural integrity , and others including....
energy conservation, accessibility for the handicapped and sustainability.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller CertifiedGrades. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $9.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75323 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$9.99
  • (0)
  Add to cart