100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
QSP/QSD Questions and Answers 2024 $10.99   Add to cart

Exam (elaborations)

QSP/QSD Questions and Answers 2024

 20 views  1 purchase
  • Course
  • QSP/QSD
  • Institution
  • QSP/QSD

QSP/QSD Questions and Answers 2024

Preview 2 out of 9  pages

  • October 23, 2024
  • 9
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • QSP/QSD
  • QSP/QSD
avatar-seller
CLOUND
QSP/QSD Questions and Answers 2024
A Compliance Strom Exemption may be available for what would otherwise be a -
ANSWER-NEL violation or RWMT

A discharger is considered covered by the CGP when____ - ANSWER-Once they have
recieed a WDID number sent by SMARTS

A NOT may be requested under the following conditions except: - ANSWER-All
disturbed lands have been stabilized and material storage areas have secondary
containment

All linear project SWPPPs must be developed to - ANSWER-include Narrative BMPs
which may or may not be drawn on a BMP map

All PDRs must be certified by _____ - ANSWER-The LRP or legally authorized
approved signatory

All projects are subject to monitoring for which parameters - ANSWER-Non-visible
pollutants

All projects are subject to which type of monitoring - ANSWER-Visual monitoring

All risk level discharges shall ensure that sire inspection reports include the following
weather information - ANSWER-Presence or absence of rain
Est beginning of storm event, duration, and time since last event
approx amount of rainfall in inches

Amendments to the SWPPP are the responsibility of the - ANSWER-QSD

Annual reports are due each year by - ANSWER-September 1st

Annual reports must contain all except - ANSWER-Inspection photographs from LUP
projects

Any construction or demolition activity, including, but not limited to, clearing, grading,
grubbing, or excavation, or any other activity that results in a land DISTURBANCE of
equal to or greater than ___ acre - ANSWER-1

Any person who violates any permit condition of the GP is subject to a civil penalty not
to exceed $____ - ANSWER-$37,500 per calendar year of such violation

Are LUP projects subject to the post-construction standards in the CGP? - ANSWER-
Yes

, Are sediment control BMPs a primary or secondary means of preventing storm water
contamination? - ANSWER-Secondary

ATS - ANSWER-Active Treatment Systems

ATS instrumentation shall record which of the following? - ANSWER-Flow, Turbidity,
and pH

ATS monitoring always included all of the following except - ANSWER-SSC

Authorized non-storm water discharges may include those from____ - ANSWER-
Dechlorinated potable water sources such as:
Fire Hydrant Flushing, Irrigation of Veg Erosion Control Measures, Pipe
Flushing/Testing, Dust Control, Uncontaminated ground water from dewatering

Bioassessment exemptions may be allowed for projects in ecoregions with an index
period that is - ANSWER-Outside of construction commencement

Bioassessment monitoring is an assessment of - ANSWER-Measure of the number and
diversity of benthic macroinvertebrates in a water body

Bioassessment protocols used on Level 3 projects must follow those found in -
ANSWER-SWAMP

Cable installation projects of more than 30 acres disturbed in project area or section
designated as type 3 and directly discharging into receiving waters are subject to which
following form of stormwater monitoring? - ANSWER-Bioassessment

CASQA Stands for - ANSWER-California Stormwater Quality Association

Conditions for Termination of Coverage - ANSWER-Within 90 Days when construction
is complete or ownership transferred File through SMARTS
1. File NOT
2. Final Site Map
3. Photos

Construction General Permit order DWQ-2009-0009 regulates storm water discharges
from? - ANSWER-All linear utility projects and construction sites that disturb over 1 acre

Continuous monitoring (no less than 15-minute intervals) of ATS is required for -
ANSWER-Flow and Turbidity

CSMP and M&RP relate respectively to - ANSWER-Traditional and LUP projects

CSMP stands for - ANSWER-Construction Site Monitoring Program

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller CLOUND. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $10.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

77254 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$10.99  1x  sold
  • (0)
  Add to cart