100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
LEED GA Mock Exam 2 Solved 100% Correct $11.99   Add to cart

Exam (elaborations)

LEED GA Mock Exam 2 Solved 100% Correct

 4 views  0 purchase
  • Course
  • LEED GA Mock
  • Institution
  • LEED GA Mock

LEED GA Mock Exam 2 Solved 100% Correct

Preview 3 out of 26  pages

  • October 22, 2024
  • 26
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • LEED GA Mock
  • LEED GA Mock
avatar-seller
CLOUND
LEED GA Mock Exam 2 Solved 100% Correct
A building program that details the project's green building requirements does not
include: (Choose 2)

a. The green building goals

b. The project's vision

c. A general description of the project

d. A room-by-room description of the project

e. Construction cost

f. Scope of work - ANSWER-Answer: e, f

A contractor demolishes the interior partition of an office building, and recycles the
construction debris and waste. S/he also reuses the exterior building shell. S/he can
earn LEED points for which of the following credits? (Choose 2)

a. Regional materials

b. Recycled content

c. Building reuse

d. Construction waste management - ANSWER-Answer: c, d

A density radius calculation is used for:

a. Calculating the number of basic services included for the LEED credit

b. Calculating the number of amenities included for the LEED credit

c. Calculating the number of public transit locations included for the LEED credit

d. Determining the number of properties included in the Surrounding Density and
Diverse Uses calculation - ANSWER-Answer: d

A developer decides to plant trees along the edge of a parking lot, which of the following
is a benefit of this decision?

a. Alleviation of heat island effect

b. Lower maintenance costs

,c. Better IAQ

d. Reduction of stormwater runoff - ANSWER-Answer: a

A LEED Certified building has the following extra costs when compared with a
conventional building?

a. Hard costs

b. Soft costs

c. Storm control costs

d. Life cycle analysis costs

e. Life cycle cost analysis - ANSWER-Answer: e

LIFE CYCLE COST ANALYSIS is unique to a LEED certified building. It is an evaluation
of a building's economic performance including operational and maintenance costs over
the life of the product.

LIFE CYCLE ANALYSIS is the same as eco-balance, cradle-to-cradle analysis, or life
cycle assessment. It is used to evaluate the environmental impact of a service or
product.

A LEED project team is working on an existing building with existing HVAC & R units
that use CFC-based refrigerants. Which of the following is true? (Choose 2)

a. This project cannot earn LEED certification

b. The project team needs to replace all HVAC & R units with new ones

c. The project team can choose to phase out the CFC-based refrigerants before the
project completion

d. The project team can choose to phase out the CFC-based refrigerants after the
project completion as long as the phase out plan is approved by GBCI

e. The project team can choose to phase out the CFC-based refrigerants within 15
years of the project completion as long as the refrigerant leakage rate is 5% or less -
ANSWER-Answer: c, d

A major renovation of an existing retail building can use which LEED rating system?
(Choose 2)

, a. LEED O&M for existing buildings

b. LEED BDC NC

c. LEED BDC CS

d. LEED ND - ANSWER-Answer: b, c

A manufacturer's representative can make the following claims about a wood product:
(Choose 2)

a. The product's is LEED certified

b. The product meets all the requirements of FSC

c. The product meets the requirements of Environmental Product Declarations

d. The product contributes to meeting the requirements of Environmental Product
Declarations under the LEED building rating system - ANSWER-Answer: b, d

A project has earned 81 LEED points under LEED v4. What level of LEED certification
has the project achieved?

a. LEED Platinum Certified

b. LEED Gold Certified

c. LEED Platinum

d. LEED Silver

e. LEED Bronze

f. LEED Certified - ANSWER-Answer: c

A project saves 55% of landscape irrigation water when compared with the baseline.
Under which LEED credit or credit category will the project earn exemplary points?

a. WE category

b. WE credit (WEC): Outdoor Water Use Reduction

c. WEC: Indoor Water Use Reduction

d. Innovation credi - ANSWER-Answer: d

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller CLOUND. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $11.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

77254 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$11.99
  • (0)
  Add to cart