100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
NCCCO Lattice Boom General Knowledge Questions And Answers Latest Top Score. $11.49   Add to cart

Exam (elaborations)

NCCCO Lattice Boom General Knowledge Questions And Answers Latest Top Score.

 3 views  0 purchase
  • Course
  • NCCCO Lattice Boom General Knowledge
  • Institution
  • NCCCO Lattice Boom General Knowledge

NCCCO Lattice Boom General Knowledge Questions And Answers Latest Top Score. The lattice boom is designed to take winds of up to 20 mph. from the side plus a full rated load, plus a direct side load equal to what percent of the rated load? - correct answer. 2% The part of the ...

[Show more]

Preview 2 out of 5  pages

  • October 20, 2024
  • 5
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • NCCCO Lattice Boom General Knowledge
  • NCCCO Lattice Boom General Knowledge
avatar-seller
techgrades
NCCCO Lattice Boom General Knowledge
Questions And Answers Latest Top Score.



The lattice boom is designed to take winds of up to 20 mph. from the side plus a full
rated load, plus a direct side load equal to what percent of the rated load? - correct
answer. 2%

The part of the load chart governed by stability is based on what percentage of capacity
while a crawler crane is working over the side quadrant? - correct answer. A. 75%

The most unstable working quadrant for a crawler crane is the; - correct answer.
Side

What type of capacity is listed on a crane load chart? - correct answer. Static

If the manufacture of a particular crane does not specifically permit pick and carry
operations what procedure must be followed during this operation? - correct answer.
Don't make any pick and carry lifts

What is the main purpose of a jib/extension? - correct answer. To extend reach
higher or up and over

When the number of layers of rope on a drum increase the line pull___________. -
correct answer. Decreases

When handling boom sections, the best place for slings to be attached is; - correct
answer. At the pin connections at the ends of the top chords

Placing timber blocking under the tips of the tracks on a crawler crane will; - correct
answer. Make the crane more stable

What is the major effect of stopping suddenly a rapid swing while operating long boom
crane? - correct answer. Action may cause the crane boom collapse and/or overturn
the crane

According to B30.10 hooks shall be removed from service when the throat opening
exceeds _____ the original throat opening. - correct answer. 5%

, On a crawler crane ground bearing pressure is greatest where? - correct answer.
Over the corner

During disassembly of a long boom, the pendant lines are connected at the maximum
cantilever point and the boom is slightly lifted off the ground, which boom connection
pins are to be removed next? - correct answer. The bottom pins ahead of the
cantilever point

Most crane manufactures require the load chart capacities must be reduced when wind
speed reaches; - correct answer. 20 mph

The definition of cantilever of a lattice boom crane is; - correct answer. The boom
suspended past the pendant connections

What chart do you use when operating a crane on a barge; - correct answer. List
chart

According to OSHA, Jibs must have a positive ________ from backwards overturning -
correct answer. Stop

Mobile cranes on barges shall be - correct answer. Physically attached to the barge

When a crane is properly barricaded, what is the clearance required all the way around
360 degrees between the superstructure and the barricade when swung 360 degrees? -
correct answer. 2 feet

According to ASME B30.5 a fire extinguisher shall have a rating of __________ and
shall be available at all operator's stations or cabs of the equipment. - correct answer.
10 BC or higher

When assembling a lattice boom crane the top pins of the boom sections should be
inserted; - correct answer. First

Block hoisting sheaves should have a minimum pitch diameter of at least________ the
rope diameter. - correct answer. 16 times

What is the correct method of checking the brakes of crane that has been already
assembled? - correct answer. Lift the load a few inches off the ground and apply the
brakes

A long boom crane working at minimum radius and 3 degrees out of level will have a
loss of capacity by; - correct answer. 50%

Can rotation resistant rope be used with a swivel? - correct answer. If approved by
the rope's manufacture

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller techgrades. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $11.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75323 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$11.49
  • (0)
  Add to cart