100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
NICET LEVEL 1 HIGHWAY CONSTRUCTION Questions and Correct Answers the Latest Update and Recommended Version $10.49   Add to cart

Exam (elaborations)

NICET LEVEL 1 HIGHWAY CONSTRUCTION Questions and Correct Answers the Latest Update and Recommended Version

 3 views  0 purchase
  • Course
  • NICET
  • Institution
  • NICET

Acceptance → The written acceptance by the Department of the Work. acceptance testing → Testing conducted by the Department to measure the degree of compliance to the Contract actual cost → The computed cost using calculations provided addendum → A Contract revision or response to ...

[Show more]

Preview 2 out of 12  pages

  • October 20, 2024
  • 12
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • NICET
  • NICET
avatar-seller
TestTrackers
2 0 2 4 /2025 | © copyright | This work may not be copied for profit gain Excel!


NICET LEVEL 1 HIGHWAY
CONSTRUCTION Questions and Correct
Answers the Latest Update and
Recommended Version
Acceptance


→ The written acceptance by the Department of the Work.


acceptance testing

→ Testing conducted by the Department to measure the degree of compliance to the
Contract


actual cost

→ The computed cost using calculations provided


addendum


→ A Contract revision or response to a Contractor inquiry issued after advertisement and
before the opening of bids.


as-built quantity

→ The quantity of a completed Item eligible for payment


authorized funding amount

→ The amount of funds authorized by the Department for the Contract


Bidder




1|Page| GradeA+ | 2 0 0 2 5

, 2 0 2 4 /2025 | © copyright | This work may not be copied for profit gain Excel!

→ The individual, firm, partnership, corporation, joint venture, or any acceptable
combination thereof that submits a bid to the Department.


bridge

→ . A structure, other than a culvert, including supports, erected over a depression or an
obstruction, such as water, highway, or railway, and having a track or passageway for
carrying traffic or other moving loads and having a length 3 measured along the
center of the structure of more than 20 feet between undercopings of abutments or
extreme ends of openings for multiple boxes. Structure dimensions are defined as
follows:


bridge length


→ The overall length measured along the line of survey stationing from back to back of
backwalls of abutments, if present, otherwise end to end of the bridge floor; but, in no
case less than the total clear opening of the structure


bridge width

→ The clear width measured at right angles to the longitudinal centerline of the bridge
between the bottom of curbs, or in the case of multiple height of curbs, between the
bottoms of the lower risers or, if curbs are not used, between inner faces of parapet or
railing


Change Order.

→ A written order issued by the Department to the Contractor after execution of the
Contract authorizing one or more of the following: 1. Changes in the Work. 2.
Modifications in the basis of payment. 3. Modifications to Contract Time.


Commercially Useful Function

→ Occurrences in which the subcontractor is responsible for the execution of a distinct
element of the work of a contract and carrying out its responsibilities by actually
performing, managing, and supervising the work involved, and with respect to
materials and supplies used on the contract, prepares the estimate, negotiates price,
determines quality and quantity, orders the material, arranges delivery, installs (where
applicable), and pays for the material and supplies itself for the project.



1|Page| GradeA+ | 2 0 0 2 5

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller TestTrackers. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $10.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

77254 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$10.49
  • (0)
  Add to cart