100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
WGU C215 Operations Management PVDC Final Exam Question and Answers [100% Correct] 2024/2025 Latest Release $9.70   Add to cart

Exam (elaborations)

WGU C215 Operations Management PVDC Final Exam Question and Answers [100% Correct] 2024/2025 Latest Release

 2 views  0 purchase
  • Course
  • Institution

WGU C215 Operations Management PVDC Final Exam Question and Answers [100% Correct] 2024/2025 Latest Release **What is operations management?** **ANS** The management of processes that transform inputs into goods and services. **Which function focuses on sourcing raw materials and compon...

[Show more]

Preview 3 out of 21  pages

  • October 19, 2024
  • 21
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
avatar-seller
WGU C215 Operations Management
PVDC Final Exam Question and Answers
[100% Correct] 2024/2025 Latest Release

**What is operations management?**

**ANS** The management of processes that transform inputs into goods and services.



**Which function focuses on sourcing raw materials and components for production?**

**ANS** Supply Chain Management.



**What are the three major functions within an organization that operations management interacts
with?**

Finance, Marketing, **ANS** Operations.



**Which strategy focuses on competing based on producing goods or services faster than
competitors?**

Cost leadership, Differentiation, **ANS** Time-based competition.



**What does the acronym PVDC stand for in operations management?**

Project Variable Development Cycle, **ANS** Plan-Do-Check-Act, Process Verification and Development
Cycle.



**Which model is used to represent the flow of materials and products in operations management?**

**ANS** Supply Chain Model.



**What is Six Sigma in the context of operations management?**

**ANS** A set of techniques and tools for process improvement aiming to reduce defects to 3.4 per
million.




1

,**Which key performance indicator (KPI) measures how well resources are utilized in operations?**

Cycle Time, **ANS** Efficiency.



**What is the purpose of a value stream map in operations management?**

**ANS** To identify and eliminate waste in processes to improve the flow of materials and information.



**Which inventory control model calculates the optimal order quantity that minimizes total inventory
costs?**

Safety Stock Model, JIT Model, **ANS** Economic Order Quantity (EOQ).



**What is the critical path in project management?**

The longest route in a production process, The highest-cost project route, **ANS** The longest
sequence of activities that determines the total project duration.



**What does "Kaizen" mean in operations management?**

**ANS** Continuous improvement in processes.



**In Just-In-Time (JIT) production, what is the primary objective?**

**ANS** To minimize inventory levels and reduce waste.



**What is a Gantt chart used for in project management?**

To determine costs, To calculate risk, **ANS** To visually represent project schedules and track progress.



**What are the four types of processes in operations management?**

Batch, Continuous, Job Shop, **ANS** Flow, Intermittent.



**What is capacity planning in operations management?**

**ANS** The process of determining the production capacity needed to meet changing demand.




2

, **What does Total Quality Management (TQM) aim to achieve?**

**ANS** Improving quality at all levels of an organization to meet or exceed customer expectations.



**Which technique helps in identifying the root causes of problems within a process?**

Six Sigma, Kaizen, **ANS** Root Cause Analysis (RCA).



**What are bottlenecks in operations management?**

**ANS** Points in the process where demand exceeds production capacity, slowing down the flow of
work.



**What does the term "lead time" refer to?**

The time taken to assemble products, The time for product maintenance, **ANS** The time between
placing an order and receiving it.



**Which scheduling method is primarily used in low-volume production environments?**

Flow Shop Scheduling, **ANS** Job Shop Scheduling.



**What is takt time?**

**ANS** The rate at which products need to be completed to meet customer demand.



**Which inventory management system ensures materials arrive just as they are needed in the
production process?**

Safety Stock, **ANS** Just-In-Time (JIT).



**What is the purpose of aggregate planning?**

To determine product variety, To minimize product quality, **ANS** To balance supply and demand over
the medium term by adjusting production rates and labor levels.



**Which process involves breaking down a project into smaller tasks and estimating their duration?**



3

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller StellarGrades. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $9.70. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

77254 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling

Recently viewed by you


$9.70
  • (0)
  Add to cart