100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
COSC 153 - Chapter 13 RQ & Terms Correct 100% $9.99   Add to cart

Exam (elaborations)

COSC 153 - Chapter 13 RQ & Terms Correct 100%

 6 views  0 purchase
  • Course
  • COSC 153
  • Institution
  • COSC 153

What are the three fundamental objectives of a quality management plan? - ANSWER Do things the right the first time, prevent things from going wrong in the first place, continually improve the construction process. What is the difference between quality control and quality assurance? - ANSWER Co...

[Show more]

Preview 1 out of 3  pages

  • October 17, 2024
  • 3
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • cosc 153
  • COSC 153
  • COSC 153
avatar-seller
shantelleG
COSC 153 - Chapter 13 RQ & Terms Correct
100%
What are the three fundamental objectives of a quality management plan? - ANSWER Do things the right
the first time, prevent things from going wrong in the first place, continually improve the construction
process.



What is the difference between quality control and quality assurance? - ANSWER Control addresses
quality at the project level and deals with conformance to the plans and specs through submittals, shop
drawings, inspections, testing. Assurance addresses quality at the process level and deals with policies
and procedures associated with hiring, training, safety, subcontracting, procurement.



Name three quality control mechanisms typically mandated by the construction contract that are used to
check for conformance to the plans and specifications. - ANSWER Submittals, mock-ups, shop drawings.



Explain the concept behind a zero-punch list. - ANSWER Complete the final walk-through inspection with
few or no punch items noted on the list. The idea is to inspect and correct the work as it progresses
instead of waiting until it is completed, only to find that the quality is unacceptable.



What is an FOR? - ANSWER A field of observation report and involves a process in which employees,
subcontractors, and visiting vendors are encouraged to report any work item suspected of being installed
incorrectly or failing to meet a quality or safety standard. Each of these observations is logged by the
quality engineer or person in charge of the task, and each item in question is verified or corrected as
needed.



What is the name of the agency responsible for establishing safety standards and enforcing them
through inspections conducted as construction job sites? - ANSWER Occupational Safety and Health
Administration, commonly referred to as OSHA.



What is an MSDS? - ANSWER Material safety data sheet and must be obtained and maintained for every
chemical product that is located on the job site.



Rework - ANSWER Describe defective construction work that must be redone or corrected.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller shantelleG. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $9.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75632 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$9.99
  • (0)
  Add to cart