100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
Previously searched by you
NCIDQ IDPX FINAL EXAM,PRACTICE EXAM NEWEST 2024 ACTUAL EXAM COMPLETE QUESTIONS AND CORRECT ANSWERS WITH EXPLANATIONS (VERIFIED ANSWERS) |ALREADY GRADED A+||BRAND NEW VERSION!!$14.99
Add to cart
NCIDQ IDPX FINAL EXAM,PRACTICE EXAM NEWEST 2024 ACTUAL EXAM COMPLETE QUESTIONS AND CORRECT ANSWERS WITH EXPLANATIONS (VERIFIED ANSWERS) |ALREADY GRADED A+||BRAND NEW VERSION!!
6 views 0 purchase
Course
NCIDQ IDPX
Institution
NCIDQ IDPX
NCIDQ IDPX FINAL EXAM,PRACTICE EXAM NEWEST 2024 ACTUAL EXAM COMPLETE QUESTIONS AND CORRECT ANSWERS WITH EXPLANATIONS (VERIFIED ANSWERS) |ALREADY GRADED A+||BRAND NEW VERSION!!
10/16/24, 8:28 PM NCIDQ IDPX FINAL EXAM,PRACTICE EXAM NEWEST 2024 ACTUAL EXAM COMPLETE QUESTIONS AND CORRECT A…
NCIDQ IDPX FINAL EXAM,PRACTICE EXAM
NEWEST 2024 ACTUAL EXAM COMPLETE
QUESTIONS AND CORRECT ANSWERS WITH
EXPLANATIONS (VERIFIED ANSWERS)
|ALREADY GRADED A+||BRAND NEW
VERSION!!
Terms in this set (50)
Why does the HVAC The correct answer is C. Balancing the HVAC system
system need to be is the process of measuring air flow from diffusers
balanced at the end of a and making adjustments to avoid hot and cold spots
commercial project? within a space. It does not measure air quality,
ductwork leaks or outside air.
A. To verify that air quality
levels are within the P1 Project Coordination
design specifications
B. To detect significant air
leaks in the ductwork.
C. To adjust airflow at
each device location to
meet the criteria in the
engineer's design
D. To determine that each
office is receiving the
amount of outside air
required by the design
,10/16/24, 8:28 PM NCIDQ IDPX FINAL EXAM,PRACTICE EXAM NEWEST 2024 ACTUAL EXAM COMPLETE QUESTIONS AND CORRECT A…
The typical chronological The correct answer is C. Once the interior of a
order of system building is sufficiently protected from the weather,
installation in new the waste lines and water supply lines of the
commercial construction plumbing system are installed and, if specified, the
is: pipes for the sprinkler system. The major part of the
work for the HVAC system is carried out, including
A. HVAC, Plumbing, the installation of boilers, chillers, cooling towers,
Electrical pumps, fans, piping, and ductwork. Electrical,
B. Electrical, Plumbing, communications, and control wiring are routed
HVAC through the building.
C. Plumbing, HVAC,
Electrical P3 Building Systems and Integration
D. Electrical, HVAC,
Plumbing
In which situation would The correct answer is D. Issuing a change order is
an interior designer use a the best way to communicate a change to the
construction change construction documents after the contract has been
directive? awarded.
A. To request an P6 Contract Administration
electrical contractor not
listed by the contractor in
the bid [tender]
documents
B. To request pricing for
an additional receptacle
per the client's request
C. To provide additional
dimensions to the
contractor regarding a
receptacle location
D. To relocate an
electrical receptacle
because of revised
furniture plans
,10/16/24, 8:28 PM NCIDQ IDPX FINAL EXAM,PRACTICE EXAM NEWEST 2024 ACTUAL EXAM COMPLETE QUESTIONS AND CORRECT A…
At project closeout, what The correct answer is B. Flameproofing would fall
documentation MUST into the category of guarantees and warranties as it
contain the certification would affect the performance if the product as well
of flameproofing for as the product's warranty.
finishes?
P4 Product and Material Coordination
A. Maintenance manuals
for furnishings and
finishes
B. Guarantees or
warranties for furnishings
and finishes
C. Record documents for
finish applications and
furniture installations
D. Certificates of
completion for finish
applications and furniture
installations
Why are addenda A. To provide additional information not included in
issued? the bid package
A. To provide additional
information not included
in the bid package
B. To inform potential
bidders about
acceptable alternates
C. To obtain additional
information
D. To request a change
during construction
, 10/16/24, 8:28 PM NCIDQ IDPX FINAL EXAM,PRACTICE EXAM NEWEST 2024 ACTUAL EXAM COMPLETE QUESTIONS AND CORRECT A…
What does an interior The correct answer is C. Ensuring compliance with
designer look for in a job the contract documents is an important part of
site visit during contract interior design project management.
administration?
P6 Contract Administration
A. Conformance to safety
procedures
B. Conformance to
applicable codes
C. Compliance with
contract documents
D. Compliance with the
project schedule
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller MEGAMINDS. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $14.99. You're not tied to anything after your purchase.