100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Hoisting 1B Test MA Questions and Answers 2024 $14.49   Add to cart

Exam (elaborations)

Hoisting 1B Test MA Questions and Answers 2024

 4 views  0 purchase
  • Course
  • Mass hoisting
  • Institution
  • Mass Hoisting

Exam of 31 pages for the course mass hoisting at mass hoisting (Hoisting 1B Test MA)

Preview 4 out of 31  pages

  • October 12, 2024
  • 31
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Mass hoisting
  • Mass hoisting
avatar-seller
julianah420
Hoisting 1B Test MA

Which is not a safe operating practice:
a. using the tipping point of the crane to determine capactiy
b. avoiding sudden movements when operating controls
c. assuring the machine is in proper working order
d. observing and monitoring crane footing - answera

according to ASM B 30.5 safety standards a fire extinguisher must be available at all
operator stations or equipment cabs and must have a minimum rating of:
a 5 ABC
b. 20 ABC
c. 5 C
d. 10 BC - answerd

what is an LMI:
a. latest moment intensifier
b. load moment indicator
c. load magnet identifier
d. lifting magnet indicator - answerb

the effect on a crane when the load starts or stops is called:
a. anti two blocking
b. dynamic loading
c. variable load rate
d. going light - answerb

when operating an emergency stop signal must be obeyed when given by:
a. only the site supervisor
b. only the lift director
c. only the crane operator
d. any individual on site - answerd

the operator is responsible for all the following except
a communication with the signal person
b. verifying the signalpersons abilities
c. proper boom configuration
d. engineering the lift - answerd

when an outrigger or crawler unexpectedly loses support, the crane will experience an
immediate loss of stability. When this occurs the crane operator should:
a. raise the boom and lower the load

,b. boom down and maintain the load
c. lock the boom in place
d. contact the signal person - answera

which of the following will cause kinks in a wire rope?
a. loops turn too tightly
b. a small diameter
c. no fleet angle
d. a tight fleet angle - answera

before swinging the load, what should an operator do?
a. request permission from the lift direction
b. sound the horn
c. yell the word "swing"
d. indicate the direction of swing for the ground workers - answerb

when operating a crane near a 50 kilovolt power source what is the closest distance the
crane may be legally positioned?
a. 2.5 ft
b. 10 ft
c. you can't work near power lines
d. 50 kilovolts = 50 ft - answerb

under what conditions may blocking be placed under the outrigger beams?
a. when the ground is too soft for the outrigger pads
b. when you can't level the crane otherwise
c. when the outriggers jacks are disabled
d. never - answerd

lubricant used on wire rope must be a type that:
a. is sticky
b. can be sprayed on
c. does not hinder visual inspection
d. is manufactured by Lubriplate - answerc

what would most likely occur while lifting a load with a loosely wrapped wire rope on the
Hoist drum
a. shrinking of the wire rope will occur
b. damage will occur to the wire rope
c. the load will not raise
d. the anti two block will enable the drum brak - answerb

gears, pulleys, shaft, and other moving parts that can constitute a hazard shall be
guarded:
a. under any normal operating conditions
b. when the proximity of power lines

,c. when changing the oil
d. even when the crane is out of service - answera

on a pick and carry operation the operator should:
a. keep the boom as short as possible
b. work over the outriggers
c. work over the rear
d. extend the boom section only - answera

what will most likely happen to a crane if a heavy load is blown into the boom by the
wind?
a. nothing
b. the crane could drift
c. the boom could collapse
d. the load drum could release and drop the load - answerc

capacities appearing above the bold line or in a standard area of the load chart
represent the:
a. structural capacity
b. crane overload
c. distance to overload
d. the angle of the dangle - answera

the manufacturer must be contacted for replacement when which of the following
becomes illegible?
a. the manufacturers handwriting
b. load chart
c. bill of sale
d. bill of lading - answerb

what term describes what happens when the block is pulled up into the boom tip?
a. anti two blocking
b. two blocking
c. boom delction
d. load dynamic - answerb

how should hydraulic boom sections be extended?
a. boom functions don't need to be extended
b. extend the white section first
c. equally extend all sections
d. extend the yellow section first - answerc

load chart values apply only if the crane is:
a. level
b. off level
c. 90 deg of level

, d. structurally sound - answera

if you should contact the overhead power lines, the crane operator should not:
a. jump off the crane
b. remain in the operator's cab
c. climb up the crane
d. keep everyone away from the crane - answerc

who must know the details of a lift plan?
a. the field people
b. all personnel involved
c. the crane manufacturer
d. OSHA - answerb

personnel platforms shall not be used to lift:
a. materials
b. boom components
c. rigging
d. tools and materials without employees - answerd

what device may be used to estimate the weight of an object being lfited?
a. a bathroom scale
b. load cell
c. an anemometer
d. a potentiometer - answerb

a 1 in 3 leg Bridle wire rope sling rigged at a 45 deg angle is good for 18 tons the
addition of a fourth leg will increase your capacity by:
a. 0 lbs
b. 18 tons
c. 4.5 tons
d. 9 tons - answera

prior to operating an unfamiliar crane the operator should first read and understand the:
a. hand signals
b. operators manual
c. warning labels
d. site layout - answerb

other than in an emergency, who is authorized to remove a tag or lock placed on a
piece of equipment?
a. OSHA
b. the person who places the lock and tag on the equipment
c. the mechanic
d. the manufacturer - answerb

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller julianah420. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $14.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

77254 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$14.49
  • (0)
  Add to cart