Pile Driving ACTUAL Questions and CORRECT Answers What is a Driven Pile? - CORRECT ANSWER- A Driven Pile is a deep foundation that is constructed by driving a concrete, steel or timber pile to support the anticipated loads in competent subsurface material. Two main types of foundations - C...

[Show more]

Preview 3 out of 19  pages

  • October 11, 2024
  • 19
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Pile Driving
  • Pile Driving
avatar-seller
MGRADES
Pile Driving ACTUAL Questions and
CORRECT Answers
What is a Driven Pile? - CORRECT ANSWER✔✔- A Driven Pile is a deep foundation that
is constructed
by driving a concrete, steel or timber pile to support the anticipated loads in competent
subsurface material.


Two main types of foundations - CORRECT ANSWER✔✔- Shallow foundations
Deep foundations


The Process (3) - CORRECT ANSWER✔✔- (1)Contractor prepares a Pile Installation
Plan (PIP)
(2)Test Pile program is performed
(3)Driving of Production Piles


How the load is transferred?(2) - CORRECT ANSWER✔✔- (1)End Bearing
(2)Friction


Pile Driving System Components


2-3 - CORRECT ANSWER✔✔- • Pile Types
• Hammers & Cushions
• Cranes & Leads
• Templates
• Soil
Special Installation Tools
• Jets
• Drills
• Punches
• Followers

,Pile Types (7)


2-4 - CORRECT ANSWER✔✔- (1)Concrete Piles
(2)Pipe Piles
(3)Steel H-Piles
(4)Timber Piles
(5)Composite Piles
(6)Steel Sheet Piles
(7)Hollow Core Cylinder Piles


Common Florida Pile Types (3)


2-5 - CORRECT ANSWER✔✔- (1)Square Prestressed Concrete
(2)Steel
- H-Pile Sections
- Pipe Sections
(3)Timber


455-7 Prestressed Concrete Piling


2-7 - CORRECT ANSWER✔✔- Provide prestressed concrete piles that are manufactured,
cured, and driven in accordance with the requirements of the Contract Documents. Provide
piles full length without splices when transported by barge or the pile length is less than or
equal to 120 feet.


455-7.3.1 Time of Driving Piles


2-8 - CORRECT ANSWER✔✔- Drive prestressed concrete piles at any time after the
concrete has been cured in accordance with Section 450, and the concrete compressive
strength is equal to or greater than the specified 28 day compressive strength.

, 450-16.3 Shipping


2-8 - CORRECT ANSWER✔✔- Do not ship precast prestressed concrete products to the
project site prior to the completion of the 72 hour curing period and attainment of the
required 28-day strength.


Prestressed Concrete Piling


2-9 - CORRECT ANSWER✔✔- • Square PSC are displacement piles & the most common
• Typically where limestone or dense stratum is <125'
• Used in corrosive environments
• Used as friction piles, end bearing piles, and combination
of both


• Voided piles are made to ____ ____ ____
• Voided piles have solid ends for _______ ________ __________
• Driven as a group can sometimes ____ _____ in
the immediate area


2-11 - CORRECT ANSWER✔✔- reduce pile weight
protection during
driving
densify soils


Cylinder Piles


2-13 - CORRECT ANSWER✔✔- • Least common of the piles.
• 54" or 60" diameter
• Manufactured for specific project needs.
• Used in corrosive environments.
• Used when project is accessible by large barges and cranes.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller MGRADES. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $9.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75323 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$9.99
  • (0)
  Add to cart