  • CIEG 391 Estimating

CIEG 391 Estimating Final UPDATED ACTUAL Questions and CORRECT Answers False - CORRECT ANSWER- Hand tools and some crane time for unloading and hoisting are seldom required with the installation of finish carpentry. True - CORRECT ANSWER- Hardware for rough carpentry, including nails and ot...

[Show more]

Preview 2 out of 6  pages

  • October 10, 2024
  • 6
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • CIEG 391 Estimating
  • CIEG 391 Estimating
avatar-seller
MGRADES
CIEG 391 Estimating Final UPDATED
ACTUAL Questions and CORRECT
Answers
False - CORRECT ANSWER✔✔- Hand tools and some crane time for unloading and
hoisting are seldom required with the installation of finish carpentry.


True - CORRECT ANSWER✔✔- Hardware for rough carpentry, including nails and other
fastening devices, is usually priced as a percentage of the price for lumber.


species - CORRECT ANSWER✔✔- Allowable stresses are specified according to ____ of
lumber and grade within each of the categories.


price per square foot - CORRECT ANSWER✔✔- In the residential industry especially, a
subcontractor will offer to perform carpentry framing work at a ____ of building area.


true - CORRECT ANSWER✔✔- One of the categories by which lumber is graded is
decking.


20 - CORRECT ANSWER✔✔- A ____% allowance for waste is considered appropriate on
finish carpentry materials.


false - CORRECT ANSWER✔✔- Higher outputs can be expected when constructing
columns, pilasters, and curved work rather than long lengths of plain walls.


true - CORRECT ANSWER✔✔- Material prices are determined from suppliers who are
required to quote prices to supply and deliver items that meet specifications.


true - CORRECT ANSWER✔✔- Fabricating and installing roof components such as hips,
valleys, ridges, and rafters require far more time than fabricating and installing plain joists.


7 - CORRECT ANSWER✔✔- The amount of nails required for rough carpentry can be
roughly determined by allowing ____ lbs of nails for every 1000 board feet of lumber.

, 2 - CORRECT ANSWER✔✔- Lumber is generally available in lengths that are multiples of
____ feet.


true - CORRECT ANSWER✔✔- The price of masonry bricks and blocks varies over a wide
range depending on the size, type, and color of units required.


nominal - CORRECT ANSWER✔✔- The size of lumber is stated in accordance with its
__________ size.


outline the terms of the subtrade - CORRECT ANSWER✔✔- Bid depositories are used for
all of the following reasons EXCEPT to ________.


true - CORRECT ANSWER✔✔- When a bid proposal has been obtained from a subtrade, it
should list inclusions that detail all the work that the bidder is offering to do for the price
quoted.


true - CORRECT ANSWER✔✔- Many general expense items are calculated as a function of
the duration of the project.


true - CORRECT ANSWER✔✔- Layout is an allowance for the cost of helpers assisting a
surveyor, an engineer, or the project superintendent with survey work involved in setting out
the lines and levels of the project.


true - CORRECT ANSWER✔✔- The price of general expenses can be a substantial
component of the bid, amounting to 15% and more of the total price in some cases.


false - CORRECT ANSWER✔✔- The cost of the electricity used to meet the general power
and lighting needs of the job is most often an educated guess.


fringe benefits - CORRECT ANSWER✔✔- Which of the following includes a number of
items that could be contained in a contract of employment or a union collective agreement?

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller MGRADES. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $7.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

77254 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$7.99
  • (0)
  Add to cart