100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
ICC CALIFORNIA UST SERVICE TECHNICIAN CERTIFICATION ACTUAL EXAM 200 QUESTIONS AND CORRECT DETAILED ANSWERS (100%VERIFIED ANSWERS) |AGRADE $14.99   Add to cart

Exam (elaborations)

ICC CALIFORNIA UST SERVICE TECHNICIAN CERTIFICATION ACTUAL EXAM 200 QUESTIONS AND CORRECT DETAILED ANSWERS (100%VERIFIED ANSWERS) |AGRADE

 4 views  0 purchase
  • Course
  • ICC CALIFORNIA UST SERVICE TECHNICIAN
  • Institution
  • ICC CALIFORNIA UST SERVICE TECHNICIAN

ICC CALIFORNIA UST SERVICE TECHNICIAN CERTIFICATION ACTUAL EXAM 200 QUESTIONS AND CORRECT DETAILED ANSWERS (100%VERIFIED ANSWERS) |AGRADE

Preview 3 out of 21  pages

  • September 18, 2024
  • 21
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • ICC CALIFORNIA UST SERVICE TECHNICIAN
  • ICC CALIFORNIA UST SERVICE TECHNICIAN
avatar-seller
TheAlphanurse
ICC California UST Service Technician
Study online at https://quizlet.com/_b9nkfx

UDC was required at time of installation
January 1, 2000
for all systems installed after?
July 1, 2005, service techs shall possess
or work under someone who has a cur-
ICC UST Service Technician Exam
rent certification indicating he or she has
passed the?
ICC cert must be renewed every? 24 months
Service techs must possess or be em-
ployed by a person who has the appro- The individual has a tank testing license
priate contractor's license unless?
Tests UST monitoring equipment, trouble
Service tech is defined by any individual
shoots UST systems, and/or installs UST
who?
monitoring equipment.
If the manufacturer training no longer ex-
Approve comparable alternate training .
ist, the local agency may?
UST includes? Tank and connected piping
What is considered a UST? A petroleum storage tank.
What UST system meets the require-
Doubled wall tanks
ments for secondary containment?
According to title 23; the following piping
components if installed after July 1, 1987 Pressured product piping
must have secondary containment.
Considered "pipe" on tanks installed af- Pressured product piping and below
ter July 1, 2003. ground vapor recovery.
Under dispenser containment (UDC)
was required for all existing UST sys- December 31, 2003
tems by
System for exchanging gas vapors in a
storage tank and product in a fuel deliv- Stage 1 vapor recovery
ery truck
An approved method for non-visual mon-
Statistical Inventory Reconciliation (SIR)
itoring for existing UST systems.

0.2 gallons per hour


, ICC California UST Service Technician
Study online at https://quizlet.com/_b9nkfx
ATG must be capable for detecting a re-
lease of?
What is no longer an approved method
for non-visual monitoring on existing Manual inventory reconciliation.
UST systems?
Automatic line leak detectors installed on
underground piping with secondary con-
3 gallons per hour at 10 psi
tainment shall be capable of detecting a
leak of ?
How often should ATG be programmed
At least monthly
to test the tank?
According to PEI RP 300, a combustible Detect vapor leaks in a vapor recovery
gas can be used to? system.
According to PEI RP 300, a written
scope of work for vapor recovery instal- Construction plans
lation should include?
Positive shut off overfill protection device
must stop the flow of fuel when the tank 95% full
is no more then?
According to Executive Order (EO) VR
201-A , what could cause a nozzle shut Depended filter seal damage
off mechanism or malfunction?
According to VR 201-A, breakaway re-
Logged in GDF log
connection must be?
According to PEI RP 300 what is an IN-
Sketching a diagram on the inside cover
CORRECT method of documenting pip-
of vapor recovery equipment manual
ing location?
According to PEI RP 300 as built
drawing or pictures of the underground
maintained as long as UST is in service.
pipping and other components shall
be_________.
According to EO VR 101-E maintenance
Name and Designated UST Operator.
records are required to include what?




, ICC California UST Service Technician
Study online at https://quizlet.com/_b9nkfx
The Phil-Tite EVR Phase 1 system re-
quire that vapor vent pipes at any UST Used with no more than 3 p/v valves
system be
According to EO VR 2010 after installing
a new spout assembly in the Healy 900
Nozzle dispensing shut off test
nozzle the following test must be con-
ducted?
According to Healy EO VR 201-A a vapor Gasoline dispensing facility opera-
recovery record is to be maintained by? tor(GDF)
An enhanced leak detection test is re-
quired within how many feet of a public 1000 feet
drinking well?
What are the components of the Fire
Fuel, Heat/Ignition Source, Oxygen
Triangle?
If equipped with an over fill alarm, it must So it can be seen or heard from the de-
be located? livery location.
If installed, the following requires inde-
Automatic Tank Gauge, Liquid Product
pendent 3rd party certification to prove
Detectors, SIR
compliance with established regulations.
Where are ATG's installed? Opening in top of the tank
They're capable of alarming operator of
What is true about ATG's
low product level
Releases greater than 25 gallons that es-
cape secondary containment. Release
The following types of releases must be
that escape primary containment. Re-
reported to the local agency.
leases less than 25 gallons which es-
cape secondary containment
If an unauthorized product release
meets the requirements for reporting to
the local agency, verbal notification must 24 HRS, 5 DAYS
be made within ____hours, followed by a
written notification within ____days.
The following unusual conditions shall be
Water in spill buckets
reported to the local agency, EXCEPT:

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller TheAlphanurse. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $14.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79079 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$14.99
  • (0)
  Add to cart