100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
Previously searched by you
MNO2604 ASSESSMENT 5 SEMESTER 2 2024 BMZ There is not much opportunity for a work study o�cer to select and study a task in a factory or o�ce at will, and there is nearly always a reason why a certain task, process or procedure should receive attention.$2.82
Add to cart
MNO2604 ASSESSMENT 5 SEMESTER 2 2024 BMZ There is not much opportunity for a work study o�cer to select and study a task in a factory or o�ce at will, and there is nearly always a reason why a certain task, process or procedure should receive attention.
MNO2604 ASSESSMENT 5 SEMESTER 2 2024 BMZ
There is not much opportunity for a work study o�cer to select and study a task in a factory or o�ce at will, and there is nearly
always a reason why a certain task, process or procedure should receive attention. Based on this information, state whi...
RSK4802 Assignment 2 2024 - DUE 28 October 2024 COMPLETE SOLUTIONS
RSK4803 Assignment 3 2024 - DUE 7 October 2024 - ALL QUESTIONSWITH COMPLETE ANSWERS
All for this textbook (33)
Written for
University of South Africa (Unisa)
Work Study - MNO2604 (MNO2604)
All documents for this subject (4)
1
review
By: nkhanyisile54 • 2 months ago
By: BMZAcademy • 2 months ago
Thank younkhanyisile54 for the review, tell us if you need anything more about the assignment or the module or any other modules please get in touch through the provided details
Started on Thursday, 5 September 2024, 3:42 PM
State Finished
Completed on Thursday, 5 September 2024, 3:48 PM
Time taken 5 mins 30 secs
Marks 15.00/15.00
Grade 100.00 out of 100.00
Question 1
Correct
Mark 1.00 out of 1.00
There is not much opportunity for a work study o�cer to select and study a task in a factory or o�ce at will, and there is nearly
always a reason why a certain task, process or procedure should receive attention. Based on this information, state which of
the following are these reasons?
a. The task is a new one and has not been carried out before.
b. The method has changed and a new standard time must be determined.
c. There seems to be a bottleneck within a certain process because the next process is idle.
d. There is a change in management policy, for example, in the implementation of an incentive policy.
1a
2 ab
3 abc
4 abcd
1. A
2. AB
3. ABC
4. ABCD
Your answer is correct.
4 - ABCD
The correct answer is:
ABCD
The following two statements are part of the work measurement procedure.
“The actual duration of each element. Evaluate the pace at which the worker carries out the activity (rating) and record it on the
time study sheet”.
Read the statements above and state in which of the following steps does it feature?
1 Select
2 Measure
3 Record
4 Calculate
1. SELECT
2. MEASURE
3. RECORD
4. CALCULATE
Your answer is correct.
Answer: 2 - Measure
The correct answer is:
MEASURE
2 of 18 9/5/2024, 3:48
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller BMZAcademy. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $2.82. You're not tied to anything after your purchase.