100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
NABCEP Associate Exam QUESTIONS AND ANSWERS GRADED A+ 2024/2025 $11.49   Add to cart

Exam (elaborations)

NABCEP Associate Exam QUESTIONS AND ANSWERS GRADED A+ 2024/2025

 7 views  0 purchase
  • Course
  • NABCEP PV ASSOCIATE
  • Institution
  • NABCEP PV ASSOCIATE

NABCEP Associate Exam QUESTIONS AND ANSWERS GRADED A+ 2024/2025

Preview 2 out of 7  pages

  • September 6, 2024
  • 7
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • nabcep pv associate
  • NABCEP PV ASSOCIATE
  • NABCEP PV ASSOCIATE
avatar-seller
Qualityexam
NABCEP Associate Exam

UL 1741 - ANSStandards for inverters, converters, controller and interconnections

UL 1703 - ANSStandard for safety, flite plate, Pv modules and panels

What PV panels are crafted from cylindrical silicon ingot - ANSmonocrystalline

Residential Pv systems are restricted to no extra than 24 -volt cells linked in collection -
ANS48V in total in keeping with NEC 690.71

Roof installed structures are established on aluminum or chrome steel rail secured secured
into the roof trusses the usage of - ANSLag Bolts

Diagnosing a PV hassle - ANSStay safe, look at device first, turn things off with disconnects,
then take measurements

PV monitoring systems - ANSconsists of a device that measures modern-day and voltage on
ac output of the inveter

PV supply circuits meets PV output circuits - ANSin the combiner box

The factor at the IV curve where the MPPT is most - ANSis on the third point

Current is measured with - ANSmultimeter with a clamp

ARC flashes inverters are prepared with - ANSarc fault detection

NEC - ANScontains which twine to use

OSHA - ANSFederal employer that establishes and enforces requirements of safety for the
place of job

a restaurant makes use of 2200WH , forty eight V dc, four.9 PSH, and a Battery efficiency of
ninety%, what is the Ah capability needed? - ANS2200WH/48V = 45.Eighty three AH forty
five.83AH/.Ninety = 50.92 50.92/4.Nine = 10.39

A restaurant uses 2WH and has 10 kWh in garage what can they operation? - ANSThey can
function all operations for days. 10 kWh is lots of potential as compared on your utilization of
two wh. First convert 10 kWh to 10,000 Wh which is a lot compared to two wh. Refer to
segment 7.Four.Zero of your NCCER ebook for extra element.

When you lock out a system you want to apply - ANSengraving

What became a non producing financial incentive for installing pv - ANSrebates

, PV system warranties are for - ANS25 years

what amps would reason an installer if stunned now not be able to allow cross - ANSover
10MA

Inverter warranties - ANSare 10 years

Amps are represented by using - ANSA

What desires to be finished to PV modules to prevent them from energizing and inflicting
surprise - ANSthey want be blanketed and the leads plugged together

Inverters use a digtigal show to signify - ANSambient temperature and voltage output

Ground fault safety - ANSis located inside the inverter

STC - ANSair mass of much less than 1.5 spectral distribution

What point on curve has the maximum MPPT on IV curve - ANSthe thrid point in the graph

Digital meter with clamp - ANSAmmeter

What is the gain of setting modules on the floor in preference to the roof - ANSthey are
cooler

What is the protection required to do at the roof via the life of the gadget - ANSreplace
brackets

you need what type of gear to save you shock - ANSinsulated gear

Items used for combining the output of grid tied battery inverter - ANSdc disconnected
between array and inverter

Diversion rate controller - ANSdiverts strength from completely charged batters to load

which data is included in the scope of NEC - ANSnational electric code

In a grid connected system PV array ground fault protection is typically blanketed as a part
of the - ANSinteractive inverters

which calcualtion is used to decide the overcurrent safety device installed in a PV supply
circuit - ANSISCx1.25

DC disconnet is required - ANSbetween the array and the inverter

AC disconnect is needed - ANSbetween the inverter and the constructing service panel

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Qualityexam. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $11.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

77254 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$11.49
  • (0)
  Add to cart