100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
Previously searched by you
GEORGIA PEST CONTROL YEAR 2024/2025 / ACCURATE CURRENTLY TESTING EXAM VERSIONS WITH ACTUAL QUESTIONS AND DETAILED ANSWERS WITH A STUDY GUIDE / EXPORT VERIFIED FOR GURANTEED PASS / LATEST UPDATE.$24.49
Add to cart
GEORGIA PEST CONTROL YEAR 2024/2025 / ACCURATE CURRENTLY TESTING EXAM VERSIONS WITH ACTUAL QUESTIONS AND DETAILED ANSWERS WITH A STUDY GUIDE / EXPORT VERIFIED FOR GURANTEED PASS / LATEST UPDATE.
9 views 0 purchase
Course
GEORGIA PEST CONTROL
Institution
GEORGIA PEST CONTROL
GEORGIA PEST CONTROL YEAR 2024/2025 / ACCURATE
CURRENTLY TESTING EXAM VERSIONS WITH ACTUAL
QUESTIONS AND DETAILED ANSWERS WITH A STUDY
GUIDE / EXPORT VERIFIED FOR GURANTEED PASS /
LATEST UPDATE.
GEORGIA PEST CONTROL YEAR 2024/2025 / ACCURATE
CURRENTLY TESTING EXAM VERSIONS WITH ACTUAL
QUESTIONS AND DETAILED ANSWERS WITH A STUDY
GUIDE / EXPORT VERIFIED FOR GURANTEED PASS /
LATEST UPDATE.
Requirements for Georgia SPCA - CORRECT ANSWER Company License
-All pest management companies must be licensed before they begin operation
Certified Operator
-Every pest management company (branch) must employee at least one person who has taken
and passed the certification exam.
Registered Employees
-all non-certified technicians must be registered, in order to work without the presence of a
certified or registered employee.
Re-certification/re-registration
-All certified and registered employees must be re-certified and re-registered periodically.
Re-certification
-5 years
-HPC- 25 hours
-WDO- 25 hours
-FUM- 12 hours
Re-registration
-2 years
-HPC- 8 hours
-WDO- 8 hours
-FUM- 3 hours
,Designated Certified Operators (DCO) Categories - CORRECT ANSWER WDO- Wood
Destroying Organisms
HPC- Household Pest Control
FUM- Fumigation
Contracts for Control of WDO - CORRECT ANSWER A contract must be issued for every
WDO service before the work begins.
Copied must be kept for 2 years following the expiration of the contract.
Comprehensive Post Construction Soil Termiticide Application for Subterranean Termites -
CORRECT ANSWER Removal of all cellulosic material from under the building
Removal of all wood to earth contacts except pressure treated wood designed for ground contact
Removal of all visible and accessible termite tunnels
Application of of an approved termiticide to all exterior and interior soils
Defined Post Construction Soil Termiticide Application for Subterranean Termites - CORRECT
ANSWER Removal of all cellulosic material from under the building
Removal of all wood to earth contacts except pressure treated wood designed for ground contact
Removal of all accessible termite tunnels
Application of of an approved termiticide
Post Construction Soil Termiticide Application for Subterranean Termites, Other than Baits -
CORRECT ANSWER Removal of all cellulosic material from under the building
Removal of all wood to earth contacts except pressure treated wood designed for ground contact
Removal of all visible and accessible termite tunnels
Application of of an approved termiticide
Post Construction Termiticide Bait Application for Subterranean Termites - CORRECT
ANSWER Removal of all cellulosic material from under the building
,Removal of all wood to earth contacts except pressure treated wood designed for ground contact
Removal of all visible and accessible termite tunnels
Install/service an approved baiting system
Pre-Construction Termiticide Bait Application for Subterranean Termites - CORRECT
ANSWER Systems must be monitored for one year at no additional cost when installed for pre-
construction or to control infestations found during the coverage period of an official Georgia
Wood Infestation Inspection Report.
Alternate Application Techniques (AAT) - CORRECT ANSWER AATs must be approved by
the commission prior to use
Removal of all cellulosic material from under the building
Removal of all wood to earth contacts except pressure treated wood designed for ground contact
Removal of all visible and accessible termite tunnels
Application of an approved soil termiticide, where application includes all areas specified in
defined, comprehensive, or pre-construction treatments
Treatment of Powder Post Beetles and Wood Borers - CORRECT ANSWER Application of an
approved pesticide
Ventilation of the under-floor space between the bottom of the floor joists and the earth to meet
the requirements of the International Residential Building Code for one and two family
dwellings
Treatment of Wood Decay Fungi - CORRECT ANSWER Ventilation of the under-floor space
between the bottom of the floor joists and the earth to meet the requirements of the International
Residential Building Code for one and two family dwellings
Installation of a vapor barrier to cover a minimum of 70% of the exposed soil surface in a crawl
space
Treatment of Dry Wood Termites - CORRECT ANSWER Application of an approved pesticide
, Treatment of Schools - CORRECT ANSWER Treatment of Schools involves taking special
precautions to minimize the potential exposure of students to pesticides.
-Application of pesticides in rooms vacant for 3+ hours
-Applications of bait formulations, rodenticide baits in tamper-resistant containers, insecticides
when students not in the room.
-Outdoor: allowed if students are not expected to be present within 20 feet of the application site.
Must be clearly marked by fence or similar barrier.
-All dilutions must be mixed outside of student occupied areas.
-Liquid termiticides must be performed when students are not present (20+ feet away) and are
not expected to be present for 3+ hours
Fair Business Practices Act - CORRECT ANSWER All contracts signed contain a notice that the
contract can be canceled for up to 3 business days after signing. Requires all work be performed
in a quality manner.
Hazardous Waste Management Act - CORRECT ANSWER 1979- Follow the Federal Resource
Conservation and Recover Act (RCRA). This law protects human health and the environment
from improper activities involving hazardous waste.
Pesticide Use and Application Act - CORRECT ANSWER The GDA enforces the Georgia
Pesticide Use and Application Act.
This law deals with the regulation and licensing of certain areas related to structural pest control.
Mosquito and Lawn
Three Life Support Requirements a Pest Needs to Survive - CORRECT ANSWER Food
Water
Harborage (a place to hide)
Three Major Groups of Pests - CORRECT ANSWER Insects and other arthropods (mites, ticks,
spiders)
Vertebrates (birds, squirrels, rats, and mice)
Wood decay fungi
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller DrMedinaReed. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $24.49. You're not tied to anything after your purchase.