Asphalt Paving Level 1 QUESTIONS AND ANSWERS A full lot is composed of 5 sublots and 4 cores per lot T/F - ANSWER False What is the most important for consistent compaction of asphalt mix? The mix is hotter in temperature The mix is colder in temperature The mix is uniform in t...

[Show more]

Preview 2 out of 8  pages

  • August 31, 2024
  • 8
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Asphalt Paving Level 1
  • Asphalt Paving Level 1
avatar-seller
TheExamMaestro
Asphalt Paving Level 1 QUESTIONS AND ANSWERS

A full lot is composed of 5 sublots and 4 cores per lot T/F - ANSWER False

What is the most important for consistent compaction of asphalt mix?
The mix is hotter in temperature
The mix is colder in temperature
The mix is uniform in temperature
Temperature of the mix does not affect compaction - ANSWER The mix is uniform in
temperature

Referring to general stationing guidelines, R1 would be ____ than R2
Closer to centerline
Closer to outside shoulder
Closure to the inside shoulder
Both A and C - ANSWER Both A and C

While using the rolling straightedge, if the needle goes in the red zone indicating an
unacceptable high spot in the section, you then - ANSWER Mark the pavement where
the needle first goes into the red zone and place another mark where the needle leaves
the red zone and continue

For bridge approach slabs, the 15 foot manual straightedge should be set so ____ is on
the bridge deck.
1 inch
Exactly 1/2 of the straightedge
The entire straightedge
None of the above - ANSWER 1 inch

For the first transverse joint on a project place the ___ on the new pavement while
overlapping the transverse joint by one inch.
4 foot level
15 foot manual straight edge
Rolling straightedge
All the above - ANSWER 15 foot manual straight edge

When calibrating to check the low side of the rolling straight edge:
Place shims under the outer wheels
Place the rolling straight edge on a surface that looks flat
Place a 3/16 inch shin under each outside wheel, the gauge should read zero on both
sides of the gauge
Place shims under the center wheel - ANSWER Place a 3/16 inch shin under each
outside wheel, the gauge should read zero on both sides of the gauge

When calibrating to check the high side of the rolling straight edge:

, Place shims under the outer wheels
Place shims under the center wheel
Place the rolling straight edge on a surface that looks flat
Place a 3/16 inch shin under the center wheel. The gauge should read zero on both
sides of the gauge. - ANSWER Place a 3/16 inch shim under the center wheel. The
gauge should read zero on both sides of the gauge.

What do you need to know when manually checking the cross slope?
The level length
The lane width
Height from the end of the level to pavement surface
The diameter of the bubble in the level - ANSWER Level length and height from the end
of level to pavement surface

When paving 5 foot wide shoulders or open-graded friction course FC-5 cores should
be taken at the frequency of...
1 per 100 feet
5 per lot
5 per sub lot
1 per 1000 feet
None of the above - ANSWER None of the above

Density cores for acceptance testing are not required for:
Mix less than 1 inch thick
Shoulders less than 5 feet wide
Acceleration and deceleration lanes less than 1000 feet in length
Ramos less than 1000 feet - ANSWER All of the above

If a core sample is needed just after paving then
Coring can be done immediately
Let the pavement be cool to the touch before coring
Run extra water from the core rig while coring
Wait until the pavement surface temperature has cooled below 160 degrees before
coring - ANSWER Wait until the pavement surface temp has cooled below 160 degrees
before coring

Align the core barrel over the marked sampling location so that
It is a slight angle to the pavement
It is perpendicular to the truck bumper
It is perpendicular to the pavement surface
The top of the barrel is tilted slightly towards the truck - ANSWER It is perpendicular to
the pavement surface

How should asphalt cores be stored when transporting in hot weather?
Stacked on top of each other in a box for each project being sampled
By standing them upright in a cool shady location

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller TheExamMaestro. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $13.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75323 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$13.99
  • (0)
  Add to cart