A dimmer rack with a constant load capability is powering twenty four incandescent lights during a stage production. The dimmer rack is running on a steady 230VAC supply and averaging approximately 98 amps draw. Suddenly the line voltage drops to 211VAC. Calculate the expected amperage draw. - 9...

[Show more]

Preview 3 out of 26  pages

  • August 25, 2024
  • 26
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • CTS
  • CTS
avatar-seller
ACADEMICMATERIALS
CTS Exam Prep
A dimmer rack with a constant load capability is powering twenty four incandescent lights during a stage
production. The dimmer rack is running on a steady 230VAC supply and averaging approximately 98
amps draw. Suddenly the line voltage drops to 211VAC. Calculate the expected amperage draw. -
90 amps



What is one of the disadvantages of contracting the AV integrator to the electrical

subcontractor? - More layers of responsibility and communication



What is an important aspect of funding that has a direct impact on the project process and
design/installation? - Technical Support Funding



What are the four teams that comprise the overall Project Team? - Owner, Design, Installation,
and Management



Who would belong to the Design team? - Anyone with Consultant in their title except the moving
consultant



Which groups make up the Management Team? - Developer, Construction Manager, and Building
Management Agency



The End-User, Facility Manager and Building Committee comprise which team within the Project Team? -
Owner



Which group represent the generic roles that are important to the Project process? - Project
Managers, Designers and Installers



Which project characteristics must be considered in order to determine which method is best suited for
a particular project? - Schedule, Size, Type, Complexity, and Procurement Requirements

,Whether a construction project is large or small, which milestones must be achieved in a typical
schedule? - Programming, Building Design, AV Bid, and Move-In



What type of project is a typical Consultant-Led Design-Bid-Build contract structure good for? -
Long term projects with extended project cycles



What is the risk in using an OFE/Integrator Installed contract structure? - System and
infrastructure design and facility functionality may suffer



What are some of the important project scope and size considerations in selecting an AV provider? -
Financial Stability, Current Workload, and Company Credentials



What type of document typically includes Project Size Requirements, Corporate Profile, Team Personnel,
and Warranty Response Time? - RFQ



a significant difference between the Two-Envelope Bid

Method and the Qualifications- Based Selection Method? - Negotiate with the highest ranking
firm to finalize the contract



When conducting a complete project bid process, what milestone follows the issuing of the RFP? -
Pre-Bid Meeting



Under what circumstances would you likely use an A305-1986 form? - Scoring responses to an
RFQ



What is the ideal way to contract an AV integrator? - Directly to the Owner



The process of identifying the activities that end-users need to perform, and developing the functional
descriptions of your systems is referred to as:? - Needs Analysis



What is the main task of the third Step of the Program Phase of a Project? - Conducting program
meetings

, What should be included in the written Program Report? - ...A conceptual and functional system
description



The more accurate means to estimate dimensions of a commercial space during a site inspection would
be to? - Count Ceiling Tiles in a drop tile instalation



A client requires a new boardroom. The sales person and engineer are sent to the premises to measure
the facility and talk to the client. At this stage they should be performing a _ - Needs Analysis



Sightlines for audience viewing in a given presentation space can be improved by: - Providing a
sloped, or stepped, seating arrangement



After presenting a proposal, what is the correct plan of action for following up with the client? -
Regularly, until a decision is made



AV professionals determine the end user's needs by examining three things: the required applications,
the tasks, and the: - Functions to support the applications



When working with a client to design an AV solution for a new conference center, the client requests a
detailed budget for the equipment and installation. What phase is the project in? - Design phase



The HDTV aspect ratio is equal to which of the following? - 1.78:1



Please select the appropriate resolution for SXGA. - 1280 x 1024



The Brightness control adjusts which level? - Black Level



For what purpose would the AV technician designate a loopback internet protocol address in the
127.0.0.1 to 127.255.255.254 range in a network configuration? - To test the local device to see if
TCP/IP is working on your system

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller ACADEMICMATERIALS. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $7.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75323 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$7.99
  • (0)
  Add to cart