100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
COSC 353 - Final Exam Questions and Answers $12.49   Add to cart

Exam (elaborations)

COSC 353 - Final Exam Questions and Answers

 6 views  0 purchase
  • Course
  • Cosc
  • Institution
  • Cosc

COSC 353 - Final Exam Questions and Answers

Preview 3 out of 19  pages

  • August 24, 2024
  • 19
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Cosc
  • Cosc
avatar-seller
millyphilip
COSC 353 - Final Exam Questions and
Answers
Public Owner - Answer -money comes from federal, state, or local

owner is the taxpayer

projects can be managed by private organizations

Private Owner - Answer -most construction financed this way

developer

Developer - Answer -private owner that only owns the project for the duration of
construction

Owner Representatives - Answer -facility managers

building committee (users, financial backers, residents)

pm/cm

Architects - Answer -translate and develop an owner's requirements and graphically
represent them so that a contractor can accurately price, schedule, and implement the
design

owner's representative thru construction phase

licensed individuals

Drafters/CAD/BIM Operators - Answer -produce construction documents in support of
architect's work

increasingly independent of architects

Specification Writers - Answer -prepares the specifications, which lays out the level of
performance requirements and quality expected

Interior Designers - Answer -work on nonstructural interior spaces, interior finishes

,Landscape Architects - Answer -location of trees and shrubs

set grades, establish walkways, walls, and fences

site design

Engineers - Answer -mechanical, electrical, structural, civil

licensed individual

hired by owner, not the architect

Structural Engineer - Answer -calculate strengths and deflections, foundation sizes,
beam thickness, and strength of floor slabs

building can withstand nature

Mechanical Engineers - Answer -design heating, cooling, water supply, and sanitary
systems

Electrical Engineers - Answer -calculate overall electrical load required, size equipment
accordingly

determine amount of lighting required

Civil Engineers - Answer -determine location of a project on a site (actually the surveyor
does this)

design roads, bridges, tunnels

Surveyors - Answer -measure distances and elevations of land surfaces

site development

Constructor - Answer -professional responsible for all construction activities, GC or CM

can be brought in before architect to advise owner

Estimators - Answer -prepare a complete list of all job costs

Schedulers - Answer -define distinct construction activities and understand the
relationships among the activities

monitor job progress, coordinate subs, analyze changes and impact of delays

, Purchasing Agents - Answer -buy subcontracts once a job is won

get best price while ensuring all contract requirements are met

Specialty Contractors - Answer -hired by and work directly for a general contractor

supply most material and labor on a job

Trades - Answer -have specialized knowledge

Material Suppliers - Answer -manufacture, fabricate, and install materials and
components

form trade associations that establish level of quality for each product

Equipment Suppliers - Answer -sell or rent

who maintains and who operates

Construction Project Manager - Answer -first person assigned to project

configures project team, schedules the job, and sets up cost control system

Superintendent - Answer -interact with subs, coordinate flow of workers, supplies, and
equipment to ensure schedule is met

negotiate disputes between trades

first to know about problems on site, offer solutions

Field Engineer - Answer -assigned to handle various documents that flow thru a field
office

follow up on owner requests

communicate with tenants

Authority - Answer -decision making power

power to exact obedience

position power, established by organizational structure

Personal Power - Answer -based on the individual

Decision Making - Answer -balance between centralized and decentralized operations

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller millyphilip. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $12.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

77254 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$12.49
  • (0)
  Add to cart