100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
NERC Certification Exam Latest Update Questions and 100% Verified Correct Answers Actual Exam Guaranteed A+ $20.49   Add to cart

Exam (elaborations)

NERC Certification Exam Latest Update Questions and 100% Verified Correct Answers Actual Exam Guaranteed A+

 13 views  0 purchase
  • Course
  • NERC Certification
  • Institution
  • NERC Certification

NERC Certification Exam Latest Update Questions and 100% Verified Correct Answers Actual Exam Guaranteed A+

Preview 3 out of 26  pages

  • August 14, 2024
  • 26
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • NERC Certification
  • NERC Certification
avatar-seller
Tutordiligent
NERC Certification Exam Latest Update 2024-
2025 135 Questions and 100% Verified Correct
Answers Actual Exam Guaranteed A+

(NIA - NIS) - 10 β (FA - FS) - IME is the formula for the __________ equation? -
CORRECT ANSWER: ACE (Area Control Error) Equation


A __________ shall take all appropriate actions up to and including shedding firm load,
or directing the shedding of firm load, in order to return the system from an IROL or
SOL? - CORRECT ANSWER: Transmission Operator


A _________experiencing a reportable incident as detailed by the NERC or DOE
reporting procedures shall provide a preliminary written report to its Regional Reliability
Organization and NERC/DOE.


A) Generator Operator


B) Load Serving Entity


C) Reliability Coordinator


D) All of the above - CORRECT ANSWER: D) All of the above


A BA or RSG has how long to replace its Contingency Reserves?


A) 60 mins


B) 30 mins

,C) 90 mins


D) 15 mins - CORRECT ANSWER: C) 90 mins


A BA that is part of a multiple BA Interconnection that is not receiving overlap regulation
and uses a fixed Frequency Bias Setting must have its calculated setting validated by
the - CORRECT ANSWER: ERO (Electric Reliability Organization)


A Balancing Authority that is a part of a pseudo-tie in which the generator is physically
located is known at which of the following? - CORRECT ANSWER: Native BA
(Balancing Authority)


According to the NERC Standards, the Distribution Provider is required to have
Interpersonal Communication capabilities with which of the following? (Select all that
apply) - CORRECT ANSWER: Its Balancing Authority, Its Transmission Operator


After any event that results in an IROL violation, the Transmission Operator shall return
its transmission system to within IROL as soon as possible, but not longer than _____
minutes.


A) 15 mins


B) 30 mins


C) 45 mins


D) 10 mins - CORRECT ANSWER: B) 30 minutes


All of the following except ______ that owns a transmission protection system shall
analyze all protection system mis-operations and shall take corrective actions to avoid
future mis-operations? - CORRECT ANSWER: Load Serving Entity

, All of the reasons listed below can be a cause of inadvertent accumulation except -
CORRECT ANSWER: Market response


As a minimum, the BA must provide its System Operators with real-time values for all of
the following except ______ with each adjacent BA. - CORRECT ANSWER: MVAR
flows


At a minimum Balancing Authorities shall have operating agreements with
_____________ that shall, contain provisions for emergency assistance, including
provisions to obtain emergency assistance from - CORRECT ANSWER: Adjacent
Balancing Authorities
&
Remote Balancing Authorities


BA, RC, and TOPs are required to assess adherence to their documented
communications protocols for issuing and receiving Operating Instructions on what
interval? - CORRECT ANSWER: Once every 12 months (annually)


Balancing Areas utilize AUTOMATIC GENERATION CONTROL (AGC) to_____? -
CORRECT ANSWER: Adjust balancing authority area's demand and resources to help
maintain the reporting ACE


BAs use ______ to automatically direct the loading of regulating reserves on their
system. - CORRECT ANSWER: AGC (Automatic Generation Control)


Based on the information provided in the module, communications are NOT critical to
the operation of the electric power system. - CORRECT ANSWER: False


Control Performance Standard 2(CPS 2) was replaced as a Balancing Authority
performance measure by which of the following measures? - CORRECT ANSWER:
BAAL (Balancing Authority ACE Limit)


CPS1 Measures Control Performance by?

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Tutordiligent. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $20.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79223 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$20.49
  • (0)
  Add to cart