100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
LEED AP O&M EXAM 2024/2025 WITH 100% ACCURATE SOLUTIONS $16.49   Add to cart

Exam (elaborations)

LEED AP O&M EXAM 2024/2025 WITH 100% ACCURATE SOLUTIONS

 3 views  0 purchase
  • Course
  • LEED AP O&M
  • Institution
  • LEED AP O&M

LEED AP O&M EXAM 2024/2025 WITH 100% ACCURATE SOLUTIONS

Preview 4 out of 73  pages

  • August 12, 2024
  • 73
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • LEED AP O&M
  • LEED AP O&M
avatar-seller
YANCHY
LEED AP O&M EXAM 2024/2025 WITH
100% ACCURATE SOLUTIONS


A project team is assessing existing luminaires for Light Pollution
Reduction and found some fixtures emit light at a vertical angle more
than 90 degrees from straight down. What statement is true regarding the
project's ability to earn the credit? - Precise Answer ✔✔The team must
retrofit or replace the non-compliant fixtures to earn the credit


An office building has six individual workstations, two private offices,
and a conference room. What lighting control configuration would meet
the requirements of EQ Credit Interior Lighting? - Precise Answer
✔✔Individual lighting controls for four workstations and multizone
control for the conference room.
There are 8 individual occupant spaces, so any combination that equals
50% of the individual spaces would count as meeting the requirements.


When occupancy data is entered into the indoor water use calculator, it
is split by default to a 50/50 gender ratio. Under which circumstance
should this be ratio changed? - Precise Answer ✔✔A project can alter
the default ratio if it is justified. Same-sex schools are one example.


What frequency of recording data is required during the performance
period for WE Credit Water Metering? - Precise Answer ✔✔All meters,
including whole-building meter, must be recorded at least weekly and
used in a regular analysis of time trends

,Typical end uses for a commercial office building that may require
advanced metering for EA Credit Advanced Energy Metering include all
of the following except: - Precise Answer ✔✔Projects must sub-meter
all energy end uses that are at least 20% of the total building energy use
excluding plug loads.


A project team has an existing building commissioning plan resulting
from the analysis of the building. What can this document serve as the
foundation of? - Precise Answer ✔✔The Ongoing Commissioning
credit can use existing building commissioning plan to create the
ongoing commissioning plan.


A project team for an office building took daylight measurements in all
regularly occupied spaces in the month of June. Which action must
occur for the project to achieve Daylight Measurement for EQ Credit
Daylight and Quality Views? - Precise Answer ✔✔Two measurements
must be taken for the option.


How frequently should occupant surveys be performed to achieve IEQ
Credit Occupant Comfort Survey? - Precise Answer ✔✔Perform at least
one survey and implement corrective actions. At a minimum, perform
one new survey at least once every 2 years.


As an alternative refrigerant to HCFC a project team is considering
HFC-410A. What is the trade-off to when using HFC-410A in the
HVAC&R system? - Precise Answer ✔✔It has a lower GWP but
require more energy to achieve the same level of cooling.

,Who should be included in the project team for SS Credit Site
Improvement Plan? - Precise Answer ✔✔Anyone having to do with the
land should be involved with this credit as part of the integrated team:




Landscape architect
Hydrologist
Civil engineer
Restoration ecologist
Landscape designers
Maintenance staff


Project teams should coordinate the solid waste management policy and
the environmentally preferred purchasing policy in what areas? - Precise
Answer ✔✔Areas such as source reduction, contract agreements,
communications with building occupants overlap between the two
policies.


A project team is inventorying the regularly occupied spaces of an office
building occupied by one tenant. Under what circumstances could any of
the regular occupied spaces be excluded from the requirements of
daylighting? - Precise Answer ✔✔When tasks would be hindered by the
use of daylight
This is the only exception allowed.

, A project team is reviewing a project's goals. What type of analysis
would be appropriate for existing building commissioning? - Precise
Answer ✔✔The focus is on proper system operations
The Existing Building Commissioning option focuses more on controls,
proper system operations and efficiency improvements.




The other choices would benefit from an ASHRAE Level 2 Energy
Survey and Analysis.


The classification of a sink in a mixed-use project is unclear. Which
action should the LEED AP take when performing the indoor water-use
calculations? - Precise Answer ✔✔Classify the sink as public
If the classification for public or private use is unclear, default to public
use flow rates when performing the calculations


A school project is located in an area the does not provide composting
services. What can the project team do during the performance period to
earn MR Credit Solid Waste Management - Ongoing? - Precise Answer
✔✔Implement an awareness program that encourages occupants to
reduce food waste
An education program has to be in place for the credit during the
performance period


The WaterSense Water Budget tool uses which variables to determine
how much water a project needs? - Precise Answer ✔✔Each location's
rainfall .

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller YANCHY. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $16.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

76799 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$16.49
  • (0)
  Add to cart