cm. 1011-module 2 questions and answers 100% correct 2024/2025

Preview 2 out of 7  pages

  • August 11, 2024
  • 7
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Cm. 1011-module 2
  • Cm. 1011-module 2
avatar-seller
agnesjason
cm. 1011-module 2




marketing efforts

The ultimate goal of marketing efforts often is to gain opportunities to negotiate with owners for
projects as opposed to having to compete.

public projects

Public projects have historically been decided by selection of the lowest responsive bid in conformance
with the bid requirements from a responsible bidder.

private projects

Private projects may use an open bid process, but usually use the closed bid process where only certain
constructors are asked to bid on the project. A closed bid process uses an Invitation for Bids, or Request
for Proposals, to request constructors to be involved.

public-private partnerships

this is a hybrid collaboration between a public entity and a constructor sometimes known as a PPP, or a
P3. It combines the resources of both types of organizations usually to deliver a building for public use.

competition criteria and project delivery

there are really only two competition criteria used to determine the chosen constructor: price and
qualifications, or a combination of the two. In the traditional delivery method, that is the design-bid-
build method, the primary criterion is price. Qualifications is the primary criterion when an agency CM
choice is made. With at-risk CM and design-build a combination of the two criteria is used for the choice.

selection methods

There are basically three selection methods used for selecting construction and construction
management services.

low bid

The traditional design-bid-build low-bid method uses an invitation for bids (IFB) solicitation process.
PlayMuteLoaded: 0%3:050:00

best value

The best-value method uses a request for proposals (RFP) solicitation process.

qualiifications-based

The qualifications-based method uses a request for qualifications (RFQ) solicitation process.

, Competitive
Pre-estimate
Bid Questions

What type of project is it?
Is the location of the project acceptable?
Are the owner/designer acceptable?
Is there enough time to put together a bid?

Competitive Bid Package

Prepares estimate
Adds office overhead and profit
Tabulates the bid

Competitive Bid Process

Submit bid timely
All public bids opened and made public
Announcement of apparent low bid
Bid review period where public entity checks all bids for mistakes
Bidder qualifications review

best value selection

Used primarily in design-build method
Qualifications of design team and construction team considered

About Qualifications-Based Selection

Used by private owners
Any format chosen by owner

what is a construction document?

Any contract is an agreement by two or more parties to mutually exchange something of equal value, be
it for services or products.

contract documents

The Contract Documents are composed of two types of documents: (1) the plan drawings, and (2) the
project manual that includes many documents whether included in a bound manual or separately bound
or provided.

the drawings

Being able to read and understand a set of construction drawings is the most important basic skill a
construction manager must have.

drawing production

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller agnesjason. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $12.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75759 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$12.99
  • (0)
  Add to cart