100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
2024 AEC 300 STUDY GUIDE EXAM WITH CORRECT ANSWERS $13.09   Add to cart

Exam (elaborations)

2024 AEC 300 STUDY GUIDE EXAM WITH CORRECT ANSWERS

 6 views  0 purchase
  • Course
  • AEC 300
  • Institution
  • AEC 300

2024 AEC 300 STUDY GUIDE EXAM WITH CORRECT ANSWERS

Preview 2 out of 5  pages

  • August 9, 2024
  • 5
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • AEC 300
  • AEC 300
avatar-seller
Elitaa
2024 AEC 300 STUDY GUIDE EXAM
WITH CORRECT ANSWERS

What type of Specifications are considered the traditional type? - CORRECT
ANSWERS-Prescriptive Specifications

Select the DBIA "founding fathers" from the available choice - CORRECT
ANSWERS-Jim Gray, Preston Haskell

Who are the designers in the Design-Build organization? - CORRECT
ANSWERS-Architects and Engineers

What is the purpose of having a "Professional Code of Conduct" in any
professional organization? - CORRECT ANSWERS-All options are valid

What is the difference between a "Professional and a Non-Professional? -
CORRECT ANSWERS-One has to conduct themselves at a higher level of
responsibility than the other

In what year did the DBIA official become established? - CORRECT ANSWERS-
1993


How many "founding fathers" were there at the beginning of DBIA in 1993? -
CORRECT ANSWERS-5

Is Design-Build the fastest "growing" project delivery method in the Nation? -
CORRECT ANSWERS-True

What is a very important factor for the Design-Build project delivery
method's success? - CORRECT ANSWERS-All members of the Design-Build
team communicate with each other continuously during the project delivery
process

In comparing Design-Bid-Build against the Design-Build project delivery
method, which approach offers the one source of responsibility for the
project outcome? - CORRECT ANSWERS-Design-Build

Which of the following is the correct definition of "cost model"? - CORRECT
ANSWERS-A framework for identifying and quantifying all project costs
relative to a conceptual design in a systematic fashion.

, Which of the CSI resources would be more useful in an early, preliminary
stages of the Design-Build Estimate? - CORRECT ANSWERS-UniFormat™

What does the concept of "contingency" entail or mean in terms of
construction? - CORRECT ANSWERS-An amount of money added to an
estimate to account for various unknown factors at the time the estimate is
initially developed

What is the meaning of "conceptual estimating"? - CORRECT ANSWERS-An
estimating process to determine project costs when the design is less than
100% complete

What is the "engineering estimate" used for? - CORRECT ANSWERS--To check
for initial project flaws and establish a budget.

-To check for project clash items and establish a budget.

Who was the Citizen Architect? - CORRECT ANSWERS-Sam Mockbee

What is the meaning of a BIMstorm? - CORRECT ANSWERS-An innovative use
of collaborative technologies to partner with many constituents in different
locations

Design-Bid-Build project delivery method can be the best option in some
cases - CORRECT ANSWERS-True

Design-Build-Bid project delivery method will always be the lowest final cost
for the construction of a project - CORRECT ANSWERS-False

Having been through the course, and learning about the Project delivery
method of "Design-Build" you may consider another option for your career
path... - CORRECT ANSWERS-?
True
False
Cannot determine



Was the construction industry organization the (AIC) American Institute of
Constructors, the first to establish a code of conduct that moves the
discipline to a professional level? - CORRECT ANSWERS-Yes

What are the three most used project delivery methods in the US? -
CORRECT ANSWERS-Design-Build
Construction Management @ Risk
Design-Bid-Build

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Elitaa. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $13.09. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

76747 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$13.09
  • (0)
  Add to cart