100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Journeyman Electrician (2020Nec) Latest Update Actual Exam Questions and 100% Verified Correct Answers Guaranteed A+ $20.49   Add to cart

Exam (elaborations)

Journeyman Electrician (2020Nec) Latest Update Actual Exam Questions and 100% Verified Correct Answers Guaranteed A+

 13 views  0 purchase
  • Course
  • Journeyman Electrician
  • Institution
  • Journeyman Electrician

Journeyman Electrician (2020Nec) Latest Update Actual Exam Questions and 100% Verified Correct Answers Guaranteed A+

Preview 2 out of 13  pages

  • August 5, 2024
  • 13
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Journeyman Electrician
  • Journeyman Electrician
avatar-seller
Tutordiligent
Journeyman Electrician (2020Nec) Latest Update
2024-2025 Actual Exam Questions and 100%
Verified Correct Answers Guaranteed A+

.Where a 125-volt, 15-ampere receptacle is connected to a 120-volt branch circuit
supplying two (2) or more receptacles or outlets, the maximum permitted cord-and-plug-
connected load to the receptacle is _____.
a. 12 amperes
b. 15 amperes
c. 10 amperes
d. 7.5 amperes - CORRECT ANSWER: 12 amperes


Article 210 provides the general rules regarding branch circuits. Branch circuit and
receptacle ratings are addressed in Part II of Article 210. To prevent overheating
receptacles, a receptacle shall not supply a total cord-and-plug-connected load in
excess of the maximum specified in Table 21(B)(2), where connected to a branch circuit
supplying multiple receptables or other outlets. This table shows a 15-ampere rated
receptacle may carry a maximum cord-and-plug-connected load of 12 amperes under
this condition.


According to the NEC, fixed outdoor deicing and snow melting equipment is to be
considered as a _____ load.
a. non-continuous
b. intermittent
c. continuous
d. simultaneous - CORRECT ANSWER: continuous
As defined in Article 100, a continuous load is a load expected to continue for three (3)
hours or more.The installation requirements for fixed outdoor electric deicing and snow
melting equipment are given in Article 426. As per Section 426.4, fixed outdoor electric
deicing and snow melting equipment shall be considered a continuous load.When sizing
conductors and overcurrent protection for the fixed outdoor equipment you must take
into consideration the equipment can operate over 3 hours, so it is considered a
continuous load.

, Conductors with _____ marked on the insulation are NOT approved for use in a wet
location.
a. THW
b. THHW
c. THHN
d. THWN - CORRECT ANSWER: THHN
As shown in Table 310.104(A), conductors with THHN insulation are approved for use in
dry and damp locations only and conductors with THWN, THHW, and THW insulation
are recognized for use in dry and wet locations.


For a building or structure where the meter enclosure is adjacent to the service
disconnecting means, it is permitted to ground the meter enclosure to the _____
conductor on the load side of the service disconnect if ground-fault protection is not
provided.a. grounded
b. grounding
c. bonding
d. phase - CORRECT ANSWER: grounded
Part VII of Article 250 covers the general requirements for methods of equipment
grounding.Exception No.2 to Section 250.142(B) permits the meter enclosure to be
grounded by connection on the load side of the service disconnect where (1) no ground-
fault protection is installed, (2) the meter enclosure is adjacent to the service
disconnecting means, and (3) the grounded service conductor is not smaller than the
size specified in Table 250.122.


For dwelling units, GFCI protection is required for all single-phase, 125-volt, 15- and 20-
ampere receptacles installed within six (6) feet of the top inside edge of the bowl of
sinks located in _____.
a. laundry rooms
b. bathrooms
c. garages
d. all of these areas - CORRECT ANSWER: all of these areas

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Tutordiligent. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $20.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79079 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$20.49
  • (0)
  Add to cart