100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Ch. 9 & 10 Printreading for Residential and light commercial questions and correct answers (elaborations) with 100% accurate , verified , latest fully updated , 2024/2025 ,already passed , graded a+, complete solutions guarantee distinctions rationales| 5 $7.99   Add to cart

Exam (elaborations)

Ch. 9 & 10 Printreading for Residential and light commercial questions and correct answers (elaborations) with 100% accurate , verified , latest fully updated , 2024/2025 ,already passed , graded a+, complete solutions guarantee distinctions rationales| 5

 14 views  0 purchase
  • Course
  • Commercial Construction
  • Institution
  • Commercial Construction

Ch. 9 & 10 Printreading for Residential and light commercial questions and correct answers (elaborations) with 100% accurate , verified , latest fully updated , 2024/2025 ,already passed , graded a+, complete solutions guarantee distinctions rationales| 5-star rating

Preview 2 out of 5  pages

  • August 5, 2024
  • 5
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Commercial Construction
  • Commercial Construction
avatar-seller
AnswersCOM
Ch. 9 & 10 Printreading for Residential and light
commercial
______ is a groove in a lift or placement of concrete that is filled with concrete of the next lift -
ANS-keyway

_________ locations are shown with heavy solid lines - ANS-Steel beam

____________ locations are indicated with heavy broken lines on the second and lower roof
framing plan. - ANS-Bar joist

______________ is generally measured at the point where airflow enters the equipment and
where the airflow exits the equipment - ANS-Total external static pressure

______________ on the panel GP-1 circuit indicates that it has a CB lock - ANS-Circle

A ____________ is constructed near the southernmost skylight to diver water around the
skylight and toward the roof drain. - ANS-Cricket

A ______________" diameter service line is provided for fire protection throughout the building.
- ANS-6

A roofing membrane is attached with a required minimum _____" overlap between the adjoining
sheets. - ANS-3

An ____ gal hot water tank provides water service throughout the building. - ANS-100

An ____________ is a revised drawing that is prepared by a contractor at the conclusion of a
project. - ANS-As-built

An ____________ is shown as jan. 105 and has a slop sink. - ANS-janitors closet

an ______________ is a battery-powered light that automatically turns on if a building
experiences a power outage. - ANS-Battery emergency light

Cat boarding 207 has one ______________ CFM ceiling exhaust fan that is described in the
exhaust fan schedule. - ANS-150

Curbs and pavement for the parking area are shown on the _____ plan. - ANS-Grading and
utility

, Each circuit breaker is described in terms of the trip amperes per CB and the ______________
- ANS-Number of poles

Each parking lot light is supported by a 24" diameter concrete pier that must be a min of
______________ below the parking lot surface. - ANS-60"

Each parking lot light is supported by a 24" diameter concrete pier that must be a minimum of
_____" below the surface - ANS-60

Existing surface drain piping and inlets are to be disabled and filled with ____________ -
ANS-Gravel

Indoor yard/boarding 151 has two sets of _____ installed in the southwest and northeast
corners. - ANS-house bibbs

Interior footings are indicated with dashed lines on the ____________ plan - ANS-foundation

One MBH is equal to ______________ Btu per hour - ANS-1000

One volt ampere is equal to ______________ watts - ANS-1

Sheet ______________ provides information about the HVAC installation for the second floor
zone. - ANS-M-2

T or F

A battery standby exit sign, indicated as fixture type F7 or F33 on the prints, is an exit sign that
uses a battery as a backup power source if the building experiences a power outage. - ANS-T

T or F

A different gridline system is used on the second floor plan as the foundation plan and the first
floor plan. - ANS-F

T or F

All exterior wall and interior partition dimensions are given on the first floor plan. - ANS-T

T or F

Light fixtures to be installed around the outside of the building are shown with circles containing
letters that relate to the electrical fixture schedule located on specifications-Electrical, sheet E-7
- ANS-F

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller AnswersCOM. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $7.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79223 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$7.99
  • (0)
  Add to cart