100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
CNST 201 final || with Accurate Answers 100%. $10.99   Add to cart

Exam (elaborations)

CNST 201 final || with Accurate Answers 100%.

 10 views  0 purchase
  • Course
  • CNST 201
  • Institution
  • CNST 201

does not define the bond between an A/E/C and in the contract documents correct answers Invitation to bid Documents that cover the qualitative items of the project correct answers Technical specifications WHich portion of the contract documents establishes the rights, authority, and obligatio...

[Show more]

Preview 2 out of 7  pages

  • August 4, 2024
  • 7
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • CNST 201
  • CNST 201
avatar-seller
FullyFocus
CNST 201 final || with Accurate Answers 100%.
does not define the bond between an A/E/C and in the contract documents correct answers
Invitation to bid

Documents that cover the qualitative items of the project correct answers Technical
specifications

WHich portion of the contract documents establishes the rights, authority, and obligations of the
contracting parties correct answers General conditions

When there is a conflict between drawings and technical specifications, which takes presidency
correct answers The contract will stipulate

Which of the following is not an additional contract obligation correct answers both are contract
obligations

Documents that represent the physical, quantitative, and or visual description of the project
correct answers Drawings

Bidding documents, general conditions, supplemental provision, and technical specifications are
part of which area of the contract documents correct answers Project manual

Who owns the design in a private/negotiated contract correct answers dictated by the contract

This part of the contract documents amends or augments the general conditions correct answers
supplementary provisions

Which specification type is a closed specification that states what is to be used without variance
or alternative correct answers Proprietary

A subcontractor is bidding on unit masonry for a project, which of the following is not true with
regard to the subcontractors responsibilities when reviewing the technical specifications correct
answers the subcontractor is only responsible for the section he/she is bidding and no others

Submittal requirements for a project are contained in the specifications of the contract correct
answers true

Who should initiate submittals correct answers Subcontractor and/or suppliers

The management of submittals also help the general contractor by correct answers checking the
validity of the construction schedule

who is responsibile for approving all submittals correct answers architect

, The construction team must submit everything that the specifications require as a minimum
correct answers true

once received back from the architect, all submittals should be correct answers reviewed for
changes

Submittals are one of the final design steps and also one of the first steps in quality control
correct answers true

the less documents that are received back from an owner or architect with an approval signature
and stamp on them, the better off the subcontractors and suppliers are correct answers false

which of the following is a submittal correct answers all of the above 3

when an owner holds back a portion of the monthly payment to assure the contractor and
subcontractors stay focused on completing the project this is called correct answers retainage

what percentage of retainage is typically withheld correct answers 5-10%

it is common practice to pay for materials that are stored off site correct answers false

it is not the responsability of the general contracotr to assist the owner in paying completely and
promptly correct answers false

traditionally how often are request fro payments submitted correct answers monthly

where is the format and time frame for submitting payment requests found in the contract correct
answers general conditions

what type of payment request does the following represent? request made on actual expenses,
invoices and payroll reports are submitted with request correct answers cost- plus and guaranty
maximum price

general contractor payment terms are dictated by the contract, however it is customary for the
owner to pay by the 10th of the following month correct answers 10th

retention and retainage are the same thing correct answers true

an agreed upon breakdown of the contract cost that is usually required to be submitted after the
execution of the contract, and after subcontractors have been bought out is called correct answers
schedule of values

Method of contracting pricing used when exact quantities are not know at he time the contract is
executed correct answers unit-price contracts

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller FullyFocus. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $10.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75632 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$10.99
  • (0)
  Add to cart