100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
CDT Exam 2 Questions with Complete Solutions 2024/2025 $12.99   Add to cart

Exam (elaborations)

CDT Exam 2 Questions with Complete Solutions 2024/2025

 9 views  0 purchase
  • Course
  • CDT
  • Institution
  • CDT

CDT Exam 2 Questions with Complete Solutions 2024/2025 Why would the cost of the project at close out be different than the total bid price when using unit prices and be acceptable? A) The bid form was incomplete. B) There was a difference between the field measured quantities and the anti...

[Show more]

Preview 4 out of 73  pages

  • August 3, 2024
  • 73
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • CDT
  • CDT
avatar-seller
Bensuda
CDT Exam 2 Questions with Complete
Solutions 2024/2025

Why would the cost of the project at close out be different than the total bid price when using unit
prices and be acceptable?

A)

The bid form was incomplete.

B)

There was a difference between the field measured quantities and the anticipated quantities.

C)

The cash allowance was too small to cover the extent of the work.

D)

The unit price was too small to cover the extent of the work. - ANSWERSB)

There was a difference between the field measured quantities and the anticipated quantities.



An Alternate becomes a part of the Contract Documents:

A)

When the bids are opened.

B)

When the Owner makes his decision to accept.

C)

On Architect/Engineer's recommendation.

D)

When stipulated in the Owner-Contractor Agreement. - ANSWERSD)

When stipulated in the Owner-Contractor Agreement.



Bid shopping is the practice of:

A) Negotiating with two of more subcontractors for the lowest price

,B) Revealing the sub bid of one subcontractor to another to obtain a lower price

C) Encouraging cost cutting between subcontractors in Value Analysis

D) Achieving the lowest sub bid for the Owners Benefit. - ANSWERSB



During project conception, the four major values to be determined are:

A)

economy, time, insulation, form.

B)

function, economy, time, problem.

C)

time, economy, form, goals.

D)

function, form, economy, time. - ANSWERSB



Which of the following will the courts use to interpret specifications in the same manner as they
interpret contracts?

A)

Autonomy to contract

B)

General takes precedence over specific.

C)

Professional negligence

D)

Construction for the drafter - ANSWERSA



Submittal requirements for Facility Services Divisions 21 through 28 are specified in:

A)

The first section in each respective division

B)

,Supplementary Conditions

C)

Division 01 Section Submittal Procedures

D)

Section 01 12 00 Summary of Multiple Contracts - ANSWERSC



Which of the following is a primary characteristic of Integrated Project Delivery?

A)

Schematic Design is performed by the Contractor

B)

Recognition that intensified planning results in efficiency and savings during execution

C)

IPD can only be used with the Design Build delivery method

D)

Reduced efficiency of Project Commissioning - ANSWERSB



A detailed description of an Alternate should be located in:

A)

The Bid Form.

B)

Division 01.

C)

The Agreement.

D)

Sections in Divisions 2-49. - ANSWERSB



Which of the following groups of Article Headings would occur in Part 1 of the Three-Part
SectionFormat?

A)

, Fabrication, quality assurance, and references.

B)

References, submittals, and field quality control.

C)

References, submittals, and quality assurance.

D)

Warranties, allowances, and schedules. - ANSWERSC



The Contractor should begin preparation and delivery of the preconstruction submittals after which
event?

A)

Bid opening

B)

Notice to proceed

C)

Execution of agreement

D)

Preconstruction meeting - ANSWERSB)

Notice to proceed



During the bidding process:

A)

Bids may be discussed before the set time of their opening.

B)

Subcontractors may not use Bid Depositories.

C)

The Contractor should expect his potential Subcontractors to review those plans available in plan rooms.

D)

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Bensuda. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $12.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75057 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$12.99
  • (0)
  Add to cart