100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
NCCCO Core Exam Prep (2023/ 2024 Update) Questions and 100% Correct Verified Answers| Grade A $17.99   Add to cart

Exam (elaborations)

NCCCO Core Exam Prep (2023/ 2024 Update) Questions and 100% Correct Verified Answers| Grade A

 2 views  0 purchase
  • Course
  • Institution

NCCCO Core Exam Prep (2023/ 2024 Update) Questions and 100% Correct Verified Answers| Grade A

Preview 2 out of 11  pages

  • August 1, 2024
  • 11
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
avatar-seller
NCCCO Core Exam Prep (2023/ 2024 Update) Questions
and 100% Correct Verified Answers| Grade A


What is the purpose of installing an auxiliary boom point sheave to the main boom
tip? - ANSWER Separate hoist lines

A designated Lift Director shall be assigned by the ______? - ANSWER Site
Supervisor

Who is responsible for calculating net capacity? - ANSWER Crane Operator

Who is responsible for ensuring all rigging is supervised by a Qualified Rigger? -
ANSWER Site Supervisor/ Lift Director

Who is responsible for ensuring the crane owner is notified of any damage to the
crane or replacement/repair of wire rope? - ANSWER Crane User

Who is responsible for restricting unauthorized access to the crane's work area? -
ANSWER Site Supervisor/Lift Director

Who is responsible for ensuring the crane owner is notified of any damage to the
crane or replacement/repair of wire rope? - ANSWER Crane User

Who is responsible for ensuring crane operations are stopped if alerted to an unsafe
condition? - ANSWER Lift Director

If the operator or A/D determine that ground conditions are not suitable for the
equipment being operated, they should request the _________ correct the issue -
ANSWER Controlling Entity

Who is responsible for ensuring that personnel involved in crane operations
understand their responsibilities, assigned duties and associated hazards? -
ANSWER Lift Director

When can the operator of a crane set the crane up with less than fully extended
outriggers? - ANSWER When the load chart allows

The outrigger pad and cribbing should be strong enough to support? - ANSWER
The total weight of the crane and the load

What must be known prior to setting up your crane? - ANSWER Location of
underground vaults

What is the minimum distance the flange on the hoist drum should extend above the
last wrap of rope? - ANSWER ½ inch

, Eccentric main boom tip reeving will - ANSWER Twisting of the boom

What is the most common wire rope used on most cranes? - ANSWER Right
regular lay

Prior to leveling a crane what should be done with the outrigger jack? - ANSWER
Secure the float pad to jack cylinder

What three functions will not work after two-blocking a crane that has a prevention
system? - ANSWER Boom down, extend the boom and hoist

Boom angle on a telescoping boom is measured from above or below horizontal to
the _________? - ANSWER Longitudinal axis of the boom base section

The line pull of the innermost layer on the hoist drum is __________than the
outermost layer. - ANSWER Greater

Side loading of a crane can be caused by? - ANSWER Wind

If power fails to the crane what must the operator ensure is done? - ANSWER The
controls are put in the neutral position

On a multiple crane lift, do not exceed _______ of the load chart. - ANSWER 75%

If a crane operator knows the boom length and the boom angle he could use the
range diagram to estimate what? - ANSWER Load radius

Which of the following jib offsets will have the least amount of capacity? - ANSWER
30 degrees

When is it okay to make modifications to the structure of the crane's upper works? -
ANSWER With written permission from the manufacturer

A sudden stop of the hoist on a crane will produce a what? - ANSWER Dynamic
load

When hoisting personnel from a crane, what must be on the crane? - ANSWER
Anti-two block device

What grade of alloy steel chain should be used for hoisting slings? - ANSWER 80

Each time a line passes from the boom point to the load block it is considered a
_________? - ANSWER Part of line

Which statement about sling angles is correct? - ANSWER As sling angle
decreases, sling stress increases

When installing a wedge socket end termination on the crane the live section of the
rope should be in line with the? - ANSWER Pin

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller michealmuthii. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $17.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

77254 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$17.99
  • (0)
  Add to cart