Exam (elaborations)
Total plant start up and shut down
- Course
- Institution
What is the aim of normal shutdown procedure? To maximise product quality and yield during shutdown What is the shutdown procedure? 1. Feed streams 2. Steam to heat exchangers when a set low flowrate detected in main stream 3. Pumps turned off when set low flowrate is detected in streams...
[Show more]