100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
LEED AP BD+C v4_ Location and Transportation (LT) (1) $7.99   Add to cart

Exam (elaborations)

LEED AP BD+C v4_ Location and Transportation (LT) (1)

 3 views  0 purchase
  • Course
  • Institution

LEED AP BD+C v4_ Location and Transportation (LT) (1)

Preview 4 out of 39  pages

  • July 18, 2024
  • 39
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
avatar-seller
LEED AP BD+C v4: Location and
Transportation (LT)
A developer is building a new supermarket located in an area with the following
uses:

Services Category: 2 restaurants, 1 bank, 1 laundromatCommunity-Serving

Retail Category: 1 pharmacy




Given this information, which statement is true about the project's ability to earn LT
Credit Surrounding Density and Diverse Uses?




A. The project would earn the credit.

B. The project would earn the credit if another use in any category was within
walking distance.

C. The project could earn the credit if another use in a different category was within
walking distance.

D. The project would not earn the credit because the supermarket cannot count as a
service. - CORRECT ANSWER-C. The project could earn the credit if another use in
a different category was within walking distance.




Here are the important points to remember about uses:

A minimum of 4 uses

A use type only counts once (retail store that has a nail salon only counts once)

Uses must come from at least 3 of the 5 categories, exclusive of the building's
primary use

No more than two uses of each type (maximum of 2 restaurants for example)

,Uses that are planned count if they are available within one year of LEED
occupancy.




A school project is located within 1.5 miles walking distance from 916 students in
grades 9-12. The school is expected to have 1,200 students when complete. The
school has built two walking and biking routes, one going north and the other south.
The school has a busing system that uses 6 buses. What is true about the project's
ability to earn LT Credit Access to Quality Transit?




A. The project would need to provide discount public bus passes for students

B. The project would need the city to put a public bus stop next to the school
entrance

C. The project would need to add two more buses

D. The project has earned the credit - CORRECT ANSWER-D. The project has
earned the credit




If at least 50% of the student population is within walking distance the project can
earn the credit.




A retail project includes 30 FTE and 800 daily visitors. The parking lot will have 20
employee parking spaces and 100 visitor parking spaces. How many spaces, and of
what type, are needed for LT Credit Green Vehicles?




A. 6 preferred parking spaces and 3 alternative fueling station spaces

B. 6 spaces for preferred parking, 2 of which also have alternative fueling stations

C. 7 spaces for preferred parking and 6 alternative fueling station spaces

,D. 2 preferred parking spaces and 1 alternative fueling station space - CORRECT
ANSWER-A. 6 preferred parking spaces and 3 alternative fueling station spaces




Parking is based on the number of spaces, not FTE. Mentions of FTE in a question
about parking should be ignored in favor of the total parking capacity, which in this
case is 120.

For LT Credit Green Vehicles, 5% of parking must be preferred, and 2% of parking
must have a fueling station.

The two cannot be combined. Remember to round up.




Which EVSE qualification is required for LT Credit Green Vehicles?




A. Located outdoors and not in a garage

B. Connection to an onsite renewable energy system

C. A Level 1 charging capacity

D. Connection to a network or the Internet for participation in a demand response
program or time-of-use pricing - CORRECT ANSWER-D. Connection to a network or
the Internet for participation in a demand response program or time-of-use pricing




Wi-Fi, Ethernet, or a cellular connection is required so the device can send usage
data to a server and so it can participate in a demand response or time-of-use
service.

, A developer for a residential project in an urban area is reviewing potential sites that
would reduce vehicle distance traveled. Which site would help with this goal and with
achieving LT Credit Bicycle Facilities?




A. A site adjacent to an existing 10-mile (16-kilometer) mountain biking trail

B. A site adjacent to an existing bicycle network that connects to a jobs center
8-miles (12 kilometers) away

C. A site within 3 miles (4800-meters) bicycling distance to 10 diverse uses on a
bicycle network

D. A site within a 1/4-mile (400 meter) walking distance of a bicycle network that
connects to a light rail station within a 1-mile (1,600 meters) bicycling distance. -
CORRECT ANSWER-D. A site within a 1/4-mile (400 meter) walking distance of a
bicycle network that connects to a light rail station within a 1-mile (1,600 meters)
bicycling distance.




The network must be within 200 yards (180 meters) of bicycle storage or a functional
entry.The 1/4-mile (400 meter) walking distance is for access to public transit credit.




Design or locate the project such that a functional entry and/or bicycle storage is
within a 200-yard (180-meter) walking distance or bicycling distance from a bicycle
network that connects to at least one of the following:

- at least 10 diverse uses

- a school or employment center, if the project total floor area is 50% or more
residential or

- a bus rapid transit stop, light or heavy rail station, commuter rail station, or ferry
terminal.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller lydiaomutho. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $7.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

77254 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$7.99
  • (0)
  Add to cart