Observation wells are installed _____the excavation, while monitoring wells are
installed _______the excavation. - ANS-Inside, Outside

After piping areas are backfilled, _______psi air pressure may be maintained in the
piping, provided no product has been in the piping. - ANS-10 psi

In traffic areas, ensure that the trench is sufficiently deep to permit _______inches of
bedding and at least _____ inches of compacted backfill above piping. - ANS-6, 18

T or F - Flexible connectors may be used for non-metallic or metallic piping. - ANS-True

What must be used on all pressurized piping systems to detect leaks? - ANS-PLLD
(Pressurized Line Leak Detector)

Test new piping at _____psi for a period of ____minutes, soaping all joints. - ANS-50
psi, 60 minutes (1 hour)

When sand is used: Sand is backfilled in 12 to 18 inch lifts and compacted after each
lift. This needs to continue to a level that is _____% of the tanks height. - ANS-60%

True of False: Couplings provided to protect pipe threads may be used underground,
provided they are at least 18 inches below grade. - ANS-False. Couplings furnished to
protect pipe threads are disposable, and not to be used.

True or False: Placement of the UST directly on the hold-down pad may be acceptable,
depending on the manufacturer's specifications. - ANS-False: Placement of the the tank
directly on the hold down pad is never permitted.

The _____degree factor should be used to avoid undermining nearby structures. -
ANS-45 degree

At least _____ feet of backfill is required between tanks and between the tank and
excavation walls. - ANS-2 feet

To provide a firm foundation, a tank should be set on a bed of backfill material at least
_____ foot thick. - ANS-One foot

, When a bottom hold down pad is used beneath a steel tank, the thickness of the
bedding material can be reduced to _____ inches. - ANS-6 inches

Pressure imposed on tanks should not exceed _____ psi. - ANS-5 psi

Overfill alarms must be set at ______% of tank capacity. - ANS-90%

The maximum burial depth for Fiberglass tanks is _____ feet. - ANS-7 feet

Five factors that aggravate excavations are: - ANS-1. Ground and surface water
2. Unstable soil
3. Backfill areas
4. Frost
5. Product and Vibrations

Slope of an excavation is determined by what 4 factors? - ANS-1. Soil Conditions
2. Depth
3. Shoring requirements
4. Safety

True or False: A tank shipped with a liquid filled interstice need not be subjected to the
pre-installation air/soap test. - ANS-True

True or False: You should pressurize the interstice with air from the inner tank. -
ANS-True

Pressure testing a tank should be monitored for how long? - ANS-1 hour

True or False: Pressurizing the interstice with air pressure from the inner tank, after
disconnecting the outside source, prevents over-pressurization. - ANS-True

True or False: It is standard practice to lower galvanic anodes by the lead wire. -
ANS-False

Paving over tanks in traffic areas should extend at least _____ inches beyond the
perimeter of the tank. - ANS-12 inches or 1 foot

Regarding tanks: In areas subject to vehicle traffic. At least ____ inches of backfill and
_____ inches of asphalt must be used. - ANS-30 and 6

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller EXAMQA. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $9.39. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75323 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$9.39
  • (0)
  Add to cart