100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
NERC CERTIFICATION EXAM TEST BANK CONTAINS 4 DIFFERENTVERSIONS WITH VERIFIED QUESTIONSAND ANSWERS GUARANTEED PASS ALREADY GRADED A+ LATEST UPDATE $25.48   Add to cart

Exam (elaborations)

NERC CERTIFICATION EXAM TEST BANK CONTAINS 4 DIFFERENTVERSIONS WITH VERIFIED QUESTIONSAND ANSWERS GUARANTEED PASS ALREADY GRADED A+ LATEST UPDATE

 4 views  0 purchase
  • Course
  • Institution

NERC CERTIFICATION EXAM TEST BANK CONTAINS 4 DIFFERENTVERSIONS WITH VERIFIED QUESTIONSAND ANSWERS GUARANTEED PASS ALREADY GRADED A+ LATEST UPDATE NERC CERTIFICATION EXAM TEST BANK CONTAINS 4 DIFFERENTVERSIONS WITH VERIFIED QUESTIONSAND ANSWERS GUARANTEED PASS ALREADY GRADED A+ LATEST UPDATE

Preview 4 out of 130  pages

  • June 28, 2024
  • 130
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
avatar-seller
NERC CERTIFICATION EXAM TEST BANK
CONTAINS 4 DIFFERENT VERSIONS WITH
VERIFIED QUESTIONS AND ANSWERS
GUARANTEED PASS ALREADY GRADED A+
LATEST UPDATE

1. If a 500 kV transmission line with a surge impedance loading of 800 MW is
currently loadedat 1400 MW, which of the following events would most likely
occur?

a. Generator MVAR output would increase
b. All system capacitors would trip off-line
c. Generator MVAR output would decrease
d. All automatic reactors would connect to the system
a. Generator MVAR output would increase
2. When system conditions are such that emergency procedures are expected to
be implemented,which of the following actions should be considered first?

a. Shed firm load
b. Implement Active Load Management
c. Return outaged equipment to service
d. Request a voltage reduction
c. Return outaged equipment to service
3. If your transmission path is rated for 1200 MW and 1000 MW are scheduled
on it, but due toparallel flows the actual flow is 1300 MW, what action should
you take?

a. Request that a phase shifting transformer be installed
b. Reduce interchange transactions impacting the path
c. Request all parallel flow to PSEs to increase schedules
d. Reduce all commercial customer load
b. Reduce interchange transactions impacting the path
4. If your system is MVAR deficient, what action could be implemented to
prevent voltagecollapse?

a. Raise system frequency above 60.5 Hz
b. Shed firm load in the deficient area
c. Separate from the Interconnection
d. Lower transmission voltages

, NERC CERTIFICATION EXAM TEST BANK
CONTAINS 4 DIFFERENT VERSIONS WITH
VERIFIED QUESTIONS AND ANSWERS
GUARANTEED PASS ALREADY GRADED A+
LATEST UPDATE
b. Shed firm load in the deficient area

, NERC CERTIFICATION EXAM TEST BANK
CONTAINS 4 DIFFERENT VERSIONS WITH
VERIFIED QUESTIONS AND ANSWERS
GUARANTEED PASS ALREADY GRADED A+
LATEST UPDATE
5. Which of the following actions can a system operator take in order to maintain
stability on thesystem?

a. Request generators to absorb maximum MVAR
b. Place all operating limits on dynamic calculation
c. Raise system voltages as high as possible, but within their operating parameters
d. Reduce voltages on the transmission system
c. Raise system voltages as high as possible, but within their operating parameters
6. Which of the following actions should you take if an outage on a
neighboring system hascaused a violation on your system?

a. Open all tie-lines to your neighbor
b. Ask the Reliability Coordinator for assistance
c. Shed load to mitigate the violation
d. Wait for the neighboring system to contact you
b. Ask the Reliability Coordinator for assistance
7. If a SOL or IROL violation occurs due to transfers across the system and it is
determined thatparallel flows are contributing to the violation, what should the
system operator do?

a. Place all system capacitors in service
b. Reduce system load
c. Inform the Reliability Coordinator
d. Dump firm load
c. Inform the Reliability Coordinator
8. While performing a pre-outage study, you identify that the transmission
outage will cause a thermal violation on a parallel path, which of the following
actions would be the first one youwould implement?

a. Shed load to mitigate the concern
b. Allow the outage to occur and see what happens
c. Reschedule the outage if possible
d. Allow the outage to take place as long as no load is lost

, NERC CERTIFICATION EXAM TEST BANK
CONTAINS 4 DIFFERENT VERSIONS WITH
VERIFIED QUESTIONS AND ANSWERS
GUARANTEED PASS ALREADY GRADED A+
LATEST UPDATE
c. Reschedule the outage if possible
9. Which of the following actions should the system operator implement first if
transmission linelimits exceed the facilities emergency limits based on a
contingency that has not yet occurred, but their protocols are to respond on a
pre-contingency basis?

a. Reduce voltages in the area of the violation
b. Remove the facility from service

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller erickarimi. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $25.48. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75632 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling

Recently viewed by you


$25.48
  • (0)
  Add to cart